Quote:
Originally Posted by lrt's friend
As a Calgarian, I must ask you if the plan for a downtown tunnel will not also be incorporated with a plan for a completely new LRT route to the southeast? If so, your tunnel will be accompanied by clear service improvements.
|
I will address your Calgary specific question first, and I think we both can agree that Ottawa's city councillors do not seem to have a coherent plan. The question I guess is what would a coherent plan look like?
For the downtown subway, there will be service improvements on two existing lines. one (NW-South) will have improvements from being underground, having 5 car stations, and being able to increase frequency to maximum. The other line (West-NE) will be improved as it will no longer share the current above ground infrastructure with the NW-South train, and will be able to move with less constraints, no interlocking, and a less congested track.
The SE LRT that you have alluded to is getting its own dedicated transit tunnel, as it is oriented north-south in downtown, versus the traditional east-west orientation of our current setup. In 30-40 years Calgary's downtown will have at least 3 dedicated one line subways, after the line that was originally left above ground is moved below.
The plans for the SE LRT are independent all but for the fact that the lines do cross, and transfer stations will need to be planned, and the SE route will likely have to be deeper than otherwise would need to be the case.
Quote:
|
I would argue that this is not entirely true. Sure, it will be expensive to accomodate growth in the bus system and would require the construction of a bus tunnel, but the alternative that we have chosen is even more expensive.
|
I would hope that and do remember an analysis of operating costs of different modes came into account here. The fault for slanting towards LRT when the economic case was pretty even was that the city receives a much larger capital subsidy than an operating subsidy. It distorts the market, and creates an incentive to build the highest cost system you can afford that has the lowest operating costs.
Again, the city does not even benefit greatly from this, because councilors were allowed to use markers and draw in new transit lines where they thought it was wanted. Plus they were even allowed to designate the modes. It isn't the most stellar example of professional planning I have seen.
Quote:
|
I do not believe that our politicians have consciously made that choice although that will be the outcome. This is where I have a problem with the current plan. We have lost sight of our objectives in designing the current plan. Was it really our ONLY intension to resolve the downtown congestion problem? I don't think so, but because of numerous compromises, this appears to be all that we will accomplish. What has muddied the waters here is the mayor's continued insistance that there will be a substantial speed improvement that comes about from LRT, which is clearly not true. This has become an urban legend, and it has become impossible to relay the proper facts about the very limited speed enhancement of LRT when including the transfer penalty that most people will face.
|
People will still perceive a speed improvement even if it isn't the case. There will be a speed improvement for people that don't need to transfer. This is actually a good thing because it should increase political pressure to stop building transit way on the main line and expand LRT as quick as possible. Seeing a transitway station in operation, I am also guessing that most of the stations could not have handled 30,000 p/d/h wihtout major upgrades.
Quote:
|
Again, I question that the original plan had limited viability. There have been ongoing examinations of a bus tunnel and that would have given us about the same amount of capacity as LRT. Furthermore, a bus tunnel would have been able to incorporate the continued use of the Albert-Slater corridor providing further capacity. Once the Transitway is converted, most buses will not be able to efficiently reach the Albert-Slater corridor so we are effectively limiting ourselves to only the tunnel except for local bus service.
|
Sometimes limits on the system are good, since they induce path dependency. They force your successors to finish your original plan. From a public policy perspective the problem with the busway was that there is almost no path dependency besides sunk costs. It can be continually tinkered with to the detriment of the original system, and it has never been finished as you point out.
Quote:
|
We also have to be careful about drawing too many parallels between Ottawa and Calgary. Calgary's transit system has been tremendously successful in delivering transit riders into downtown and Calgary has reinforced this by intensifying its downtown and emphasizing employment growth there. I question how effective transit is in delivering passengers away from downtown and the LRT corridors. Ottawa is designed differently and downtown expansion is limited because of geographic constraints, nearby heritage neighbourhoods and building height regulations. Because of this employment areas have been spread out and the bus Transitway system has been able to effectively serve those employment areas away from downtown. This has been accomplished by reducing the number of transfers needed to reach those locations. With the introduction of LRT, we start adding back transfers, which makes transit less competitive away from downtown. We all know that employment growth will be more rapid away from downtown therefore LRT (as presently planned) may actually become an impediment to transit ridership growth. The scenario of 3 seat or 5 seat trips is not going to attract transit riders, when in most cases, free parking is available. Transit becomes not a viable option for those suburban employment nodes such as the new RCMP site.
|
Perhaps this is the greatest failure of all of the transitway, it allows for urban planning decisions to be made that are not optimal. It allowed normal situation or transfer from one express bus to another to have virtual door to door service of two disparate points that are not proximate to the transitway. If a campus is to be placed, it should be near a transitway stop. It should not be allowed away from a transitway stop. With the frequencies of all the different modes along the transit ways being in the 2 minute range, the transfer penalty outside the commute home trip transfer onto the feeder bus is virtually 0.
I know plenty of people at work that do a bus, train, train, bus commute (work has free parking). Or to university a bus, train, train commute. ($4 parking, but transit is included as part of tuition).
Moving employment from downtown isn't really a problem, as long as it is still pedestrian proximate to a transit way station.
Calgary has the same issues, with height restrictions (shadows on the river, parks) geographic constraints (residential neighborhoods on four sides, CPR tracks, rivers). Ottawa has alot of office space in the core, and I would bet the core or rather developable area works out to a larger area than Calgary's. That is just an educated guess from foot exploring downtown Ottawa.
Quote:
|
Waiting perhaps a lifetime for full conversion of the Transitways will leave transit stagnant in Ottawa for that period as most resources are placed into Transitway conversion instead of transit expansion. This 'switching gears' for our rapid transit system is really redoing 30 years of work, with limited benefits. Then, on top of that, we continue to build more and more bus Transitway, at a pace faster than we build LRT. Again, this is all part of the compromise process, which I think leaves us on a continued path of building and rebuilding rapid transit and wasted money in the longer-term.
|
Well, to be fair all should be built as soon as possible, with a huge bond issue that is locked in at today's historically low rates. You would likely save enough in operating costs to pay the interest charges, or even more so you end up ahead.
As for the mode switching issue, I guess the argument against all your points is: if you continue to do the same things, and expect different results that is the definition of insanity.