Interesting to note who designed High Level Bridge suicide barriers. It's almost like Hall D redux
http://edmontonjournal.com/news/politics...r-superior-suicide-barrier-on-high-level
Quote:
DIALOG architects was hired to come up with three options for the High Level barrier. It presented them to council in August 2014.
The first option, a chain-link fence costing $1.2 million, was rejected because it was unsightly. It might prevent suicide, but as Coun. Ben Henderson put it, it would make being on the bridge’s multi-use path an “unpleasant experience.”
The second option, the one council picked, was priced at $3 million. It was to be built inside the existing guardrail and be made up of horizontal tension cables with new steel poles. It was based on a barrier built in Bristol, England, that had cut the suicide rate in half.
The third option was described as “state of the art design.” It cost $7.4 million. It was the only option to be erected outside the old guardrail. It was based on designs from Toronto and Melbourne, Australia. It would angle out from the bridge and have vertical stainless steel tension cables, which are extremely difficult to climb.
In Melbourne, this model had reduced suicides 85 per cent. In Toronto, it eliminated suicides from a bridge hot spot.
“It’s the least climbable of all the options,” said DIALOG’s Donna Clare.
The vertical cable option had one other huge advantage over the other two options: it would stop folks from jumping from the top deck streetcar platform, not just from the multi-use path.
The police had made it clear it was difficult and risky to rescue people off this top deck, as there was nothing there to keep first responders from falling off the bridge.
“This one is the most expensive option, but it also has the most safety features associated with any of the options that have been modelled to date on the bridge,” Clare said.
|
|