View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 28, 2015, 7:18 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
Quote:
Originally Posted by queetz@home View Post
If the sole benefit of a TBM is not to disrupt the 850 meter section between the disruptive station construction, then there is simply no justification for it. Disruption will happen because of those stations, and the distance between them is so negligible spending an additional billion or so for the TBM is simply not worth it. Might as well go Cut and Cover all the way since its going to be painful to businesses either way.

Evergreen Line had to use TBM because they had too. I cannot imagine digging a 2 km trench that deep on the mountain side would be economical, so TBM makes sense from a technical and economic point of view.
I've always thought that real forward thinking would plan for a transit system in which the tracks dip down after leaving each station and then rise back up again as they reach the next station. That way you get gravity assist during the acceleration and braking phases and reduce the amount of energy and vehicle wear required to run the system. Depending on how deep you want to go with the "valleys" between stations a TBM might be the logical choice to avoid excessively deep cut and cover construction. In fact it seems that if you were forced to use a TBM for other reasons then it would pretty much eliminate the cost difference between a gravity-assisted track profile and conventional "flat" construction.

But that sure has heck isn't going to happen with the Broadway line in Vancouver, despite its adoption in a number of other places.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:48 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.