Posted Feb 25, 2013, 7:38 PM
|
 |
HVAC guru
|
|
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
|
|
Some EDC minutes of note:
C.2. Oliver Residential Podium/Tower
Manasc Isaac - Myron Nebozuk
Presentation made.
I can't imagine a drawing is available, but can you at least tell us roughly whereabouts this is Cold ?
C.3. J22 Parking Structure
Dialog - Alexis Finlay
10126, 10130,10132, 10136, 10140,10142 – 122 Street NW
Sites legally described as:
Lots 7-10, Block 1, Plan 4044AC
Presentation made.
I still think it's such a shame that those beautiful old houses (as run down as they are.. there is still life there) are getting knocked down for a parkade, with fake houses tacked to the front. Good lord.
B.3. Mckoy Building
Gardner Architecture – Ben Gardner
11211, 11229, 11235 – 105 Avenue NW
Site legally described as:
Lots 168 – 172, Block 12, Plan 5665CL
P. Odinga read the comments of the Development Planner.
MOVED: C. Domanski
Motion to support
Anyone know what this is ?
B.5. Mayfair North
Architecture ATB - Rick Arndt
10037, 10039, 10045 and 10051 - 109 Street NW; 10815 and 10845 Jasper Avenue NW
Site legally described as:
Lots 38 - 46, Block 8, Plan NB
P. Odinga read the comments of the Development Planner.
MOVED: K. Kerr
Motion of support with conditions. Administrative walk-on required.
• The Committee requires that the applicant meet the required tower stepback on 109 Street.
• The Committee requires the applicant to raise the podium of the main building back to the original development permit height application of 7.9 meters (matching Mayfair South).
• The Committee recommends the applicant include soft landscaping within the new mews diagonal pederstrian at-grade connection.
• The Committee strongly recommends that the applicant works with an artist to design the “lantern elements” that are located within the mews.
SECONDED: T. Muller
|