Quote:
Originally Posted by Truenorth00
The biggest factor in average operating speeds is stop spacing. There's no way you'll ever get 10km stop spacing in Ottawa. And if you did that, ridership would be —, because you'd be relying on just 2 stop for riders. So the 80 kph average is just not logical in my books.
|
I think 10 km spacing is completely appropriate. The proposed route parallels existing rapid transit options (Western Transitway/proposed LRT, Baseline LRT, whatever they decide to do with Carling, Trillium Line and SE Transitway). There is no need to build another milk run service to duplicate existing options.