HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #8721  
Old Posted Apr 3, 2018, 1:24 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
Originally Posted by Hot Rod View Post
so what is the length of a 6-car Mk1 train and how does it compare to a 4-car Mk2 and Mk3?

Are Expo Line platforms going to be lengthened to 120? If so, then would that justify 6-car Mk2 and Mk3 and 8-car Mk1? If we can get these going, SkyTrain will firmly move into full metro capacity. I hope the Millennium Line subway will be built with 120s, with Commercial/Broadway-Arbutus running additional longer trains to the obviously shorter ones coming from Coquitlam.

I wish there was a plan to extend Canada Line to 80m so we could do A-A=A-A; again True metro configs/lengths and capacity. A-C-C-A would be ok as well.
a 6 car mark I train is about 72m long while a 4 car mark II/III is around 67m. The Mark II/III trains are can add a 5th car and still fit within the current platform length.

Expo Line platforms are not getting extended. It's pretty obvious with the station rework done on Metrotown, Joyce, Main Street, and Surrey Central. Any discussion about it really belongs to the Fantasy thread.

As for Canada Line, they are only designed to have max platform length of 50m. Extending beyond 50m is pretty much impossible due to the layout of Bridgeport putting a hard constraint on the entire line.
     
     
  #8722  
Old Posted Apr 3, 2018, 1:33 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,022
Quote:
Originally Posted by nname View Post
75 seconds



They would just have to be turned around at Lougheed instead of Production.
that would be annoying if you are going to SFU to get out and wait around to go one more station
__________________
belowitall
     
     
  #8723  
Old Posted Apr 3, 2018, 2:37 AM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by aberdeen5698 View Post
I don't really get this "A-B" designation for married pairs of Mk 1 and Mk 2 trainsets. If one of the two was a master and the other was just a slave (motors only but no brains) then I'd understand it, but to the best of my knowledge each unit of the pair has identical capabilities. One may act as the master, but they are both capable of it. "A-A" would be a more accurate description, IMHO.
A-B is an old railway term, to identify the 2 ends of a railcar. The B end is the end with the hand brake.

Since MKI, II, and CL all operate at min mated pairs, we use the A-B to reference the orientation only. Labeled individually, the two cars act as one train (with two ends)

So, a MKIII is often referred to as A-C-C-B to indicate it has 2 C cars (no end caps/driver stations) in the middle.


Hope that helps.. I may have gotten off track

https://www.trainorders.com/discussion/read.php?1,624903
     
     
  #8724  
Old Posted Apr 3, 2018, 2:39 AM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by ilikeredheads View Post
a 6 car mark I train is about 72m long while a 4 car mark II/III is around 67m. The Mark II/III trains are can add a 5th car and still fit within the current platform length.

Expo Line platforms are not getting extended. It's pretty obvious with the station rework done on Metrotown, Joyce, Main Street, and Surrey Central. Any discussion about it really belongs to the Fantasy thread.

As for Canada Line, they are only designed to have max platform length of 50m. Extending beyond 50m is pretty much impossible due to the layout of Bridgeport putting a hard constraint on the entire line.

I wonder why they don't start ordering 5 car MKIIIs is it because they can't handle them at the OMC?

What about 3 car MKIIIs (I assume MKIIs are no longer able to be ordered) and connect them to existing MKII fleet to maximize for existing platforms.

This could mean either 5 MKII/III on Expo or perhaps 3 car MKII/III on M Line.
     
     
  #8725  
Old Posted Apr 3, 2018, 4:39 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by TransitJack View Post
I wonder why they don't start ordering 5 car MKIIIs is it because they can't handle them at the OMC?

What about 3 car MKIIIs (I assume MKIIs are no longer able to be ordered) and connect them to existing MKII fleet to maximize for existing platforms.

This could mean either 5 MKII/III on Expo or perhaps 3 car MKII/III on M Line.
In the latest RFI they were looking at ordering "thirty-five 5-car trains (175 vehicles) between 2021 and 2026." They "considering a further eighteen 5-car trains (90 vehicles) between 2029 and 2032."
     
     
  #8726  
Old Posted Apr 3, 2018, 3:28 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:05 AM.
     
     
  #8727  
Old Posted Apr 3, 2018, 5:11 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,588
Quote:
Originally Posted by Reecemartin View Post
Could easily make up the lost time with a gondola.

Lots of transfers is ok when it is the byproduct of lots of lines with good service.
So now you want people to have to transfer trains at Lougheed to travel one more stop and then have to transfer again to a gondola?
     
     
  #8728  
Old Posted Apr 3, 2018, 10:29 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Sheba View Post
So now you want people to have to transfer trains at Lougheed to travel one more stop and then have to transfer again to a gondola?
they are already transferring to a sfu bus at production. no diff using a gondola station there

or move the gondola station to lougheed?
     
     
  #8729  
Old Posted Apr 4, 2018, 12:12 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
the goal should be usability. make the least amount of transfers as possible.

ideally you'd want the Expo-Line and Millennium-Line to stop at the same station the SFU Gondola is. if the system cant do that, then you want the next best thing which is finding out where the most people going to SFU come from; i.e. what line are the coming from. that way the most amount of people have the least amount of transfers.
     
