Quote:
Originally Posted by hollywoodnorth
|
Here's how San Francisco extracted their TBMs:
http://gizmodo.com/removing-a-tunneling-machine-from-the-ground-is-strange-1687180812
The NYTimes article is mixing up parts of the TBM used for digging the new East Side Access for the LIRR commuter trains to get to Grand Central. If you watch the gizmodo video, the first piece of the TBM to be removed is the rotating cutter head, followed by the 'circus train' of the TBM.
What the NYTimes article is doing is confusing the TBM cutter head with the rest of the TBM, leading to confusion about what was left behind under Park Ave south of Grand Central. Other sources are saying the TBM cutter head was detached from the rest of the TBM 'circus train', and the 'circus train' was partially backed away from the TBM cutter head. With room to work between the TBM cutter head and the 'circus train', the cutter head was encased in concrete to provide a solid end-cap to the tunnel. The rest of the TBM - the 'circus train' - was reversed back through the completed tunnel back to the launch-box pit where it was dismantled and extracted.
In Vancouver, the Canada Line construction was also done by a TBM, but in this case the 'launch box' was at 4th Ave @ Cambie, and the 'retrieval box' was at Granville @ Hastings. The single TBM built a tunnel under False Creek and Downtown from south to north, and at the Hastings pit the cutterhead was detached so the TBM could simply reverse backwards to the Cambie pit. While the TBM was being backed-up through the tunnel, the TBM cutter head was broken into parts and trucked back to the 4th Ave pit.
Once back in the launch box again, the TBM was repaired, the cutter head repaired, re-assembled and re-attached, and the TBM was shifted over to dig the second tunnel under False Creek and Downtown. When the second tunnel was completed, the TBM cutterhead was again removed and dismantled and trucked to the 4th Ave construction site while the rest of the TBM reversed back to the launch box where it was dismantled and extracted to be reused on a future project.
The launch box became the Canada Line Olympic Station and the retrieval box became the Waterfront Station between Pender and Cordova
geeky trivia:
Olympic Station has round tunnels on the north side and square tunnels on the south.