Quote:
Originally Posted by cl812 View Post
Noticed this afternoon that surveying has begun at the Corbett Centre in front of the Dollar Store (location of the new building on the site plan).
Would be great to see the proposed shops added. Corbett needs more selection
Reply With Quote
     
     
  #2862  
Old Posted Jul 23, 2011, 5:39 PM
cj6286's Avatar
cj6286 cj6286 is offline
Registered User
 
Join Date: Oct 2010
Location: Fredericton
Posts: 289
I found some old pictures that I thought would be worth sharing.




Queen/Carleton intersection with a pedestrian scramble.


Carleton Street Bridge.




Does anyone know where this picture may be??
Reply With Quote
     
     
  #2863  
Old Posted Jul 23, 2011, 9:37 PM
KnoxfordGuy's Avatar
KnoxfordGuy KnoxfordGuy is offline
New Brunswick booster!
 
Join Date: Jan 2011
Location: Fredericton, New Brunswick
Posts: 2,221
You can see the normal school on the left hand side, so id say Queen st. by city hall. Nice picture!
Reply With Quote
     
     
  #2864  
Old Posted Jul 24, 2011, 12:59 AM
Freddypop's Avatar
Freddypop Freddypop is offline
Registered User
 
Join Date: Mar 2008
Location: Go Pats!
Posts: 2,332
Yep...Fountain in front of City Hall and the Justice building can be seen. Pic focused on intersection of Queen and York
Reply With Quote
     
     
  #2865  
Old Posted Jul 24, 2011, 1:17 AM
cj6286's Avatar
cj6286 cj6286 is offline
Registered User
 
Join Date: Oct 2010
Location: Fredericton
Posts: 289
Ahh, I see the fountain now!
Reply With Quote
     
     
  #2866  
Old Posted Jul 24, 2011, 3:52 PM
Freddypop's Avatar
Freddypop Freddypop is offline
Registered User
 
Join Date: Mar 2008
Location: Go Pats!
Posts: 2,332
TRA building is completly demolished now. Debris cleanup however is still ongoing
Reply With Quote
     
     
  #2867  
Old Posted Jul 24, 2011, 11:32 PM
cj6286's Avatar
cj6286 cj6286 is offline
Registered User
 
Join Date: Oct 2010
Location: Fredericton
Posts: 289
Update on the new bike lanes -> http://cyclingfredericton.blogspot.com/2011/07/cyclists-dream.html
It's fantastic to finally see the Trailway Master Plan come to life!
Reply With Quote
     
     
  #2868  
Old Posted Jul 25, 2011, 1:15 PM
Steeple Shanks Steeple Shanks is offline
Registered User
 
Join Date: Jun 2010
Posts: 89
Quote:
Originally Posted by Steeple Shanks View Post
Noticed that the Irving crane is again in front of the train station. Last time it was there it was to erect the crane for the apartments on Victoria street. Perhaps they are about to dismantle the crane?
The crane of at the Victoria street apartments is down. I guess it is all up to the stitching crews now.
Reply With Quote
     
     
  #2869  
Old Posted Jul 25, 2011, 7:38 PM
cl812's Avatar
cl812 cl812 is offline
Registered User
 
Join Date: Sep 2007
Location: Fredericton, NB
Posts: 1,513
Quote:
Originally Posted by Steeple Shanks View Post
The crane of at the Victoria street apartments is down. I guess it is all up to the stitching crews now.
Im guessing they will be erecting another crane over at the new FH Tower site soon. When I was by there last week, it looked like much of the site prep work was nearly finished.

On another note, has there been any news regarding the Hilton downtown or when it is supposed to start?
Reply With Quote
     
     
  #2870  
Old Posted Jul 25, 2011, 8:47 PM
Freddypop's Avatar
Freddypop Freddypop is offline
Registered User
 
Join Date: Mar 2008
Location: Go Pats!
Posts: 2,332
Quote:
Originally Posted by cl812 View Post
Im guessing they will be erecting another crane over at the new FH Tower site soon. When I was by there last week, it looked like much of the site prep work was nearly finished.

On another note, has there been any news regarding the Hilton downtown or when it is supposed to start?
Re the Hilton....chatted with "a high ranking city official" who informed me that construction would begin sometime in the next 12 months.

