please please please... let this mean they are ditching all the billion dollar bus-on-rails LRT plans
would love to see the core circulator project happen, something like this: (99 st OR connors, not both)
upsides:
- unifies Edmonton's most urban communities
- vintage streetcars could be used along with new stock
- include a multiuse path with the streetcar bridge over Jasper/110 St
- salvages parts of the valley line, so engineering and util moves to date are not all lost..
downsides:
- loss of highlevel vehicle lanes southbound forces a doubling of walterdale bridge as prerequisite
- using 99 St route means a proper commuter LRT to the SE has to happen first, and likely also a trenched road from the walterdale bridge, under whyte, linking to gateway south of 76 av
- with the recent trackrecord of project timelines... I`ll be long dead before anything like this ever happens