     
  #8730  
Old Posted Apr 4, 2018, 1:05 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,588
Quote:
Originally Posted by jsbertram View Post
or move the gondola station to lougheed?
That would mean travelling over more people's houses - and we know how well that's gone over. Plus with all the redevelopment they might have to shift it west of the station anyway to get away from towers, so instead of being attached to the Skytrain station it's now a distance away.

Also the trip from Lougheed would be further (read: more expensive) than from Production Way. The 'hill' is also steeper on the Lougheed Station side (Burquitlam too).
     
     
  #8731  
Old Posted Apr 4, 2018, 2:24 AM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by dpogue View Post
In the latest RFI they were looking at ordering "thirty-five 5-car trains (175 vehicles) between 2021 and 2026." They "considering a further eighteen 5-car trains (90 vehicles) between 2029 and 2032."
Ok that's cool. Thanks for sharing.
     
     
  #8732  
Old Posted Apr 4, 2018, 2:52 AM
casper's Avatar
casper casper is offline
Registered User
 
Join Date: Nov 2011
Location: Victoria
Posts: 12,739
Quote:
Originally Posted by Sheba View Post
So now you want people to have to transfer trains at Lougheed to travel one more stop and then have to transfer again to a gondola?
Will they do it with one gondola or does it make sense to ha e a gondola transfer station half way up.
     
     
  #8733  
Old Posted Apr 4, 2018, 5:28 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,588
Quote:
Originally Posted by casper View Post
Will they do it with one gondola or does it make sense to ha e a gondola transfer station half way up.
The plan has been to run it non-stop from Production Way up to roughly the bus loop. If you look on a map you'll see that after the Skytrain there's low warehouse type spaces, then sparse residential and then it's all trees until you get to the developments on top of Burnaby Mountain. There's not much point in having a stop in the middle.
     
     
  #8734  
Old Posted Apr 4, 2018, 3:38 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,111
A New York City Lawyer came up with a rather simple idea to extend trains without extending platforms:

Video Link


It's a pretty ingenious idea and it could even work in Vancouver. It's one of 6 ideas to improve New York's Subway: https://www.citylab.com/transportation/2018/03/6-ideas-for-a-better-new-york-subway/555722/
     
     
  #8735  
Old Posted Apr 4, 2018, 3:56 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by twoNeurons View Post
A New York City Lawyer came up with a rather simple idea to extend trains without extending platforms:

It's a pretty ingenious idea and it could even work in Vancouver. It's one of 6 ideas to improve New York's Subway: https://www.citylab.com/transportation/2018/03/6-ideas-for-a-better-new-york-subway/555722/
It is done on some Commuter lines. No reason it couldn't be done on RT lines, so long as going between cars is permitted. Otherwise, what would happen if you are getting on at an A station and getting off at a B station?

Last edited by deasine; Apr 5, 2018 at 4:38 PM.
     
     
  #8736  
Old Posted Apr 4, 2018, 4:25 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by twoNeurons View Post
A New York City Lawyer came up with a rather simple idea to extend trains without extending platforms:
The only limiting factor one needs to consider is the distance between switches, especially right before/after the station or in the OMC. Off memory, at Waterfront, there are switches immediately at both ends of the station which may prohibit or limit how many more cars can be added.

When London added cars for the DLR, certain platforms were lengthened, certain stations were completely rebuilt, and some switches were moved (which is a relatively easy exercise on the DLR), but physical infrastructure was reconfigured and that added quite a bit of cost to the programme.
     
     
  #8737  
Old Posted Apr 4, 2018, 10:30 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
Quote:
Originally Posted by swimmer_spe View Post
It is done on some Commuter lines. No reason it couldn't be done on RT lines, so long as going between cars is permitted. Otherwise, what would happen if you are getting on at an A station and getting off at a B station?
Duh, you get on one of the cars in the middle of the train that is accessible from both A and B stations.

It's actually a brilliant idea.
     
     
  #8738  
Old Posted Apr 4, 2018, 11:01 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,111
Quote:
Originally Posted by aberdeen5698 View Post
You get on one of the cars in the middle of the train that is accessible from both A and B stations.

It's actually a brilliant idea.
Yep, exactly that. The end cars would end up being less busy, but with pass-throughs, it's less of an issue.

For SkyTrain, you'd ideally renovate really busy stations for longer 100m platforms... but it's not 100% necessary.

When we build the broadway line extension building 100m platforms wouldn't be wasted. Outside of the core, you use an A/B stopping pattern and past VCC/Clark, all cars would open all doors. ( I'd strongly consider extending the Commercial Drive platform, though ).

This pattern could be even MORE easily used on the Canada Line, given its wider cars.
     
     
  #8739  
Old Posted Apr 5, 2018, 9:03 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by aberdeen5698 View Post
Duh, you get on one of the cars in the middle of the train that is accessible from both A and B stations.

It's actually a brilliant idea.
That is assuming that most of the riders are also not needing to do the same thing.

The Rocket trains of the TTC could do this.
     
     
  #8740  
Old Posted Apr 5, 2018, 3:08 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:05 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:50 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.