Last edited by Freddypop; Jul 25, 2011 at 9:32 PM.
Reply With Quote
     
     
  #2871  
Old Posted Jul 27, 2011, 11:51 AM
cl812's Avatar
cl812 cl812 is offline
Registered User
 
Join Date: Sep 2007
Location: Fredericton, NB
Posts: 1,513
City awards contract to build water reservoir on north side
Published Wednesday July 27th, 2011
A3
By HEATHER MCLAUGHLIN
[email protected]

City council has awarded a $1-million contract to Greatario Industrial Storage Systems Ltd. for the construction of the Northbrook water reservoir tower off Brookside Drive.

The company was the sole bidder on the project. The company's price was close to the city's estimate for the work. The engineer's estimate was $1,022,000, including HST. The company's bid was $1,028,300.

Monteith Underground Services Ltd. will install infrastructure to the water reservoir at a cost of $211,485.

"This is great that this is starting to come through," said Coun. Bruce Grandy.

City engineer Murray Jamer said with the continued growth in development on Brookside Drive, the city needs to build a water reservoir tower both for a reliable drinking water supply and for fire-fighting protection.

"Basically, Brookside Drive is at one elevation and the water for the Brookside Drive developments comes from that tank at Killarney Lake, but as you go out away from Brookside Drive, the elevation gets higher and there's not enough pressure to reach these new developments," Jamer said.

"As the developments have started over the last several years, we started a new pressure zone with a pressure pump, but now because there's getting to be more and more development at that pressure zone, we should have a reservoir there."

The tower will improve flows in the vicinity, he said.

"If a pump goes down, we'll still have the reservoir where it runs by gravity and so then it also provides more reliability as we get more homes here. Good design says after you get a certain number of homes, then it's time to follow through with a reservoir," Jamer said.

The tower will be constructed in the vicinity of the Heron Springs development project.

Trent Brewer, manager of the city's water and sewer division, said the Northbrook reservoir will be 9.4-metres in diameter and have a nearly 21-metre-high tank with a capacity of holding 1,432 cubic metres, or 1.4 million litres, of water.

Construction of the water main and sanitary sewer piping by Monteith Underground Services Inc. will commence next week.

The foundation work for the reservoir should start in early September, with completion scheduled for mid-November.

The last time the city built a reservoir was in the early 1990s when a new one just off Regent Street was constructed by a contractor. That reservoir collapsed and had to be rebuilt by the contractor.

http://dailygleaner.canadaeast.com/cityregion/article/1426909
Reply With Quote
     
     
  #2872  
Old Posted Jul 28, 2011, 10:42 AM
Freddypop's Avatar
Freddypop Freddypop is offline
Registered User
 
Join Date: Mar 2008
Location: Go Pats!
Posts: 2,332
Construction down, but city remains optimistic

Published Thursday July 28th, 2011

A4 By HEATHER MCLAUGHLIN

[email protected]

They said it wouldn't last forever and a construction slowdown in the capital city this year is starting to show in the statistics.

City hall has been predicting that its $100-million, year-over-year boom of the past decade would start to level off. It looks like that rebalancing is starting to show, although development committee chairman Coun. Stephen Chase said the second half of the year should pick up.

Between January-June 2010, construction in the city was already nearly $81 million.

This year from January to June, the value of construction in Fredericton is at $36.6 million.

"It is behind last year at this point in the year, but we're optimistic that by year-end, our figures will approximate last year's. They'll be a little lower, but our estimation is that we're looking at somewhere in the $90-million range. Typically in a normal year, there's more construction in the second half of the year anyway," Chase said.

Major government projects have cooled down.

"We don't have the same government stimulus programs that were in place, but we do have the Marysville school, which is a fairly hefty project and that will add to our figures," Chase said. "We're not alarmed."

Most of the downturn is in the commercial, industrial and government sectors where the drop off has been dramatic.

Industrial projects so far this year include one building permit and one renovation permit worth $35,000. There are no new municipal government project permits and no new federal-provincial government projects in the city.

The value of institutional construction for buildings and renovations is worth $2.2 million. For the same period last year, institutional construction rang in at nearly $19 million.

Single-family home construction is tracking along well at nearly $9 million, not too far off track from last year's $10.7 million values from January to June.

Total residential so far this year - which includes everything from mini-homes to townhouse construction to additions such as pools, garages or decks - is worth $23.5 million, compared to $29.8 million for the same time period last year.

"It's down, but that's not surprising as well. Changes to mortgage rates have cooled interest and in our market, when you get uncertainty among government employees, that's bound to temper demand for housing," Chase said of the residential numbers. "We're optimistic."

