HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #3301  
Old Posted Apr 28, 2008, 1:56 PM
Jerry's Avatar
Jerry Jerry is online now
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Quote:
Originally Posted by macca View Post
Looks like they only did half the building. If I remember correctly, the whole thing was apartements. How is it possible that, in this market, you can make more money with a parking lot than apartments? They must be buildings something.
There are people living in the other building. One sign of hope is that the shovel has not left. Maybe everyone moves out at the end of April and demo. continues.

I have been asking questions but getting no answers.
     
     
  #3302  
Old Posted Apr 28, 2008, 8:42 PM
macca's Avatar
macca macca is offline
the heat goes on
 
Join Date: Jul 2006
Location: Saskatoon, SK
Posts: 712
Quote:
Originally Posted by macca View Post
It's not the site that has the large signs advertising the low rise office building, it's the adjacent parcel, immediately across from the Rumely.
Update on this exciting project:

A closer insepction reveals that there is a permanent (attached to the ground), barbed wire fence with a large gate on the side of the site across form the Rumley, while the rest of the lot has a temporary wire fence.

There was cars parked inside. They appear to be turning it into to some sort of fortified compound.
     
     
  #3303  
Old Posted Apr 28, 2008, 8:46 PM
kgc087's Avatar
kgc087 kgc087 is offline
Urban Dreamer
 
Join Date: Apr 2008
Location: Saskatoon
Posts: 1,128
Mayfair Pool future questioned
Upgrading aging facility would cost city millions, report tells councillors
Lana Haight, The StarPhoenix
Published: Monday, April 28, 2008
Mayfair Pool is a leaky vessel and the fix will not come cheap.

A report going to Saskatoon city council's executive committee this afternoon raises a red flag over the future of the outdoor pool in the Caswell Hill neighbourhood.

"The Mayfair Pool has been in operation for the past 50 years and it has reached its life expectancy," wrote Catherine Gryba, the city's leisure services branch manager, in her report to the committee.

During the spring of 2006, the pool, with its 312,000 gallon capacity, lost 7,000 gallons of water per day. The problem lies with the underground pipe systems, says the report. The short-term fix in 2006 would have cost $140,000, but that wouldn't have solved all of the pool's structural problems.

"Over the next five to 10 years, structural repair of the pool apron and mechanical room, and replacement of below grade piping, will be required at an estimate of $1 million (in 2006 dollars)," says the report.

However, the upgrades wouldn't stop there. Because such repairs would be considered "major," the city would be required to overhaul all of the mechanical systems to meet provincial swimming pool regulations.

"In effect, this would mean the entire pool would need to be rebuilt. In 2007, the estimated cost to rebuilt was $3 million to $5 million," notes the report.

Located on 32nd Street West between avenues F and G, Mayfair pool is a popular spot for many families.

"I'm pretty sure most of the houses in this neighbourhood don't have the best insulation. Unless you have central air, they get very, very hot. That pool's a life-saver on some of those hot days," said Tanis Shanks, who moved to Caswell Hill with her husband and children two years ago after they bought a house there.

Shanks, who describes her family as "a family of swimmers," used the pool three times a week last summer -- to cool off, have fun and get some exercise. Being able to walk to the pool is important, she says.

"Not everyone has a vehicle, and with the rising cost of gasoline, I know I don't want to drive if I don't have to."

Melanie Sadler, secretary for the Caswell Hill community association, sees the pool as an asset for the neighbourhood as more young families buy homes in the area.

"I love it. It's one of my favourite things about the neighbourhood," said Sadler, who lives kitty-corner to the pool.

"There's lots of kids in the neighbourhood. In the summer, when I go by, there are always kids playing in the pool. It's a place where they go to hang out and do constructive things. Having things for do, in general, is a good thing."

The $3-million to $5-million price tag for a new outdoor pool is an awful lot of money, says Darren Hill, the city councillor for the area. But he says if the pool is closed, some other form of recreational facility would need to be built as a replacement and the cost for any facility would likely be as much.

"A lot of crime is the result of bored youth and nothing to do," he said.

The city is going into the consultation process with the community ready to listen to all ideas, says Hill.

Ten years ago, the city considered closing the pool and decided to keep it open because of "public outcry." Hill doesn't know if residents will feel the same this time around.

Dates for public meetings haven't been set. The report says community associations in the area will be involved in developing the plan to consult with the residents.

[email protected]
____________________________________

I think reconstructing this recreational area in the city core would be a huge aid to the redevelopment of the Mayfair area.
__________________
Just be.
     
