**EDMONTON METRO REGION PROJECTS, PROPOSALS, RENDERINGS AND RUMOURS**
Renderings and new information (such as rumours, proposals, approvals, etc) are added to this first page on a regular basis, as it becomes available. Information that needs updating or changing status, please PM or add it in the discussion thread.
Press "Ctrl-F" if you want to search for projects within this page
Press "Esc" if you want quit loading all the numerous images on this thread.
Press "Ctrl+F5"If some images do not load right away, this will refresh your Web Browser
Edmonton Information:
City Population – 752,412 (2008.)
Edmonton
CMA Population - 1,034,945 (2006.)
Edmonton Capital Region
Incorporation as Town - 1892
Incorporation as City - 1904
Total Area- 683.88 km² (2004)
Elevation– 688 m above sea level
Total Area of Parks/Open Spaces - 111 km² (27,400 acres) of parkland. Within a 25 km long river valley park system there are 11 lakes, 14 ravines, and 22 major parks.
Branding/Motto - "City of Champions" "Gateway to the North" "Oil Country"
Mayor – Stephen Mandel (34th Mayor of Edmonton)
Last Municipal Election- Oct. 17, 2007
Next Municipal Election - Oct. 18, 2010
Important Links:
Edmonton
Edmonton Capital Region
Connect2Edmonton - a forum of topics of importance to Greater Edmonton's future.
Focus Edmonton: City Plan
Alberta Ministry of Infrastructure and Transportation
Alberta Ministry of Municipal Affairs and Housing
Edmonton Economic Development
Edmonton Transit
Edmonton SLRT Expansion information PDF
Moving Edmonton – Updating the Transportation Master Plan
High Speed Transit Planning Study PDF
Alberta Municipal Government Act
Edmonton Design Committee
Revitalization studies, Park developments and Neighborhood plan Links
105 Avenue Multi Use Trail Corridor and Streetscaping Project
109th Street Corridor Study PDF
Old Town Fort Road Redevelopment
City of Edmonton Downtown Plan
Alberta Avenue Initiative Revitalization Study PDF
The Quarters revitalization plan
Terwillegar Park concept study
Stadium LRT station transit oriented development
**COMMERCIAL & GOVERNMENT OFFICE**
High Rise- Epcor Tower - Under Construction
Developer: Qualico Developments
Architect: Kasian Architects
General Contractor: Ledcor
Location: 101 Street & 105 Ave NW
Number of floors: 29
Fly-by Video

- Professional Building addition/remodel - Under Construction
Developer: Procura Real Estate Development
Architect: ATB Architecture
General Contractor: Chandos Construction
Location: 10930 Jasper Ave NW
Number of floors: 12



- Federal Building renovation & plaza expansion - Under construction
Developer: Federal government & Alberta Infrastrucure
Architect: Kasian
General Contractor: Clark Builders
Location: 98 st & 107-108 ave NW
Number of floors: 10



- The Metro - Approved
Developer: Ironwood
Architect: HIP Architects
Location: 103 St &102 Ave NW
Number of floors: 15

- West Link Office Park - Proposed
Developer: Cushman & Wakefield
Location: 170 St & 107 Ave NW
Number of Floors: 10

- Huntington Hills HSBC Bank Tower Proposed
Location: 4420 Calgary Trail NW
- Tri-Corp Canada Place - Proposed
Developer: Tri-Corp Canada
Location: 104 Ave & 101 St NW (unconfirmed)
Number of Floors: 16-24
- Office tower on Jasper/102st - Proposed
Developer: Melcor
Architect: Stantec
Location: Jasper Ave & 102 St NW
Number of floors: 23-25

- Canterra Office Tower - Proposed
Developer: Canterra Properties
Location: Jasper Ave & 111 St NW
Number of floors: 12
- Bell Tower 2 - Proposed
Developer: Oxford Properties
Location: 101 St & 104 Ave NW (Staples Lot)
Number of floors: 20-30
- BMO Tower Replacement - Proposed
Developer: GE Energy
Location: Jasper Ave 101 Street
Number of floors: 20-25

- Petroleum Plaza Retrofit/ Addition - Proposed
Location: 108 St & 100 Ave NW
Number of floors: 12


- Canada Place Addition/ 3rd Phase - Rumored
**MIXED USE- RESIDENTIAL, COMMERCIAL, OFFICE, HOTEL**- StationLands - Proposed Tower A Under Constrction as Epcor tower
Developer: Qualico Developments
Architect: Kasian Architecture
Location: 105A Ave & 97-101 St
Number of floors:
Tower A: 29 Tower C: 15
Tower B: 37 Tower D: 21