Alex Forbes, assistant director of development services, said residential and apartment development isn't that far off last year's figures.

"We're down on singles (family homes), but that could pick up. Apartments were very close to where we were and everything is based on last year, but last year was this monumental year," Forbes said. "I think we're doing quite well."

Even the Costco construction permit on Regent Street was issued last year for this year's building season.

"There's lots of things happening and the second half of the year tends to be stronger than the first half," he said.

"Really, the core stuff is the residential. As long as there's confidence in the residential market that means that people are still coming into town and buying houses and moving up in houses. The industrial sector is never a strong sector for us ... With commercial all it takes is one big permit and we're sort of back to usual."

Dave Crandall, senior vice-president at Fredericton-based exp, formerly ADI Ltd., said its 350 engineers and consultants across Atlantic Canada - including 230 in Fredericton - have had to cast their eyes beyond the region to pick up more work.

"Certainly, the construction industry is down this year, but I would say that where it's turned down for us in Atlantic Canada, we're doing work outside of Atlantic Canada to supplement our work here," Crandall said.

"Our staff here in Atlantic Canada has been fairly stable over the last year."

In Fredericton, Crandall said many of the city's big-scale projects are either completed or wrapping up.

"If you think of the last several years, you had the eastend convention centre, you had the Currie building going on, you had the YMCA, the community college on the (UNB) campus. You had a lot of projects going on, so a lot of the big projects that had public money, either federal provincial or municipal, are just getting to the end of the project," Crandall said.

Paul LeBlanc of Prospect Building Contractors said his company is having a steady construction season.

"It's pretty regular for us," LeBlanc said.

"We've got one big job upriver that's been keeping us busy."

LeBlanc said when you factor out the major construction projects that have inflated the city's construction figures for the past few years, what's left is probably a typical building season in greater Fredericton.

http://dailygleaner.canadaeast.com/cityregion/article/1427258
Reply With Quote
     
     
  #2873  
Old Posted Jul 30, 2011, 1:47 PM
Freddypop's Avatar
Freddypop Freddypop is offline
Registered User
 
Join Date: Mar 2008
Location: Go Pats!
Posts: 2,332
Noticed some heavy equipment and some activity at the site of the proposed new elementary school on Cliff Street yesterday
Reply With Quote
     
     
  #2874  
Old Posted Jul 30, 2011, 4:23 PM
OliverD OliverD is online now
Registered User
 
Join Date: Aug 2009
Posts: 3,303
Yeah, it looks like they are starting to build the new road.
Reply With Quote
     
     
  #2875  
Old Posted Aug 4, 2011, 1:05 AM
Steeple Shanks Steeple Shanks is offline
Registered User
 
Join Date: Jun 2010
Posts: 89
Quote:
Originally Posted by Freddypop View Post
Yep....Charlotetown is getting a stand-alone Gap"big box" store that is now under construction. You can view it on the PEI thread. They have had an Old Navy now for years. That city will now have both Gap and Old Navy stores in big box format. Re your comment on Best Buy.....I believe you are correct and that BBB refers to Bed, Bath & Beyond.
Have noticed in the Moncton Transcript that the Mapleton centre is back on track and they have announced that Best Buy and Bed Bath and Beyond are possible anchors for the centre. Has anyone heard anything more about either Best Buy or Bed Bath and Beyond for the Corbett centre?
Reply With Quote
     
     
  #2876  
Old Posted Aug 4, 2011, 12:10 PM
cl812's Avatar
cl812 cl812 is offline
Registered User
 
Join Date: Sep 2007
Location: Fredericton, NB
Posts: 1,513
New Y sure to make a splash
Published Wednesday August 3rd, 2011
Therapeutic | One of the two pools in building first of its kind in region
A1
By STEPHEN LLEWELLYN
[email protected]

The only variable depth, therapeutic swimming pool in Atlantic Canada is getting the last of its bright blue tiles installed this week at the $20-million Fredericton YMCA building.

The pool floor, which will be raised and lowered hydraulically while under the water, will be installed in a few weeks after the tile grout is cured.

The building on Albert Street is expected to open next month.

"It's incredibly versatile," said YMCA CEO Kathy Russell on Tuesday about the new therapeutic pool.

"We've talked to people who have these pools and they're really happy. They'd never go back to having a normal pool.

"We're the first ones in Atlantic Canada."

The pool floor will displace the water as it rises and falls.