     
  #3304  
Old Posted Apr 28, 2008, 11:44 PM
joelpiecowye's Avatar
joelpiecowye joelpiecowye is offline
Registered User
 
Join Date: Mar 2007
Location: Saskatoon_Cambridge_Den Haag
Posts: 426
possibly but i would perfer the city to invest in more important things like the new police station to lower our cities crime so we can mabey one day get out of Canada worst crime citys, i would also perfer the money to go to the south bridge so it will look less like the circle drive bridge and mabey more neat like this


winnipeg

other than this

circle drive saskatoon
__________________
Its out time to Shine
     
     
  #3305  
Old Posted Apr 29, 2008, 4:50 AM
kgc087's Avatar
kgc087 kgc087 is offline
Urban Dreamer
 
Join Date: Apr 2008
Location: Saskatoon
Posts: 1,128
Quote:
Originally Posted by joelpiecowye View Post
possibly but i would perfer the city to invest in more important things like the new police station to lower our cities crime so we can mabey one day get out of Canada worst crime citys, i would also perfer the money to go to the south bridge so it will look less like the circle drive bridge and mabey more neat like this


winnipeg

other than this

circle drive saskatoon
Can't argue with that, especially lowering the crime rate. How long are they expecting before the police station is complete? Where is it supposed to be located?
__________________
Just be.
     
     
  #3306  
Old Posted Apr 29, 2008, 5:03 AM
kgc087's Avatar
kgc087 kgc087 is offline
Urban Dreamer
 
Join Date: Apr 2008
Location: Saskatoon
Posts: 1,128
Councillors OK extension for Station 20 West project
Lori Coolican, TheStarPhoenix.com
Published: Tuesday, April 29, 2008
Proponents of the beleaguered Station 20 West project heard some encouraging - and unanimous - words of support Monday from city councillors.

Spectators broke into applause after council's executive committee voted quickly to give the project at least another year to begin construction before the city takes any steps to buy back the reclaimed inner-city land it sold to organizers for $1.

The original sale called for the first construction permits to be issued by September of this year, but a controversial decision by the Saskatchewan Party government to withdraw $8 million from the project has forced organizers back to the drawing board.

"Given the importance of this project to the city of Saskatoon, as well as in consideration of the amount of public money the city has put in with respect to remediation of the site, I think it's important that council give the extension and give the proponents an opportunity to regroup and decide what they're going to do on a go-forward basis," said Coun. Tiffany Paulsen.

Coun. Glen Penner said a number of people have contacted him about extending the project's deadline.

"I've never felt that there was any problem with the extension. . . . A good idea is a good idea," he said. "I think this was a good idea when it was first brought to our attention, I think it remains a good idea, and I hope by having the extension the folks that are involved in this will be able to raise more money and do more that they would like to do."

Station 20 West is a product of three or four years' work by many people in the core neighbourhoods who felt excited that a needed service was under development, noted Coun. Bob Pringle.

"I think it does enhance the services in the core area - even a scaled-back version would do that - and I think it also contributes to the revitalization of the core area. It's obvious that Station 20 West has good community support," Pringle said.

"I'm on board with that," echoed Coun. Myles Heidt.

"We were the first out of the gate to get this thing going and . . . I don't know why we wouldn't extend an extension - and if this one isn't long enough and they're moving forward, why we wouldn't continue on (with a further extension next year)."

Project manager Paul Wilkinson told the committee a new design has been prepared for Station 20 West, covering 19,000 square feet on two floors, for an estimated total cost of $2.6 million - significantly less than the $11.5 million originally envisioned for the facility. The new design includes space for a co-operative grocery store known as Good Food Junction.

Organizers recently learned members of the Saskatoon Co-op have resolved to look for ways to help the Good Food Junction be successful, Wilkinson said.

"We believe we can raise the money we need within the time period that we've asked for," he added.

Public reaction to the provincial government's decision not to fund Station 20 West has built new bridges in Saskatoon, said Jacqui Barclay, vice-president of the Riversdale community association.

"As an inner-city resident, I have been heartened by the outpouring of support from citizens from all parts of Saskatoon. It has drawn residents from the west side and the east side closer together in the spirit of helping each other."

[email protected]
______________________________________________
This is so unfortunate that the project had to be scaled back so much but def positive that the city is allowing another year for funding to be raised. Hopefully the city will respond with such excitement they will be able to beef up the plans!!!! .....even if we do though I'm sure the bitter taste of the sask parties decision will still be lingering.
__________________
Just be.
     
     
  #3307  
Old Posted Apr 29, 2008, 6:41 AM
kgc087's Avatar
kgc087 kgc087 is offline
Urban Dreamer
 
Join Date: Apr 2008
Location: Saskatoon
Posts: 1,128
So through the words of a friend they told me that global announced that all final and complete phases of Riverlanding will be unveiled for the village in a week...MEANING the possible height addition for the hotel!
__________________
Just be.
     
     
  #3308  
Old Posted Apr 29, 2008, 8:36 PM
kgc087's Avatar
kgc087 kgc087 is offline
Urban Dreamer
 
Join Date: Apr 2008
Location: Saskatoon
Posts: 1,128
__________________
Just be.
     
