This thread is the fourth installment of the "Salt Lake:Official development news thread"
The original and first thread's last page can be accessed at the following link:
http://forum.skyscraperpage.com/showthread.php?t=115696&page=503
the second thread can be accessed at this link:
http://forum.skyscraperpage.com/showthread.php?t=169428&page=501
the third thread can be accessed at this link:
http://forum.skyscraperpage.com/showthread.php?t=199234&page=501
The Unofficial Salt Lake City Project Rundown List
Disclaimer: Information contained in this Project Rundown List could change at any time, and should not be used for anything other than this forums discussions, and its informational purposes.
http://www.downtownrising.com/
PROPOSED
Convention Center Hotel
Proposed
more info to follow if these guys can EVER get their act together..
The Regent Street Hotel
Proposed
Added: 06/14/2015
Location: Eat-A-Burger site
Other: 14 levels Boutique Hotel, 6 levels condos. 190 hotel rooms and 36 Residential Units with restaurant and lobby 20 story tall with a pavilion for a roof deck. 330 FT. 20-stories total. 8th tallest building when/if finish.
151 Tower
http://www.dixonslc.com/?section=office
Proposed
Updated: 04/30/2014
Floors:18
Other: Tower building proposed by Boyer as part of their recent purchase of the former Questar and adjacent properties to the south and then to the west. A parking structure to the east, mid block, is currently under construction.
Location: 151 S State

photo credit: Dixon & Associates
Air Hotels
http://airslc.info/
Proposed
Added: 04/30/2014
Location: NW corner of 400 S and West Temple
Other: This 300+ FT 23-story tower ( based off of the rendering below ) could be Salt Lake's next skyscraper that will include a restaurant and a high end night club., roof top pool/club, 350 person multi-use entertainment space. The lot is cleared and the small two story building on the north end is already built and occupied.
2015 Renderings
Arrow Press Highrise
Proposed
Added: 08/11/2015
Location: Arrow Press Building site
Other: One of the new plans is to tear down and build a high-rise structure on the site of Arrow Press Square, across from the Salt Palace (and site of the old Dead Goat Saloon and Club DV8). The Downtown Alliance released this artist’s rendering of the concept development:
Hardware Station Development
Proposed
Added: 01/10/2016
Location: 155 N 400 W Salt Lake City
Other: Three Buildings, each 5-7 stories
Salt Lake City AC Hotel
Proposed
Added: 08/27/2015
Location: Unknown at this time
Other: 10-stories 127 rooms opening 2017
Utah Theater
Proposed
Added: 11/18/2014
Location: Approx 170 S. Main Street
Wasatch 600 South Apartments
Proposed
Added: 08/11/2015
Location: Approx 616 S. State Street
Granite Furniture Block Redevelopment, Phase II
Proposed
Location: McClelland St (10th E) and Sugarmount Drive
Other: South of the completed Phase I Granite Furniture Redevelopment. Across the street from the current terminus of the S-Line Streetcar
Zellerbach Property
Proposed
Floors: 4-stories
Other: Mix use development in South Salt Lake alone the S-line
Location: 2255 South 300 East
4th & 4th Apartements
Proposed
Floors:5 floors, 122 apartments
Location: NW Corner 400 E 400 S on the former Sizzler site.

