Rotem has won another contract to build two-car automatic light rail trains, this time for right in their own backyard in Busan. Check out the cars:
Project | Busan-Gimhae LRV business
Authority | Busan-Gimhae LRV System Construction Authorities
Number of vehicles | 50
Contract date | 2006. 11. 16
Delivery date | by 2010. 7. 30
Maximum design speed / Vehicle set :
80km/h / 2 vehicles
Vehicle dimensions (L x W x H) : 2.7m x 2.65m x 3.4m
Gauge : Standard gauge (1,435 mm)
Body : Aluminum
Doors : Electric plug-in doors
Air Conditioner : 24,000kcal/h/set X 2
Brake / Coupler :
Regeneration & pneumatic braking / Automatic coupler
Bogie : Bolster bogie
Main ESA : MELCO / VVVF inverter / SIV / TM
Signal, TCMS : Thales CBTC, MELCO CCU
Applied standards :
KS, KRS, UIC Standards, Urban Railway Regulations
Features : RAMS application