Quote:
Originally Posted by racc
Not sure they would even need a pit. There is quite a hill at GNW and Prince Ed. I suspect they could just start tunnelling into the embankment without digging a pit. The station could even be at grade reducing costs although I believe the plan was to have it elevated a bit further east.
|
By "pit" I meant a TBM staging (assembly) area. I suppose they could excavate into the hillside for a staging area.
*************
Dleung's plan looks good - but as others have mentioned, I don't agree with a trench on University Blvd.
In addition, the tunnel portal doesn't need to be in the median of University Blvd - it could be on some golf course land and the line could route around to the University's projects on the south part of campus (either before or after a main station near Wesbrook Mall).
WRT Cambie Station, although the knockout panel is on the west end of the mezzanine, the station can be located under the City owned block to the east (i.e. between Yukon and Cambie) and tied into the Canada Line station from the east.
WRT boring versus cut and cover, if the bore is deeper, then station construction costs would be higher for a bored tunnel. Note that InTransitBC was also going to try using a post-tensioned precast segment system for the stacked cut and cover tunnel but given the time constraints, the cast in place method was used because of the advantages of multiple fronts. So if there's no time constraint, maybe a cut and cover tunnel using precast segments could be cheaper than a bored tunnel.