Image from
www.beecherwalker.com
City Creek Center - The Cascade
http://www.citycreekliving.com/
Proposed
Floors:19
Other: Residential Condos. The base has been constructed up to level 2. The residential units above will be constructed as economic conditions and demand grow.
Location: approx 51 West 100 S
Social Hall Tower 1
http://www.cowboy.us/citycreekcenter.php
Proposed
Floors: unknown
Other: Residential.On Hold until market demand improves.
Location: NW corner 200 E 100 S
CCC Tower 8
http://www.downtownrising.com/city_creek/
Proposed
Floors: 20ish
Other: Future Planned Tower. Timeline unknown.
Location: NE corner State and 100 S
World Trade Center plaza
http://www.wtcut.com/
Proposed
Floors:Unknown, but RFPs call for a 25-30 floor tower
Address: The location of this rendering shows 200 South and State Street, but no official site has been chosen yet.
Other:Future Planned... looking for 700,000 sq ft of office space. They are looking for a plaza of buildings as well. We could see a smaller 10-15 floor tower on the plaza as well, as seen in the pic. Final renderings have not been released yet.
Wasatch Properties
Proposed
Floors: unknown
Address: 400 South State Street
Other: The developer is in early plans to develop a mixed-use devlopment on the site. In planning phase. Early Preliminary drawings and tentative plans call for a large office tower onsite. Timeline unknown. No updates on this project since the start of the previous thread. There has been no recent news regarding this project.
Hardage Group Redevelopment
http://www.thehardagegroup.com/index.cfm/hotel_development_in_salt_lake_city.htm
Proposed
Location: 400 S 800 E
DA Building
Proposed
Location: NE Corner 500 S and Main
Other: County has purchased the parcel at this location and will most likely be selling the former parcel at 600 S and State SW Corner
Image is from the formerly proposed location, no image for 500 S and Main has been released.
UNDER CONSTRUCTION
Ballpark Lofts
Proposed
Updated 11/14/2012
Floors: 4-5
Units: 30 - 40 residential units
Location: 1380 S West Temple
Other: First floor retail, structured parking garage, rooftop garden with patio overlooking Spring Mobile Ballpark. The project sign is no longer on the site.
Liberty Crest
Proposed
Updated 01/10/2016
Floors: 7 stories
Units: 177
Location: 150 S 200 E
Other:
Alta Gateway
Proposed
Updated 01/10/2016
Floors: 4-stories
Units: 277
Location:
Other:
Need to find renderings for
341
Proposed
Other: Developed by Garbett Homes, looks to be Garbett's first city core project.
http://www.garbetthomes.com/
Other: Previous proposals on this site, Metro Park West, and Townhomes.
Floors:5-6 floors
Location: 341 S 400 W (between 400 W and Rio Grande St
Eco Lofts
http://method-studio.com/work/housing/eco-lofts/
Proposed
Added: 05/19/2014
Location: Approx 440 S 900 E
Other: 6 story building with residential on the top 5, possible retail on the ground floor.

Image from method studios.
Hope Lodge
Under Construction
Address: NW Corner 100 S 400 E
Other: Project by the American Cancer Society. A facility designed for those that come to Salt Lake City from around the state and neighboring states for cancer treatment.
Seasons at Library Square
Under Construction
Other: Same developers as Seasons at City Creek.
Other: Developers have been into the planning office to discuss the project.
Floors:5 floors
Location: SE corner of 500 S and 300 E

photo credit: Tuttle & Associates
111 Tower
Under Construction
Updated: 04/30/14
http://111southmain.com/
Floors:23 387'
Other: The Tower being built by City Creek Reserve in conjunction with the Performing Arts Center. Steel has started to rise on the property.
Location: 111 S Main
Performing Arts Center
http://utahperformingartscenter.org/
Under Construction
Floors: 3-5
Other: Steel has started to rise on the property.
Location: SE Corner of Main and 100 S
State Street Plaza
Under Construction
Floors:10 & 7
Location: Approx 251 South State, east side
Other: 180 Units
SugarHouse block Development
Under Construction
Address: 2100 South & McClelland Street
Other: Mixed use development in sugarhouse. Will include up to 6 stories of offices and 7 stories of condominiums and & retail.
ESA Hotels
Under Construction
Address: 100 S between 300 and 400 W directly across the street from Energy Solutions Arena
Other: Two six story hotels, with retail on the first floor, and a parking garage. One Hotel will be a Hyatt House, 137 rooms. The other will be a Courtyard by Marriott, 175 rooms. Hyatt House on the corner of 100 S and 300 W will be the first of the two hotels built.

