The reason that the CCH is crawling forward so very slowly cannot be blamed on city or county elected officials. I have spoke directly with a member of the selection committee and until this hotel project has a major hotelier backing it--it's going absolutely nowhere. No bank is going to provide any sort of financing until this project appears feasible from a large, professional hotel group.
     
     
  #6182  
Old Posted May 2, 2016, 4:04 PM
nushiof nushiof is online now
 
Join Date: Jul 2015
Posts: 260
Quote:
Originally Posted by UTPlanner View Post
The reason that the CCH is crawling forward so very slowly cannot be blamed on city or county elected officials. I have spoke directly with a member of the selection committee and until this hotel project has a major hotelier backing it--it's going absolutely nowhere. No bank is going to provide any sort of financing until this project appears feasible from a large, professional hotel group.
It was reported that DDRM was hoping to get Starwood (Marriott) on board. Is Starwood dragging it feet?
     
     
  #6183  
Old Posted May 2, 2016, 5:16 PM
delts145's Avatar
delts145 delts145 is offline
 
Join Date: Aug 2006
Posts: 20,785
I imagine that the very public recent takeover battle of Starwood between Marriott and the Chinese conglomerate threw a major crowbar in the spokes as far as time element. Now that Marriott has won the battle, I'm sure they still have some major business kinks to iron out in the acquisition. Imo, the Salt Lake City CCH kind of came onto the field of play at a time when it's most attractive potential partner was going through a major growth/change acquisition. If Marriott is going to be the partner, and I think it is, we're just going to have to be patient for a little while longer.
     
     
  #6184  
Old Posted May 2, 2016, 7:10 PM
ajiuO's Avatar
ajiuO ajiuO is online now
 
Join Date: May 2011
Posts: 1,999
Quote:
Originally Posted by nushiof View Post
It was reported that DDRM was hoping to get Starwood (Marriott) on board. Is Starwood dragging it feet?
If I win the lottery this week I will re incorporate the Shilo Inn brand and construct the CCH as the first new Shilo Inn. I will do what I can to incorporate classic red neon design elements.... It will be 50 stories, no stucco. ;-)
     
     
  #6185  
Old Posted May 2, 2016, 7:51 PM
Jdawgboy's Avatar
Jdawgboy Jdawgboy is offline
 
Join Date: Jan 2003
Posts: 5,860
Quote:
Originally Posted by Highrise_Mike View Post
I like the new Austin CCH that FM posted and the Cleveland one is really nice too. I would hope for a little additional height on the Cleveland version and the Austin CCH is over 50 floors so I don't foresee something that tall coming to SLC - although it would be nice The Fort Worth CCH isn't bad and although it's not my first pick, it seems more like something SLC would get.

Actually the Fairmont hotel design was changed its now a wall with 37 floors and is currently under construction. The design is still not too bad though would have preferred the original rendered design.
     
     
  #6186  
Old Posted May 2, 2016, 8:29 PM
asies1981 asies1981 is offline
 
Join Date: Apr 2009
Posts: 1,173
Post on the Bodhi Apartments. This project could be quite the catalyst for the area, pushing more development west of the freeway.
     
     
  #6187  
Old Posted May 2, 2016, 8:37 PM
ajiuO's Avatar
ajiuO ajiuO is online now
 
Join Date: May 2011
Posts: 1,999
Any one know what's going on with the buildings across from UPAC?

     
     
  #6188  
Old Posted May 2, 2016, 9:45 PM
stayinginformed stayinginformed is offline
 
Join Date: May 2008
Posts: 576
Quote:
Originally Posted by Future Mayor View Post
That 75/25 affordable/market mix makes me nervous, particularly the overall mix they are proposing. If it's managed correctly it should be fine, but if management is just a little off the mark it could be a bad thing, resulting in the market rate units not being all that much in demand.