- Paramount tower - Proposed
Developer: Procura Real Estate Development
Location: Jasper Ave & 103 St NW
Number of floors: 40
- West Edmonton Mall Expansion- Approved
155,000 sqft expansion of retail space around Entrance 50 and east of the WaterPark
West Edmonton Mall Parkade Expansion- Approved
WEM convention centre
WEM WHL Hockey Arena
This will include additional retail space, a facility for sports, trade shows and conventions, a 12-story office building, and a 600-unit apartment building, along with more parking.
WEM Office Building - Rumored
Location: West Edmonton Mall site
Number of floors: 12
WEM 2nd Hotel - Approved
Location: West Edmonton Mall site
Number of floors: 12
- The Finesse - Rumored
Architect: ATB Architecture

**HIGH RISE RESIDENTIAL**- Century Park - Under Construction - Last News: full build out over many years
Developer: Westbank Projects Corp and Procura
Architect: James KM Cheng andATB Architecture
Location: Former Heritage Mall Site, East side of 111th Street, North of 23rd Avenue
Number of Floors:
Tower 1 - 20 Tower 2 - 18
Tower 3 - 18 Tower 4 - 20
Tower 5 - 24 Tower 6 - 24
Tower 7 - 24 Tower 8 - 24
Tower 9 - 12 Tower 10 - 20
Tower 11 - 16 Tower 12 - 12 Floors

- The Icon
Tower 1 - Complete
Tower 2 – Under Construction
Developer:Langham Properties
Architect: Brinsmead Kennedy Architecture
Location: 104th Street between 102 Avenue and Jasper Avenue
Number of floors: Tower 1 - 30 Tower 2 - 35

- Quest - Under Construction
Developer: Regency Developments
Architect: Brinsmead Kennedy Architecture
Location: 105 St & 104 Ave
Number of floors: 24




- Serenity - Under Construction
Developer: Urban Landmarks
Architect: CSG and Brinsmead Kennedy Architecture
Location: Jasper Ave & 118 St NW
Number of floors: 12

- Meridian - Under Construction
Location: 111 St North of Jasper Ave
Number of floors: 10



- Aurora – Approved
Developer: Urban Landmarks
Architect: Brinsmead Kennedy Architecture
Location: 102 St to 104 St NW from 105 Ave-106 Ave
Number of Floors:
Building D: 28 Building E: 28
Building F: 25 Building B: 23
Building C: 23 Building A: 17





- Mayfair Place (buildings 1 & 2) - Approved
Developer: Procura Real Estate Development
Architect: ATB Architecture
Location: 109 st & Jasper Ave NW, South east corner
Number of floors: building 1- 16 building 2- 16

- Concert Properties Jasper Ave 124 st - Approved
Developer: Concert Properties
Location: 12424 Jasper Ave NW
Number of floors: 11


- Glenora Towers - Approved
Architect: Brinsmead Kennedy Architecture
Location: 142 Street & Stony Plain Road NW
Number of floors:
Tower 1: 17
Tower 2: 13
Tower 3: 11
Tower 4: 11
Tower 5: 8



- Strathern Heights - Approved
Architect: Sturgess Architecture
Number of floors:
Tower 1: 19
Tower 2: 17
Tower 3: 17
Tower 4: 17

- Opus - Approved
Architect: Brinsmead Kennedy Architecture
Location: 104 St & 98 Ave NW
Number of Floors: 26

- Rossdale Green - Approved
Developer: Communitas
Architect: Hartwig Architecture
Location: 105 St & 96 Ave NW
Number of floors: 12


- Valleyview Tower - Approved
Developer: Vinterra Properties
Location: Jasper Ave & 96 St NW
Number of floors: 16





Mondrian - Approved
Developer: Arcus Developments
Architect: Kirkor Architects
Location: 109 St & 105 Ave NW
Number of floors:
Tower 1: 13
Tower 2: 13


- Azur Lofts- Approved
Developer: Procura Real Estate Development
Architect: ATB Architecture
Location: Jasper Ave & 110 St NW
Number of Floors: 17

- The Oliver- Approved
Architect: CW Tse Architects and ISL Engineering and Landscape Architecture.
Location: 10024 110 Street
Number of Floors: 14


- Cascadia - Proposed
Developer: Procura Real Estate Development
Architect: ATB Architecture
Location: 109 st NW, between 100 Ave & Jasper Ave
Number of floors: 14