Images from
www.beecherwalker.com
Newhouse Apartments
Under Construction
Location:540 East 500 S
Other Underground Parking is currently under construction
COMPLETED
Broadway Park Lofts
http://www.broadwayparklofts.com/pages/index.php
Under Construction
Floors: three 7-8 story buildings
Other: Completed units in the rear building were auctioned in February 2012 to raise capital, now under new ownership. New ownership applied for a $4.5 million loan for the RDA on 11/13/2012 to pay off purchase financing and use to complete construction of remaining units. 11/14/2012
600 West Apartments
Under Construction
Location: Approximately 50 N 600 W, east side of the street
Other:Proposed as mixed use, residential and retail. The mural in the rendering is just an example, that will not be the mural on the building.
Capital Theater- Ballet West academy
Under Construction
Floors: 4
Location: Adjacent to Capital Theater, west side
Other: Funding has been approved, ground breaking should occur in 2012
Cowboy Partners SugarHouse Development
Under Construction
Address: Aprox 2150 South McClelland Street
Other: 171 Units with underground parking
Denver Street Apartments
Under Construction
Floors:5 floors
Location: 448 E 400 S
Encore Apartments
Under Construction
Address: NW Corner 400 S between 500 E and Denver Street.
Other: 189 Units
101 Building
Completed
Address: 101 S 200 E
Other 9 floors, plus roof top mechanical and the front tower would be taller.
US Federal Courthouse
http://www.tphifer.com/
Completed
Updated: 04/30/2014
Floors:10
Location: NE corner 400 S W. Temple
Granite Furniture Block Redevelopment
Completed Phase 1
Location: 10th East 2100 S
Liberty Gateway
Completed
Floors: 5 stories
Location: Approx 500 W and 50 S
Other: 160 Residential units. Project is back on track, should break ground soon.
CityScape Apartements
Completed
Address: 150 S 400 E
Other: 122 units, amenities will include a rooftop courtyard and spa, business conference center, dog park, outdoor fireplace and barbecue areas.
Public Safety Building
Completed
Floors: 4
Location: NE corner 500 S 300 E
21 & View
http://21andview.com/
Completed
Location: 2100 S and View Street, about 1350 East
Other: 29 Units with two signature office/retail spaces.
Lotus Apartments (Formerly the Madeline apartments)
Completed
Location: 338 East South Temple
Other: 84 Units
Eastside Apartments
http://pegdevelopment.com/commercial-developer/30-eastside-apartments
Completed
Floors: 3-6 stories
Location:
The Sugarhouse Aparments
http://sugarhouseapartments.com/
Completed
Location: 2057 South 1200 E
Other: 70 units; Studio, 1 bedroom, 1 bedroom + Den and 2 bedroom units. Fitness Center, rooftop garden and lounge area with gas grill. Looks to be a nice project. These are being developed by the same company that did Urbana.
Merrimac Townhomes
Completed
Location: 38 West Merrimac (just south of Spring Mobile Ballpark)
Other: Five town homes on .343 acres.
644 City Station
Completed
Location: Approx 644 West North Temple
Other: 132 units
http://644.punchlinedev.com/
Gateway Office building
Completed
Floors:5
Location: North end of Gateway, approx 450 W 50 N
Broadway Place Apartments (Senior Apartments)
http://pegdevelopment.com/commercial-developer/31-broadway-place-apartments
COMPLETED
Floors: 4 Stories
Location: Approx 550 E 300 S
Rendon Terrace Apartments (Senior Housing)
COMPLETED
Location: Approx 150 North 600 West
Biomat Building
COMPLETED
Location: Approx 620 West North Temple
Other projects in the works for Downtown SLC include:
-Large 1,000+ room convention center hotel.
-Over 4,000 residential units planned/under construction in Downtown Area.
-There have been discussions off and on of various towers and mixed use buildings on Block 70.
I believe everything on here is up to date. I removed things in which I couldn't find any information on line about and if they projects still have a web presence I left them.
Last updated 01/10/16 New projects will be added as they appear on the site.