I was off yesterday and, lucky for me, I got an email at work (as it is the address that Lamb Dev has to contact me) telling me that my occupancy date has moved from March 13 to March 27th!!! I have a running joke at work that every late Friday - or Monday morning - I get an email from Debbie and signed by Brad Lamb to announce a new delay. So far, I went from Feb 21st to Feb 24th to March 5th to March 13th to March 27th! And, knowing that JC was to move originally on January 30th and myself on February 21st, this is a 3 week spread to move people from floors 3 to 17. Now, it is likely that the first people are moving on March 24th and the upper floors on March 27th, so just one week to move about 230 units!!! This is not possible to move the whole building (minus the 1st and 2nd floor and the 17th floor) in one week!
I was hoping to move before Easter...not likely to happen. Since there were so many unknowns about buying on paper (no matter how often I read the purchase offer or question my lawyer, or ask around Lamb Dev) and I wasn't able to find the answers to plan this purchase properly and get all Ts crossed, I decided last fall to carry both my current home and my new Gotham loft for a few months, no matter the cost - I simply didn't want to have to deal with the possibilities of selling my place then having to move twice or put my stuff in storage, etc. From what both JC and Karma22 have been thru with these delays, it has been proven to be a wise decision.
This week-end, as some of you may have done so, I took advantage of the SoBa suite closing and bought a few items for my new loft at Gotham! While being there, I met Ryan and he told me that he had a chance to view the building and, once Gotham gets occupancy permits from the city of Ottawa, the building will be fabulous! He mentioned to me that they waited a few weeks for the Ontario TSSA to come and inspect the elevator amongst many other things. Also, with the very cold month of February, it really slowed things down. As an example, they were not able to operate the construction crane quite a few days in February when temperature dropped below -18C. The issue with the plumbing sub-contractor going bankrupt was both a major headache and delay.
Anyway, my assurance broker told me today that it is routine for condo occupancy to have delays after delays in big Toronto (up to 6 months or more): the issue is not unique with Brad Lamb. He is as anxious as us to have the building completed as he doesn't get paid until the building is completed and registered.
BTW, I am not sure if you are aware of this: we need to have Tenant Insurance from Interim Occupancy to Firm Closing, as my insurance broker told me today: the building and the unit that we have bought are not yet registered. Once the title is transferred to our name, we may get proper Condo Owner insurance.
I haven't had my PDI yet: will it ever happen? I ordered quite a few upgrades and I like to know how they turn out - if ever they were done! Are most of you have gone for your PDI yet? Like JC, I like to find out if I have done the right choices: I have mostly a white/grey/black color palette.
JC: For your kitchen cabinets, I doubt that you will get a refund for the 42" upper cabinets - I would have ordered them if I knew about this option. Like you, my plan shows an island without upper cabinets. Who knows, I may have upper cabinets above the island! Should you want to have the upper cabinets shorten (and most people seems to agree here), I would hire a kitchen cabinet maker to take them down, modify them and reinstalled them. You have been really unlucky with your unit: a very early occupancy with amongst the longest delay, the tile issue with the bathtub skirt and these upper kitchen cabinets! The list may grow as you get your 30-day Tarion list. As for painting your place, I would wait at least 6 months (even better a year) before doing so. Should you file with Tarion to correct defects, the builder obligations are to restore to the original finishes.
Also, from someone close to the building contractor, I learn that most units from the 3rd floor to the 16th floor are ready less a day or two of touch-ups and cleaning. The 1st, 2nd and 17th floors have the drywall installed and moving along to completion.