- Urbia Tower - Proposed
Developer: Urbia Developments
Architect: Brinsmead Kennedy Architecture
Location: 104 Ave & 102 St NW
Number of floors: 40-50


- Parkwood Tower Proposed
Architect: Brinsmead Kennedy Architecture
Location: 105 St & 97 Ave NW
Number of floors: 26



- 5th Avenue Vista Proposed
Developer: Christenson Developments
Architect: ATB Architecture
Location: 105 Ave & 111-112 St
Number of floors: 12

- Eton Park Estates Proposed
Developer: Christenson Developments
Location: Clover Bar Rd & Emerald Drive Sherwood Park
Number of floors:
Tower 1: 12
Tower 2: 12

- Bellamy Hill Tower -Proposed
Developer: Trans America Group
Architect: Holland Roth Architects
Location: Bellamy Hill
Number of floors: 32

- Founder's Ridge - Proposed
Developer: BCM Developments Ltd
Architect: Hartwig Architecture Inc
Location: 105 St & 98 Ave NW
Number of floors: 28


- East Hampton Rise - Proposed
Developer: Guild Developments
Architect: Richard Fairbanks Architects
Location: 5351 199 St NW
Number of floors:
Tower 1: 19
Tower 2: 19

- Tango - Proposed
Architect: Brinsmead Kennedy Architecture
Location: Jasper Ave & 84 St NW
Number of floors: 26



- Rain Tree - Proposed
Architect: Brinsmead Kennedy Architecture
Location: East of Legislature Grounds
Number of floors: 32


- 118th Street Apartments - Proposed
Architect: W. Keith Rankin
Location: 10135-118 STREET NW
Floors: 12
- Clifton Place - Proposed
Location: High Street & Stoney Plain Road
Floors: 15

- Jasper High Rise - Proposed
Architect: HIP Architects
Location: 8204 Jasper Ave NW
- The Edmontonian - Proposed
Developer: BCM Developments Ltd
Location: 101 St & 106 Ave NW
Number Floors: 42


- RK East - Proposed
Developer: RK Developments
Architect: Brinsmead Kennedy Architecture
Location: 85 Street NW South of Commonwealth Stadium
Number of Floors:
Tower 1: 26
Tower 2: 32
Tower 3: 38



- The Pearl - Proposed
Architect: Brinsmead Kennedy Architecture
Location: Jasper Ave & 119 St NW
Number of Floors: 35



- Abbey Lane Tower - Proposed
Location: 10406 98 Ave NW
Number of Floors: 31


- Viking Arms - Proposed
Location: Southgate
Number of Floors: 35


- China Town Condo - Proposed
Location: 105ave/98 Street
Number of floors: 13
- The Pines - Proposed
Developer: Westcorp
Location: 51 Ave NW
Number of floors: 16

- The New North - Proposed
Developer: Alldritt Homes LTD
Location: Claireview
Number of Floors:
Tower 1: 12
Tower 2: 12
Tower 3: 12
Tower 4: 12
- Corner 1 Towers - Proposed
Developer: BCM Developments Ltd
Location: Jasper Ave & 95 St NW
Number of floors: 22
- Charles Campsell Old Hospital site- Proposed
Architect: DUB Architects
Location: 12700 114 St NW

- Red Leaf Bellamy Hill Tower - Rumored
Developer: Red Leaf Developers
Location: 99ave Bellamy hill
- 103ave/105st tower - Rumored
Architect: Brinsmead Kennedy Architecture
Location: 104ave/105st
Number of floors: 21
- Crown Plaza Condo Tower - Rumored
Architect: Stantec
Location: 100 Ave & 101 St NW
Number of floors: 40 (rumoured)
**LOW RISE COMMERCIAL/ GOVERNMENT/ RETAIL**- Alberta Motor Association (AMA) Office - Under Construction
Architect: ATB Architecture
Location: 109 Street & Kingsway Ave
Number of floors: 3
- Kinsway Mall Renovation - Under Construction
Developer: Oxford Properties
General Contractor: Ledcor
Location: 109 Street & Kingsway Ave
Number of floors: 3

- Southgate Centre Renovation - Under Construction
Developer: Ivanhoe Cambridge
Location: Whitemud Drive & 111 Street
Number of floors: 3
- Sherwood Park Community Centre - Under Construction
Project includes construction of a library, council chambers, art space and other features.
Developer: Strathcona County
Location: Festival Ave and Sherwood Drive, Sherwood Park
Number of floors: 2


