View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #6481  
Old Posted Feb 24, 2015, 10:30 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by Gordon View Post
Is the Broadway Millennium Line extension goring to be bored?
I believe that's the plan, yes. Though we won't know for sure until we see what proposal wins.
     
     
  #6482  
Old Posted Feb 25, 2015, 12:28 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Gordon View Post
Is the Broadway Millennium Line extension goring to be bored?
from the RFP Q14-154 "Broadway SkyTrain Extension - Phase 3A Technical Services"

"Through this Request for Proposal (RFP), TransLink is seeking to retain the services of a planning and engineering consultant team to lead Phase 3A - Reference Case Development for an extension of the Millennium Line (SkyTrain) from its current terminus at VCC-Clark via a tunneled alignment along the Broadway corridor to Arbutus Street (“Broadway SkyTrain Extension”)."


It seems it has been decided that it will be tunneled, and with CoV absolutely against Cut n Cover after the Cambie subway construction fiasco, the only real alternative is TBM - similar to what Canada Line used to get under False Creek and through downtown using twin bores, and what Evergreen is using today using a single bore.


I would have thought this RFP award would have happened by now.
     
     
  #6483  
Old Posted Feb 25, 2015, 2:58 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Quote:
Originally Posted by Gordon View Post
Is the Broadway Millennium Line extension goring to be bored?
It will be bored AT LEAST as far as pacific spirit park, after that we don't know.
However, the first phase will probably go to Arbutus anyway, and be bored (except a shot elevated / at grade section connecting it to VCC Clark's tail track.)
     
     
  #6484  
Old Posted Feb 25, 2015, 3:57 AM
gkz gkz is offline
Registered User
 
Join Date: Jul 2013
Posts: 71
From: http://former.vancouver.ca/ctyclerk/cclerk/20140204/documents/p1.pdf

Quote:
Broadway Subway

It is anticipated that the Campus Lands will be the primary staging area for the tunnel boring machine and associated operations for the construction of the Broadway Subway (Figure 7). In 2011, as part of the evaluation of a new SkyTrain alignment, TransLink identified a staging area required for construction. During the Structure Planning process, City staff along with GNWC Trust worked with TransLink and their consultants to refine the 2011 staging area with site planning and grading options that minimize impacts to both Broadway Subway construction and the development aspirations of the GNWC Trust.

The analysis presented a modified staging area (see Figure 7) and identified impacts to phase one, pre-SkyTrain development sites. The City and the GNWC Trust are currently working together to find a balanced solution which mitigates the impacts of the proposed staging area on GNWC Trust’s development program but provides certainty for the successful construction of the Broadway Subway which will extend the Millennium Line westward.
     
     
  #6485  
Old Posted Feb 25, 2015, 7:39 PM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
I assume that the project would have the TBM go slightly beyond the requirement for an Arbutus temporary terminus and be parked; thus allowing for the machine to one day in the future be fired up again to continue to where the line would become elevated.

Are the proposing a single or twin tunnel?
     
     
  #6486  
Old Posted Feb 25, 2015, 8:34 PM
Axe Axe is offline
Registered User
 
Join Date: Oct 2009
Posts: 78
Quote:
Originally Posted by SOSS View Post
I assume that the project would have the TBM go slightly beyond the requirement for an Arbutus temporary terminus and be parked; thus allowing for the machine to one day in the future be fired up again to continue to where the line would become elevated.

Are the proposing a single or twin tunnel?
lol no it would be removed
     
     
  #6487  
Old Posted Feb 25, 2015, 10:13 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by SOSS View Post
I assume that the project would have the TBM go slightly beyond the requirement for an Arbutus temporary terminus and be parked; thus allowing for the machine to one day in the future be fired up again to continue to where the line would become elevated.

Are the proposing a single or twin tunnel?
If it is phased to UBC, i doubt they'd leave a TMB sitting in a tunnel for years, even a decade, before the second phase of the line is approved.
     
     
  #6488  
Old Posted Feb 26, 2015, 3:13 AM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
Quote:
Originally Posted by Jebby View Post
If it is phased to UBC, i doubt they'd leave a TMB sitting in a tunnel for years, even a decade, before the second phase of the line is approved.
Is it not considerably cheaper (often) to leave te TBM burried than it is to pull it out? Did they not do that with Canada Line downtown? I know it's been done with many other projects TBM projects I simply hope that if the cost it high to remove it that contractors consider planning for use in future expansions (if feasible). This is something that the province would have to mandate as part of the project.
     
     
  #6489  
Old Posted Feb 26, 2015, 3:18 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Pretty sure without constant maintenance it would turn into a big rusty mess in 10 years.
     
     
  #6490  
Old Posted Feb 26, 2015, 4:45 AM
Landmate's Avatar
Landmate Landmate is offline
Registered Mecha User
 
Join Date: Mar 2011
Location: Victoria, BC
Posts: 7
Quote:
Originally Posted by SOSS View Post
Is it not considerably cheaper (often) to leave te TBM burried than it is to pull it out? Did they not do that with Canada Line downtown? I know it's been done with many other projects TBM projects I simply hope that if the cost it high to remove it that contractors consider planning for use in future expansions (if feasible). This is something that the province would have to mandate as part of the project.
I'm pretty sure the Canada Line TBM was removed from the bore hole when it was completed. As far as I remember it was disassembled and stored at the ProTrans BC yards in Richmond while it awaited a new project in Europe. Weirdly enough I can't find any evidence of this on the web though...

