Some construction progress photos of the Edmonton Clinic.
All photos taken by me on Saturday February 7 of 2009. Some rights reserved:
Click photos to enlarge.
Centre of the Edmonton Clinic South (ECS) site. Some excavation work continues in the foreground:
The west-end of the ECS site is still being dug out:
The east portion of the ECS near 114 Street already has some concrete:
A forest of pillars creeping north in the pit of the Edmonton Clinic North (ECN) site. In the distance another yellow-green tarped structure for CCIS is visible above Physical Education East and the Administration building:
Several vertical structures rising above ground level on the southern portion of ECN:
Another construction project gets underway near the Edmonton Clinic: site preparation has started for the U of A heating plant expansion. In what I remembers from the renders, the east and north face of this building (facing the Edmonton Clinic) have some 'architectural treatment' to hide the fact that this will essentially be an industrial warehouse type structure. I believe the architects are ONPA:
More photos available on my Flickr page (first 13 photos in the Campus Construction photo stream):
http://www.flickr.com/photos/11774070@N04/sets/72157602048312751/