Quote:
Originally Posted by R5Ryder
When do they start pouring the remaining part of the core? Looks like the steel is all caught up, and at the rate they're going, the glass will be soon.
|
They are currently erecting steel trusses at the transfer floor, this is where the building transfers from a steel structure to a concrete structure. After this floor is completely erected the rest of the structure will be poured.