Originally Posted by headhorse
|
Nice find
Quote:
Originally Posted by lilwayne
so im assuming bldg will be 70 to 80 meters
and herritedge will be a lil taller
|
That depends on a bunch of factors, most notably the design. It could end up taller if by design there are less units per floor, (and how many units there are) compared with the average 24 storey tower. I think Biff made mention how it's going to be a tall and skinny one. But expecting it to be 70-80m is probably a safe assumption.
Quote:
Originally Posted by Mininari

This is good to hear, but does this mean we'll have two delay-plagued riverfront towers?
But yeah, the red tape at city hall really needs to go along with completely gutting city hall and starting over with a modern-thinking, motivated, and younger workforce with some background in 21st century city planning and management. They're trying harder these days, there's lots of construction around (including urban infill), but Winnipeg still feels like a place that is humming along at a fraction of it's potential.
|
Keep in mind it's more about momentum, we haven't had two new residential towers rising in Winnipeg for some time in general so that alone is pretty neat (add that with all the other general downtown residential development)
And, keep in mind, with Heritage, we had some discussion that there might be other reasons behind just the city part. It seemed like most of the criticism from the Heritage side was with things held up by Hydro, beyond letters of approval, that tardiness boils down to whoever is managing that aspect of the project from Hydro (in this case)
My point is, the truth to the delays is somewhere in the middle. The city probably has some blame on them, but it can't all be blamed on them. Some could be on the heritage guys (not doing their own homework or preparation in time or whatnot) and some could rest on MB Hydro; it's a combination of things taking physical time like papers needed X days to clear submissions or accounts and permits needing X days to be verified etc.. Plus human laziness, plus other factors (nature for instance) or over commitment ("we will have this project underway by X date!") that leads to the delays
It will start, but delays shouldnt be a surprise
Look at it this way, once it starts, we get to enjoy watching it go up for a longer time too! And in that time there might be other projects underway downtown like some of the MPI lot developments and Convention Centre expansion underway. It will be nice to be able to talk about all that construction while we all chat about how awesome (or bad in other opinions) the human rights museum was, how the new Bombers stadium is great (sans trough) and all the other projects currently underway are completed (if they aren't still U/C)
Delays suck when we anticipate things, but they can be more fun in the long run (not always though...haha that is a huge disclaimer with construction projects...delays can also mean a lot of stress for a lot of people) but I'm talking with the perspective of us SSP'ers
I mean, as long as they do eventually start, that is