I realize the city needs affordable units and units for the chronically homeless, but I continue to wonder why they don't do a different break down, rather than what is (proposed).
20 - market rate (20)
18 - 80% of median income (0)
19 - 50% of median income (37)
9 - mental illness (9)
9 - physically disabled (9)
5 - Chronically homeless (5)

That is a HUGE discrepancy in income levels in the development, I wonder if the market rate renters are going to feel comfortable. Maybe I'm being short sighted.
Both Poplar Grove and Fairpark Community Council residents are also worried about the high concentration of affordable units within this development, and the trend of high concentrations of affordable units that are currently being planned within the North Temple corridor.

Here is a link to a google map of all the affordable housing in Salt Lake City that has been funded by Low Income Housing Tax Credits LIHTC. https://drive.google.com/open?id=1eOENEIBAfrb4HEdbomqqyOS1aJk&usp=sharing The map is color coded by number of units of affordable housing. This does not include all affordable housing units in the city, but it shows a lot of them, and those funded by are usually at a much lower AMI for their clientele than those funded form other sources.
     
     
  #6189  
Old Posted May 3, 2016, 12:02 AM
ctobsl's Avatar
ctobsl ctobsl is offline
 
Join Date: May 2007
Posts: 486
Here is another "Does anyone know what's going on?".

On the North East corner of 500 East and 200 South there is a 5 or 6 story office building that was fenced off. It is pretty large for the area and looks like it is abandoned. I live across the street from it and was going to take a few photos, but did not get the chance to. Just wondering if anyone knows whats going on with it?
     
     
  #6190  
Old Posted May 3, 2016, 12:05 AM
ToysNoiz's Avatar
ToysNoiz ToysNoiz is offline
 
Join Date: Jul 2013
Posts: 745
Quote:
Originally Posted by ajiuO View Post
Any one know what's going on with the buildings across from UPAC?
There was a basement fire. I believe it is closed.
     
     
  #6191  
Old Posted May 3, 2016, 12:52 AM
Marvland's Avatar
Marvland Marvland is offline
 
Join Date: Oct 2014
Posts: 674
I'm sick of waiting around for CCH news and THIS IS HUGE
     
     
  #6192  
Old Posted May 3, 2016, 2:24 AM
bflatflat9 bflatflat9 is offline
 
Join Date: Feb 2014
Posts: 308
Quote:
Originally Posted by Marvland View Post
I'm sick of waiting around for CCH news and THIS IS HUGE
Wow.
That is huge, and good news.
I guess the tunnel would run underground from terminal to terminal.
Duh.#$?
Who wants to bet even odds that this is done before the CCH?
Sorry to tie that in.
     
     
  #6193  
Old Posted May 3, 2016, 2:37 AM
San Diego-Honolulu San Diego-Honolulu is offline
 
Join Date: May 2015
Posts: 186
Quote:
Originally Posted by bflatflat9 View Post
Wow.
That is huge, and good news.
I guess the tunnel would run underground from terminal to terminal.
Duh.#$?
Who wants to bet even odds that this is done before the CCH?
Sorry to tie that in.
I'd easily bet that the new terminal at the SLC airport gets done before the convention hotel. At this rate and with how I understand how slow projects move along in Salt Lake City, the hotel probably won't be done until 2022, would be my guess. That's if they even build a hotel and if hotel companies are even interested.
     
     
  #6194  
Old Posted May 3, 2016, 3:21 AM
Marvland's Avatar
Marvland Marvland is offline
 
Join Date: Oct 2014
Posts: 674
Quote:
Originally Posted by San Diego-Honolulu View Post
I'd easily bet that the new terminal at the SLC airport gets done before the convention hotel. At this rate and with how I understand how slow projects move along in Salt Lake City, the hotel probably won't be done until 2022, would be my guess. That's if they even build a hotel and if hotel companies are even interested.
I know I'm not supposed to feed the troll but, I'll bite. Our economy is ABSOLUTELY SMOKING both San Diego and Honolulu's economies by every metric.
     
