Quote:
Originally Posted by Reecemartin
Do you have a quote or any real confirmation that we won't have 2 entrances and exits? The way you wrote that its as if they have already announced their intentions.
I wouldn't be surprised if they did only do one entrance per station, its the Vancouver way  )))))
|
Nothing direct, but the wording used on the last open house / survey is any indication, I think it is safe to assume that single entrances are being considered.
(for reference, I am talking about the fact that the city of Vancouver had to directly ask / engage with the public about a "possible" second entrance at the Cambie / Broadway Hub.... Like seriously? That even needs to be asked / debated? They were really toying with the idea of only using the existing Canada Line entrance??????)