- Windermere - Under Construction
Developer: Harvard Developments
Architect: Kasian
Planner: Stantec
Location: South of Anthony Henday, on Tewillegar
Number of floors: Various

- 104 Street office - Approved
Architect: Arndt Tkalcic Bengert
Location: 10133-104 Street NW
Number of floors: 6
- Coronation Plaza - Approved
Location: 142 Ave 111 Sreet
Number of floors: 4

- Boardwalk Market Redevelopment - Approved
Architect: Stantec
Location: 10310 102 Ave NW
Number of floors: 4
- Westcorp Office - Proposed
Developer: Westcorp
Architect: Templar Architecture
Location: 10013 101A Ave NW
Number of floors: 4


**LOW RISE RESIDENTIAL**- Time Square - Under Construction
Developer: Aman Building Corporation
Location: 106 St & 102 Ave NW
Number of floors: 4

- The Venetian- Under Construction
Developer: Abbey Lane
Architect: CSG
Location: Old site of Sidetrack Cafe on 104th Avenue
Number of floors: 6


- The Zen - Under Construction
Developer: BCM Developments Ltd
Architect: GMH Architects
Location: 114st and 105ave
Number of floors: 6


- SoHo in Cloverdale - Under Construction
Developer: Time developments
Location: Cloverdale
Number of floors: 4

- Center in the Park - Under Construction
Developer: Christenson Developments
Architect: ATB Architecture
Location: Sherwood Park - Sherwood Drive near County Hall
Number of floors: 4

- M-TRAC - Under Construction
Location: 105 Ave East of 116st
Number of floors: 5
- Trinity Pointe - Under Construction
Developer: Time developments
Location: whyte and 87st ish
Number of floors: 6

- King Street on the Park – Under Construction
Developer: Renoir
Location: King Street, Spruce Grove
Number of floors: 9

- Maxx Under Construction
Developer: BCM Developments
Location: 10540 113 Street
Number of floors: 6
- Gates on 17th - Under Construction
Location: 117st and 105/106ave
Number of floors: 4
- Belmonte Place - Approved
Developer: J.J. Max Developments
Location: 10767 95 Ave.
Number of floors: 4

- Edge - Approved
Developer: Time developments
Architect: Brinsmead Ziola Kennedy Architecture
Location: Oliver area (117street)
Number of floors: 6


- Artisan Condo Proposed
Architect: Ziola NewStudio
Location: 10903 111 Ave NW
Number of floors: 4


- Saunders Manor Proposed
Developer: Tri-Corp Canada
Location: 6120 104 ST
- Allendale Condo Proposed
Architect: Brinsmead Ziola Kennedy Architecture
Location: 6120 104 ST
Number of floors: 6



- Essence Proposed
Developer: Time developments
Location: south of jasper around 112 street
**EDMONTON'S EDUCATIONAL, MEDICAL, RECREATIONAL, ENTERTAINMENT AND ARTS FACILITY CONSTRUCTION**
UNIVERSITY OF ALBERTA- University of Alberta Faculty of Science (CCIS) - Under Construction
Architect: O'Neill O'Neill Procinsky Architects
General Contractor: PCL
Location: University- Saskatchewan Drive
Number of floors: 7


- Edmonton Clinic North and Edmonton Clinic South - Under construction
Developer: University of Alberta/ Capital Health
Architect: HOK Architects/ Callison Architects
Location: W of 114street West of U of A
Number of floors: South building= 8 North building = 6




NORTHERN ALBERTA INSTITUTE OF TECHNOLOGY- NAIT Souch Campus Addition - Approved
Location: Gateway Blvd & 72 Street NW
Number of Floors: 2
- NAIT Ralph Klein campus - Proposed
Location: S of Ellersiele Rd, E of QEII


- NAIT Center for Buisness - Proposed
Location: NAIT Main campus
OTHER EDUCATIONAL FACILITIES- Neuman Theological College Seminary - Under construction
Architect: Cohos Evamy
Location: 98 Ave & 84 Street NW Corner
Number of floors: 2


- Grant MacEwan Arts Centre - Proposed
Location: 104 Ave & 111 St
- Norquest College - 3 buildings Proposed
Architect: Cohos-evamy
Location: 103 ave 107/108st



MEDICAL FACILITIES- Royal Alex Hospital - Lois Hole Expansion (Center for Women) - Under Construction
Architect: Cohos-evamy
Location: Royal Alexandra Hospital
Number of floors: 7