Apparently the Daily Planet ran a television segment on Sweet Leilani in 2008, and speculated the boring machine had another fifteen kilometers worth of capacity left, according to a post from SSP.

There was, of course, an April Fools rumor that the TTC had bought it as well.
     
     
  #6491  
Old Posted Feb 26, 2015, 5:20 AM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
Quote:
Originally Posted by Landmate View Post
I'm pretty sure the Canada Line TBM was removed from the bore hole when it was completed. As far as I remember it was disassembled and stored at the ProTrans BC yards in Richmond while it awaited a new project in Europe. Weirdly enough I can't find any evidence of this on the web though...

Apparently the Daily Planet ran a television segment on Sweet Leilani in 2008, and speculated the boring machine had another fifteen kilometers worth of capacity left, according to a post from SSP.

There was, of course, an April Fools rumor that the TTC had bought it as well.
Yes. I stand corrected. My speculation re: Canada Line TBM was inaccurate. After one tunnel was bored, the machine was disassembled at Waterfront and reassembled at the Olypic Village start location to bore the second tunnel. Couldn't find the TBMs name nor where it ended up afterwards.

Thoughts on single vs twined tunnel for this project?

Last edited by SOSS; Feb 26, 2015 at 5:21 AM. Reason: Spelling
     
     
  #6492  
Old Posted Feb 26, 2015, 5:37 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,157
I'd like to know what the cost savings would be for cut and cover along Broadway before we completely dismiss it. Or is cut and cover not technically possible due to a 10th ave route? Cut and cover along the Canada Line saved 500 million, so if it's in that range for Broadway, why not consider it?
     
     
  #6493  
Old Posted Feb 26, 2015, 5:54 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,391
Quote:
Originally Posted by SOSS View Post
Is it not considerably cheaper (often) to leave te TBM burried than it is to pull it out? Did they not do that with Canada Line downtown? I know it's been done with many other projects TBM projects I simply hope that if the cost it high to remove it that contractors consider planning for use in future expansions (if feasible). This is something that the province would have to mandate as part of the project.
that used to be common (leaving them in a stub tunnel to rust) not anymore.

that said NYC recently did that >> http://www.nytimes.com/2011/07/25/nyregion/deep-below-park-avenue-a-200-ton-drill-at-rest.html

where as in Toronto they sell the machines after use >> http://news.nationalpost.com/2014/05/07/...und-after-eglinton-lrt-line-is-finished/
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
  #6494  
Old Posted Feb 26, 2015, 6:27 AM
Vancity's Avatar
Vancity Vancity is offline
Registered User
 
Join Date: Jan 2009
Location: Richmond, BC
Posts: 1,637
Quote:
Originally Posted by logan5 View Post
I'd like to know what the cost savings would be for cut and cover along Broadway before we completely dismiss it. Or is cut and cover not technically possible due to a 10th ave route? Cut and cover along the Canada Line saved 500 million, so if it's in that range for Broadway, why not consider it?
cause it's too much a pain for residents/businesses in the area.
     
     
  #6495  
Old Posted Feb 26, 2015, 5:01 PM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
Likely the economic impact of cut and cover would be higher that the cost differential of c and c vs bored. Taking out the main east-west corridor would be horrible. Also, along Cambie businesses are more limited in numbers and locations compared to Broadway.
     
     
  #6496  
Old Posted Feb 26, 2015, 5:18 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,601
Cambie was much wider and allowed for somewhat normal usage on one half while the other half was dug up. Broadway is smaller and already much busier.

They would basically have to close the road to cars.
     
     
  #6497  
Old Posted Feb 26, 2015, 6:26 PM
sacrifice333 sacrifice333 is offline
Vancouver User
 
Join Date: Jun 2008
Location: Vancouver
Posts: 1,460
I don't know if there's space, ROW, etc., but a C&C could be done on 10th still allowing for all stations to be on Broadway (South Side of Street). Would just mean that all stations were sort of built on a 45 degree angle from street-level on Broadway to Subway level below 10th.

/armchair qb
__________________
Check out TripStyler.com {locally focused travel blog} | My instagram {Travel Photos}
     
     
  #6498  
Old Posted Feb 26, 2015, 6:52 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,712
Quote:
Originally Posted by sacrifice333 View Post
I don't know if there's space, ROW, etc., but a C&C could be done on 10th still allowing for all stations to be on Broadway (South Side of Street). Would just mean that all stations were sort of built on a 45 degree angle from street-level on Broadway to Subway level below 10th.

/armchair qb
VGH is on 10th, so unless you're willing to tear down part of Canada's second-largest hospital, cut-and-cover down 10th isn't going to work.
     
     
  #6499  
Old Posted Feb 26, 2015, 6:58 PM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
Cut and cover along 10th would also have all the trees removed along that corridor. Can anyone say NIMBY?
     
     
  #6500  
Old Posted Feb 26, 2015, 9:04 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,586
Cut and cover along 10th would work easily if the tunnel is stacked.

The excavation down Cambie St. in the village area was quite narrow and could easily fit down 10th Ave.
Access to VGH Emergency could be maintained by excavating piecemeal and decking over the excavation.

A bored tunnel whether under Broadway or 10th will likely mean deeper stations, longer access times and multiple escalators switching back (like Yaletown-Roundhouse), which also means more repair and maintenance costs.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:06 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.