"It's a pool that's really intended for multiple populations," said Russell. "The floor will move up and down within a matter of minutes.

"For example, we could have a deep-water aquafit class in for one hour for seniors and then the following hour, we could be programming for infants or preschool age children at two feet."

Elementary schoolchildren will have the pool set for one metre for their swim lessons, she said.

The new building has two pools.

In addition to the smaller therapeutic pool, there's a 25-metre main pool. The old building on Saunders Street has a 17-metre pool.

The main pool in the new Y building also has a built-in ramp to make it accessible. The old pool had a temporary ramp that had to be put in and taken out.

The smaller pool will be heated to 88 degrees and the larger pool will be 82 degrees, said Russell.

There are also huge floor-to-ceiling windows in the pool room facing Dundonald Street to let in lots of natural light.

Russell said the building was designed to let in as much light as possible.

"It's really nice. It's always a balance between energy efficiency and having natural light."

The building is as environmentally friendly as possible. It has motion sensors to turn off lights when rooms aren't in use.

In addition to the pools, the building has a large exercise and dance studio, a full-size gymnasium and two squash courts on the main floor.

A wellness centre, a smaller exercise and dance studio and a new child-care centre built specifically for preschool age children are located upstairs, said Russell.

There are also multipurpose rooms and a kitchen.

"We are four weeks away from completion so it is pretty exciting. We have a lot of work still to do inside but it's coming together.

"We expect to open for public tours on the sixth of September, right after Labour Day."

The date the building will be open for use hasn't been firmed up.

"It's likely it's going to be Sept. 19, but it's a moving target right now until we get some more information," she said.

"The community's been great in terms of supporting the project and the contractors have been good.

"I really pleased with the progress."

Russell said the building is about two months behind schedule but that isn't unusual for a project of this scale.

She said the YMCA is planning a membership drive this fall to coincide with the opening of the building.

"We are really hoping to target families," said Russell. "One of our new membership categories is called early years. It starts at birth and goes until kindergarten."

"It is an age group we feel needs to be programmed for more in Fredericton."

She said they have about 3,600 members and they could handle up to 5,000.

Fredericton Mayor Brad Woodside said Tuesday the YMCA has always been an important part of the community.

"I'm very excited about the potential of the new opening and what that means for the community and looking forward to it," he said.

The mayor also praised J.W. (Bud) Bird, who chaired the fundraising campaign that raised the money for the building.

"Bud Bird is a tremendous asset to this community," Woodside said.

"He was in my office quite often and talking to council ... and is probably why they are where they are with this whole program."

The old YMCA building on Saunders Street is for sale, said Russell.

"We're optimistic," she said. "We are talking with one group right now."

She said the pool in the old building will probably have to be decommissioned but the gym will probably be used as a gym because there's a high demand for such space in the community.

The remaining space will likely be used for office space and multipurpose rooms, she said.

http://dailygleaner.canadaeast.com/cityregion/article/1428800
Reply With Quote
     
     
  #2877  
Old Posted Aug 9, 2011, 10:48 AM
Freddypop's Avatar
Freddypop Freddypop is offline
Registered User
 
Join Date: Mar 2008
Location: Go Pats!
Posts: 2,332
Amendment clears way for apartment building

Published Tuesday August 9th, 2011

A3 By HEATHER MCLAUGHLIN

[email protected]

City council has given third reading to a municipal plan and zoning amendment that clears the way for development of a 32-unit apartment building on the former TRA Cash and Carry property at 271 Queen St.

TC Land Holdings Inc. wants to develop the land. The company already obtained a demolition permit to remove the derelict wholesale grocery store on the site.

The apartment building will have street-level parking due to the land's proximity to the St. John River and the fact the land routinely floods in the spring. That means the first apartment units will be one floor up from the street.

The city had to approve a height change to allow the structure to go up 16.66 metres high. The height is in line with the majority of buildings in the city centre.

The five-storey building will have units ranging from 110 square metres (about 1,200 square feet) to 136 square metres (1,465 square feet). The larger units will have two bedrooms and a den. Karl Fischer Architect is designing the building.

In terms of scale, a city hall planning department report said the TD Tower at Westmorland and Queen streets is seven storeys, or 21 metres high. The adjacent parking garage to the west is 15.5 metres high, or five-storeys.

The city concluded the height of the new apartment development will fall in line with other structures.

Construction is expected to begin this year and be completed in 2012.

