Quote:
Originally Posted by EdmTrekker
There is more to the story than what we are being told. My take is that the posts we are now seeing are not what was ordered (and may not even be from the same suppliers) and is a substitution the City accepted OR the City changed the spec for the supply of these for some reason (but why?) and somewhere in the puzzle is the cause of the delays. And it appears the circular concrete bases were put in place that appear to be the right fit for the posts we see in the public render - but the installed posts have an oblong base - very different as are the design of the posts. Hence my comment as to what the final coverup on the bottom of the poles will look like. Now a citizen should not have to be doncerned with something so simple - but given the long list of major projects fucked up by the City - and seeing the issues on a small job of pole replacment it's enough to send taxpayers out looking for answers.
|
Were they supposed to pour oval piles...

These are the poles that were ordered, I was sent a rough rendering of them a couple years ago and the rendering I already linked to has been on that architect's website for a long time.
http://www.terryfrostdesign.com/#/jasper/ look like magic it shows the actual base cover. Wowwee a tapered sleeve, so complicated, magical and fancy or you know, entirely normal.
Yea, this has gone embarrassingly poorly and run on way too long, but turn down the conspiracy theories.