     
  #6195  
Old Posted May 3, 2016, 3:38 AM
Comrade's Avatar
Comrade Comrade is offline
 
Join Date: Jan 2002
Posts: 9,643
The CCH will be done in time for Salt Lake to host the Galactic Games in 2079.
     
     
  #6196  
Old Posted May 3, 2016, 3:40 AM
Comrade's Avatar
Comrade Comrade is offline
 
Join Date: Jan 2002
Posts: 9,643
Quote:
Originally Posted by Marvland View Post
I know I'm not supposed to feed the troll but, I'll bite. Our economy is ABSOLUTELY SMOKING both San Diego and Honolulu's economies by every metric.
Well except the metric that would be most important to many of us on this thread - and that's commercial development.

For being at the heart of such a surging economy, SLC sure isn't seeing it trickle down toward bigger development. At least, not at the rate of many other cities - San Diego included.
     
     
  #6197  
Old Posted May 3, 2016, 4:14 AM
Liberty Wellsian Liberty Wellsian is offline
 
Join Date: Oct 2015
Posts: 810
Quote:
Originally Posted by Future Mayor View Post
It's the City Council, not the County Council, that has to approve the design for an increase in height.
Right, but(iirc) it's the county council that picks the project. It would be crazy disappointing to find out that they left a 600 ft tower on the drawing board in favor of a stubby stucco wall.
     
     
  #6198  
Old Posted May 3, 2016, 3:36 PM
Future Mayor's Avatar
Future Mayor Future Mayor is offline
 
Join Date: Jun 2007
Posts: 4,803
Quote:
Originally Posted by Liberty Wellsian View Post
Right, but(iirc) it's the county council that picks the project. It would be crazy disappointing to find out that they left a 600 ft tower on the drawing board in favor of a stubby stucco wall.
You're right it is the county that is going to pick the project, but even at a stubby wall design it's going to be difficult to get 1,000 - 1,200 rooms into a stubby design below 375'.

The Marriott across the street has 510 rooms, and is 215' tall. The CCH will have more convention space, adding more floors to the base of the hotel than what the Marriott has. The Marriott has a longer footprint along 100 S than the available frontage on W. Temple. So even if the Marriott was modified into an L shape, for it to get to even 1,000 rooms it would need to nearly double in height, requiring the review by City Council in order to exceed the height.

Last edited by Future Mayor; May 3, 2016 at 3:53 PM.
     
     
  #6199  
Old Posted May 3, 2016, 5:35 PM
Utah_Dave Utah_Dave is offline
 
Join Date: Feb 2016
Posts: 699
Timetable

I know it's easier said then done but I hope for the sake of keeping the outdoor retailer and landing some additional conventions that someone puts a move on this CCH process. Is it really that difficult to find a hotelier for this project? It seems like that should have been in the works already but then again the process is all foreign to me. Can someone in the know list some of the steps that are still needed before we start to get some news on the actual building. Reality is starting to set in

Thanks
     
     
  #6200  
Old Posted May 3, 2016, 7:22 PM
Liberty Wellsian Liberty Wellsian is offline
 
Join Date: Oct 2015
Posts: 810
Quote:
Originally Posted by Future Mayor View Post
You're right it is the county that is going to pick the project, but even at a stubby wall design it's going to be difficult to get 1,000 - 1,200 rooms into a stubby design below 375'.

The Marriott across the street has 510 rooms, and is 215' tall. The CCH will have more convention space, adding more floors to the base of the hotel than what the Marriott has. The Marriott has a longer footprint along 100 S than the available frontage on W. Temple. So even if the Marriott was modified into an L shape, for it to get to even 1,000 rooms it would need to nearly double in height, requiring the review by City Council in order to exceed the height.
Correct me if I am wrong but it seems like they could fit the 800 room minimum within the 375' limit and avoid a design review from the city. Maybe they want to go higher than 375', maybe they want to build a fat hotel.

Quote:
Originally Posted by SLC2GeorgetownU View Post








     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 11:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.