Quote:
Originally Posted by Harrison
Aren't the townhouses under construction already though? The presentation must be only for the tower portions then. Hopefully the design is an improvement then previously, the amount of stucco compared to glazing was quite sad...
|
The 1st 4 story 153 unit building is about 75% comlete. The 2nd low rise it a mirror version of the 1st, the pakade is done and above grade work is just starting.
The high rises got their excavation permit, and right now they look to be 1 to 2 levels down for both the tower sites.
The towers will likely be two more BK specials but I am okay with that. This area can use some denisty to drive ammenities and interest in the several other redevelopment sites and this project, at 750 units total, should help immensely.
I think it'll prove to be a popular project due to it's central location, easy LRT access and killer views.