View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Mar 27, 2015, 9:03 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
Good to realize that the public is becoming aware that a TBM isn't the be-all end-all in tunnel construction.

Quote:
Originally Posted by Gordon View Post
If the Broadway subway was to be done Cut and Cover , could the trench be done in sections so as to not have all of Broadway closed for the duration of construction?
It would likely be under 10th Ave. which is not as sensitive to road closures.
They just need to make sure the route is determined based on sound engineering practice, not some politician saying the "Broadway Line" must be under Broadway.


Quote:
Originally Posted by queetz@home View Post
I guess ultimately, this could be the reason why cut and cover was chosen (likely behind the scenes with collaboration with Falcon) for the Canada Line...they needed it built ASAP and you have more control over that method. As we now learn with Evergreen Line, tunneling has a lot of uncertainty, and the Canada Line could have been delayed for the Owelympics...
That's one of the reasons.

The other was that because of Little Mountain (QE Park) being a big granite volcanic cone, they would have needed a different type of TBM (not just cutter heads) for that segment - adding cost.

The need to build it ASAP after delays from environmental challenges and funding refusals at Metro Vancouver led to the switch from sequential precast segments being used to cast-in-place concrete. The cast-in-place method allowed them to work at multiple fronts. The sequential precast method would have been comparable to a TBM (or elevated gantry crane) - working from one end adding sequentially from one front.

Last edited by officedweller; Mar 27, 2015 at 9:16 PM.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:39 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.