In another recent planning decision, DP Developments received approval for a rezoning and subdivision at Murray Avenue. DP Developments wants to build 37 townhouse units. Since the same developer owns adjoining properties, it's the first stage of a larger-scale development plan for the area that could include seniors housing, apartments and a nursing home.

http://dailygleaner.canadaeast.com/cityregion/article/1430277
Reply With Quote
     
     
  #2878  
Old Posted Aug 9, 2011, 6:14 PM
KnoxfordGuy's Avatar
KnoxfordGuy KnoxfordGuy is offline
New Brunswick booster!
 
Join Date: Jan 2011
Location: Fredericton, New Brunswick
Posts: 2,221
This is great news!
Reply With Quote
     
     
  #2879  
Old Posted Aug 10, 2011, 3:14 PM
cl812's Avatar
cl812 cl812 is offline
Registered User
 
Join Date: Sep 2007
Location: Fredericton, NB
Posts: 1,513
$39-M Chancery Place almost ready for province
Published Wednesday August 10th, 2011
A4
By HEATHER MCLAUGHLIN
[email protected]

Fredericton's role in building a new downtown government office building is finally drawing to a close as the New Brunswick government takes on the task of designing the layout of the offices and drawing up tenders for carpeting, office dividers and the final touches.


Above is the King Street side of Chancery Place located across from the Centennial Building in downtown Fredericton. The city is almost ready to hand the keys to the building over to the province.

The New Brunswick government decided in the spring to purchase the new six-storey office building on King Street from the City of Fredericton for its $39-million project cost. The province assumes the costs of interior finishes itself.

"They're doing the drawings and the layouts and ordering carpet and wall systems. They've had their tenders for that stuff," said Greg Cook, the city's director of special capital projects. "The building is 99.5 per cent done. It's basically just finishing up and cleanup.

"They basically control the building now. They're going to operate the boilers and the ventilation equipment. We'll be there for awhile just doing odds and ends and finishing up. We're working right around the main front entrance now to get the panelling in now, doing things that we didn't want to put in too early because it would get damaged too much," he said.

"We have to work together to get their work done and ours because there's a bit of interface," Cook said.

The city spokesman said he's not sure what the province has decided on in terms of timing for moving in, but outfitting six floors of office space will take a bit of time.

The city had hoped to hand over the office building to the province by May, but the project ran longer than expected.

The 15,300-square-metre (170,000-square-foot) building is a replacement for the Centennial Building. The province's plan has been to transfer the offices of Premier David Alward and departments such as Business New Brunswick, Finance, executive council, Intergovernmental Affairs, Justice, Human Resources, the attorney general and Communications New Brunswick to the new building.

"I know they're working with departments now, finalizing their drawings," he said.

City hall and the former Liberal government struck a deal in 2007 that would see the city finance the construction of the estimated $42-million government office building with the province paying the full cost of the structure through a 20-year lease.

The deal kept the debt off the province's books and left responsibility for borrowing and financing in the city's lap. The building was part of the $78-million, city-led convention centre and public parking garage development project in the downtown east end.

In March, however, the province decided it would buy the building, named Chancery Place, from the city. Supply and Services Minister Claude Williams said the government determined that buying the building was financially more feasible than leasing over the long term.

The city shook hands with the province because it will no longer have to carry the debt financing in its budgets for the next two decades.

"This is much cleaner for the province and for the city in terms of not only the construction and turning over of the building, but in the lease agreement and management and purchase of furniture and all of those things," Mayor Brad Woodside said at the end of March when city council accepted the province's offer.

The provincial government pays $39 million for the building and assumes the finishing costs under the agreement. The city's total project estimate, including the final interior finishes, was expected to be $42 million.

The decision to buy the building drew flak from the Liberals, who questioned why the government was taking the debt onto its books rather than sticking with the original deal.

But the Tories held firm in their defence of the deal, saying it makes more economic sense to buy the building.

http://dailygleaner.canadaeast.com/cityregion/article/1430638
Reply With Quote
     
     
  #2880  
Old Posted Aug 10, 2011, 4:48 PM
EricFrost EricFrost is offline
Registered User
 
Join Date: Apr 2010
Location: Canada
Posts: 6
Does anyone know if the brown siding on the chancery place is just temporary? It looks pretty awful the way it stands right now with glass on about 70% of it, then the rest is a cardboard or masonite looking surface. It's especially noticeable from the North Side where the blue glass would have looked good for the city's skyline instead of the drab color's that are there now.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 9:54 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.