     
  #3309  
Old Posted Apr 29, 2008, 9:28 PM
Jerry's Avatar
Jerry Jerry is online now
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Quote:
Originally Posted by kgc087 View Post
Thanx for the map kgc087
     
     
  #3310  
Old Posted Apr 29, 2008, 9:50 PM
kgc087's Avatar
kgc087 kgc087 is offline
Urban Dreamer
 
Join Date: Apr 2008
Location: Saskatoon
Posts: 1,128
No prob, it's kind of dissapointing to see that the 25th street extension wont be built this year, but some new suburb development as well the park development along the sw part of circle drive! Does anyone have any plans for the private development in the rosewood area...or is that rosewood being started?
__________________
Just be.
     
     
  #3311  
Old Posted Apr 30, 2008, 12:47 AM
Stewie's Avatar
Stewie Stewie is offline
You are here: X
 
Join Date: Jul 2006
Location: Regina, Saskatchewan
Posts: 129
Reminder: 3rd ave low rise office construction starts Thursday! (old E.Foods site)
     
     
  #3312  
Old Posted Apr 30, 2008, 3:17 AM
Jonitecture's Avatar
Jonitecture Jonitecture is offline
Registered User
 
Join Date: May 2007
Posts: 186
So, why the fuck do they keep tearing houses down on 11th? its starting to piss me off, and if those houses have ugly stucco/vinyl siding with garages on the front (which i bet they will) I am going to shoot somebody.
     
     
  #3313  
Old Posted Apr 30, 2008, 1:19 PM
Jerry's Avatar
Jerry Jerry is online now
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Quote:
Originally Posted by Stewie View Post
Reminder: 3rd ave low rise office construction starts Thursday! (old E.Foods site)
Some shots of the site.



     
     
  #3314  
Old Posted Apr 30, 2008, 3:46 PM
midnightrambler's Avatar
midnightrambler midnightrambler is offline
Registered User
 
Join Date: Apr 2007
Location: Saskatoon
Posts: 264
[/QUOTE]

I love how it's a picture of a parking lot behing a parking lot.
     
     
  #3315  
Old Posted Apr 30, 2008, 4:20 PM
jaysfan99 jaysfan99 is offline
Registered User
 
Join Date: Jul 2006
Posts: 260
I wish we could get a few nice office towers in Saskatoon like the ones below.

http://good-times.webshots.com/album/563263261QeAxWl

I don't know how to post pictures here, so I posted on webshots and included a link above.

Last edited by jaysfan99; Apr 30, 2008 at 4:36 PM.
     
     
  #3316  
Old Posted Apr 30, 2008, 6:27 PM
Jerry's Avatar
Jerry Jerry is online now
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Quote:
Originally Posted by macca View Post
Update on this exciting project:

A closer insepction reveals that there is a permanent (attached to the ground), barbed wire fence with a large gate on the side of the site across form the Rumley, while the rest of the lot has a temporary wire fence.

There was cars parked inside. They appear to be turning it into to some sort of fortified compound.
macca is this the fortified compound you speak of ?

Of course it has to be a parking lot backed by another parking lot with a parking lot adjacent to it. Something midnightrambler will appreciate.






Last edited by Jerry; Apr 30, 2008 at 6:30 PM. Reason: just felt like it
     
     
  #3317  
Old Posted Apr 30, 2008, 7:01 PM
macca's Avatar
macca macca is offline
the heat goes on
 
Join Date: Jul 2006
Location: Saskatoon, SK
Posts: 712
That's the one Jerry. Although I assume it's temporary and somehow related to the construction in the area, it's certainly not a pleasant addition to the neighborhood.
     
     
  #3318  
Old Posted Apr 30, 2008, 7:06 PM
molasses's Avatar
molasses molasses is offline
Pure Phase
 
Join Date: Oct 2006
Location: Saskatoon, Sk.
Posts: 106
ya, considering both the rumley and the A&B building are undergoing major renovations, I'd assume it's likely something to do with one of those.

On a (likely) smaller scale, walking to work yesterday I noticed it looked like someone was putting down a concrete pad for some sort of development on a long time vacant lot across from Roses Auction on Avenue B between 19th and 20th. I haven't heard of anything going there...but it is right down the street from the farmer's market/Riverlanding, so hopefully it's someone doing something interesting.
     
     
  #3319  
Old Posted Apr 30, 2008, 8:32 PM
Jerry's Avatar
Jerry Jerry is online now
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Quote:
Originally Posted by macca View Post
That's the one Jerry. Although I assume it's temporary and somehow related to the construction in the area, it's certainly not a pleasant addition to the neighborhood.
We will just have to keep our eyes open and see what develops.
     
     
  #3320  
Old Posted Apr 30, 2008, 9:35 PM
Stewie's Avatar
Stewie Stewie is offline
You are here: X
 
Join Date: Jul 2006
Location: Regina, Saskatchewan
Posts: 129
...Impark equipment and fence is being removed from Extra Foods parking lot site as I write this...
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 12:58 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.