The Concord Lands have advanced more than a little, and are more than just a massing design. In response to the UDP meeting, the project has seen some sculpting and transferring of mass to make the buildings have a stepped effect. The size of the floating restaurant has been reduced, as there were concerns of a visually cluttered waterfront. Happily, that waterfront has seen it's access improved, and now responds better to people of all ability types.
One element still being discussed is whether to implement the required social housing in each building, or whether to just build it all in one. The proposed location for the social housing tower would be the parking lot to the east of Roger's Arena. There are pros and cons to the idea that need to be weighed out, though I imagine it would be more advantageous to Concord to put it all in one.
Obviously, the project will be phased in, with the proposed social housing tower coming in first, potentially as soon as 2021. After that, its imagined that the waterfront towers would come in along with the northern 425 foot tower to best capitalize on the waterfront, while not having to wait for the Plaza of Nations lands to complete. Likely to be last are the towers facing the park for a variety of reasons.
Boards from the November Open House
http://rezoning.vancouver.ca/application...ments/november-open-house-boards_000.pdf