Quote:
Originally Posted by 240glt
No one tenders a job a year before construction and no contractor is going to hold their pricing that long
And I think we'd have heard if the hotel / condo was out for bids, and Ellis Don ? Seriously ?
My C2E BS detector is going off
|
no inside info on this project and how it is being handled but construction management is often let in the preconstruction/design phase (as that's where the most potential value can be achieved). the only thing being "fixed" is the fee, not the project pricing.