- Royal Alexander Hospital New Orthopedic Clinic - Under Construction
Location: 109A Ave & 102 St
Number of floors: 6
RECREATIONAL, ENTERTAINMENT AND ARTS FACILITIES- Art Gallery of Alberta Under Construction
Architect: Randall Stout, HIP Architects
Location: 99st 103ave
Number of floors: 4


- Ukrainian Canadian Archives & Museum of Alberta (UCAMA) Under Construction
Architect: HIP Architects
General contractor: Delnor Construction
Location: Jasper Ave & 96 St
Number of floors: 3

- Commonwealth Rec Centre & Fieldhouse Under construction
Location: South of Commonwealth Stadium, Stadium Road and 92st NW
Architect CIty of Edmonton architect Carol Belanger
General contractor Clark Builders



- Royal Alberta Museum Renovations - Proposed
Architect: Cohos-evamy



- Northlands AgriCom Expansion- New Building - Under Construction
Northlands AgriCom Expansion- Renovation - Under Construction
Developer: Northlands Architect: Cohos-evamy
Location: 118th Ave & 75 th St
Number of floors: 3

- Downtown Arena / Recreation complex - Rumoured
Latest news: Architect Gene Dub of Dub Architects Unveils an unsolicited proposal for an arena spanning two city blocks immediately south of the Edmonton Police Service downtown office at 104 A Ave and 96 Street. The proposal includes an arena suspended over 96 street and two adjoining towers. Council has not commented on the proposal.
YouTube fly-by video




Previous news: Feasability report just released recommending dowtown placement of an arena.
Drawing shows possible post office site.

**EDMONTON TRANSPORTATION AND INFRASTRUCTURE CONSTRUCTION**
Edmonton International Airport
2007 - 2012 Expansion Project
An additional 13 bridges will be built on the south side of the terminal, boosting the total number of bridges to 30 from the current 17.
Phase 1 (completion date 2010): 253,000 square metres of new apron space to accommodate new south terminal development.
Phase 2 (completition date 2010): A new "hammerhead" located south of the current airport terminal.
Phase 3 (completion date 2012): A new concourse linking the existing south terminal with the "hammerhead", new control & office tower.
Source:
Edmonton International Airport Expansion
New airport hotel
A 192-room Courtyard by Marriott hotel will also begin construction in 2008. The costs for this project will be borne by the developer, Concord Hospitality Enterprises Company, and is not part of the $1 billion airport expansion.
Source:
Edmonton International Airport Expansion
Edmonton LRT Construction
South LRT (SLRT)
The extension will occur over three phases.
Phase 1: Health Science Station Opened January 2006
Phase 2: Health Sciences Station to South Campus Station opens by the end of 2008
Phase 3: South Campus Station to Century Park opens by the end of 2009
Belgravia/Mckernan (76 Ave) Station - 2009
Neil Crawford Station (UofA South Campus) - 2009
Southgate Station - Late 2009
Whitemud LRT Bridge
Century Park Station - Late 2009
West to Lewis Estates LRT Planning Study (WLRT)
The Transportation Department is undertaking a reassessment of the strategic level planning, completed to date, to identify a route for the proposed LRT extension from Downtown to Lewis Estates.
The reassessment emphasizes additional criteria including Transit Oriented Development (TOD), regional initiatives and the Goals outlined in the upcoming Municipal Development Plan (MDP) and Transportation Master Plan (TMP).
North LRT extension (NLRT)
Information pertaining to the extension of the LRT system from Churchill station to NAIT (PDF)
Edmonton Freeway/Major Road Construction
Anthony Henday Drive
Anthony Henday NE - Proposed
2011 for start and beyond. Maybe 2015 before completion
Anthony Henday Drive NW
Part of the NW portion from Yellowhead to 137 avenue / West Regional Road opened.
Tenders due in 2008, Construction to start in 2009
Anthony Henday Stoney Plain Road Interchange
Part of the NW portion of the AHD. Construction to start at fist phase of NW AHD
Tenders due in 2008, Construction to start in 2009
23 Ave and Gateway Blvd - Under Construction
Edmonton Ports
GreyHound / VIA Rail Hub
Architect: O'Neill O'Neill Procinsky Architects
Location: 121 Street and Yellowhead Trail at current Via Rail Station
Port Alberta
http://corporate.edmontonairports.com/business_at_the_airport/port_alberta
Location: Edmonton International Airport
13,000 sq. metres of dedicated new cargo apron in 2007
3,000 acres under development plan for 2008