HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #2881  
Old Posted Mar 10, 2008, 12:16 AM
Ruckus's Avatar
Ruckus Ruckus is offline
working stiff
 
Join Date: Aug 2006
Location: Woodlawn Cemetery
Posts: 2,583
Quote:
Originally Posted by drm310 View Post
Has anyone seen a rather large construction site on Millar Avenue, somewhere around 49th Street? Looks like some kind of industrial/commercial complex, but I didn't see any signs indicating what it was or who's building it.
I think someone posted that development a few pages back, if not, this is the project you likely saw.

How complete is it? Finished by April/May?

Quote:
Opening Spring 2008!
North 48 is centrally located on Millar Avenue, the major north/south connector road in the north business district. This is a perfect office location for professionals to provide services to 690 businesses located in the North Industrial Area. Great location for retailers and service companies who require high ceilings, good parking, and on-site storage. 10 minutes from the airport and 10 minutes from downtown Saskatoon. This building is based on 1,200 sq.ft. modules, which will provide great flexibility in floor plan design. With modernized architecture and abundant natural light, this will provide an exceptional and unique office environment.


Source
     
     
  #2882  
Old Posted Mar 10, 2008, 2:07 AM
joelpiecowye's Avatar
joelpiecowye joelpiecowye is offline
Registered User
 
Join Date: Mar 2007
Location: Saskatoon_Cambridge_Den Haag
Posts: 426
never saw that picture before, no one posted it before
__________________
Its out time to Shine
     
     
  #2883  
Old Posted Mar 10, 2008, 2:39 AM
A4Regina's Avatar
A4Regina A4Regina is offline
Registered User
 
Join Date: Apr 2007
Posts: 465
Quote:
Originally Posted by SASKFTW View Post
I think someone posted that development a few pages back, if not, this is the project you likely saw.

How complete is it? Finished by April/May?





Source
Ewwww!
     
     
  #2884  
Old Posted Mar 10, 2008, 3:11 PM
molasses's Avatar
molasses molasses is offline
Pure Phase
 
Join Date: Oct 2006
Location: Saskatoon, Sk.
Posts: 106
Quote:
Originally Posted by A4Regina View Post
Ewwww!
what an attractive parking lot....
gawd, when will developers learn!
     
     
  #2885  
Old Posted Mar 10, 2008, 4:31 PM
swilley's Avatar
swilley swilley is offline
Saskatchewan's Largest
 
Join Date: Jun 2004
Location: Saskatoon
Posts: 1,007
^What else can be expected for an industrial business complex?
     
     
  #2886  
Old Posted Mar 10, 2008, 4:56 PM
studentview studentview is offline
Registered User
 
Join Date: Jul 2007
Posts: 52
Lake Placid presentation

Mike Lobsinger the head of Lake Placid is speaking on Wednesday in saskatoon about being a big city developer. Should be pretty exciting to hear. anyone going? I know ill be there. I guess he is orignally from Saskatoon, a U of S grad if Im not mistaken.
     
     
  #2887  
Old Posted Mar 10, 2008, 4:57 PM
macca's Avatar
macca macca is offline
the heat goes on
 
Join Date: Jul 2006
Location: Saskatoon, SK
Posts: 712
Quote:
Originally Posted by studentview View Post
Mike Lobsinger the head of Lake Placid is speaking on Wednesday in saskatoon about being a big city developer. Should be pretty exciting to hear. anyone going? I know ill be there. I guess he is orignally from Saskatoon, a U of S grad if Im not mistaken.
When and where?
     
     
  #2888  
Old Posted Mar 10, 2008, 7:47 PM
macca's Avatar
macca macca is offline
the heat goes on
 
Join Date: Jul 2006
Location: Saskatoon, SK
Posts: 712
I found it:

Michael Lobsinger, River Landing developer to speak in Saskatoon

When the City asked for developers to consider an exciting new “Urban Village” concept at River Landing, the call was answered by Michael Lobsinger, a former Saskatoon resident and now a successful real estate developer.



On Wednesday, March 12, Mr. Michael E. Lobsinger, President CEO, Lake Placid Group, will speak to the Saskatoon business community at the 14th Annual Traders Luncheon in support of Junior Achievement of Saskatchewan. He will discuss the challenges and rewards in building in Canada’s hottest markets – Calgary and Saskatoon.



Lunch begins at 12:00 PM at the Sheraton Cavalier in Saskatoon with the speech beginning at 12:30 PM.



Flyer with additional event details.

Ticket order form.



Thanks to Darren Hill, President and CEO of Junior Achievement of Saskatchewan for the heads up on this event.
__________________________________________________


Tickets are $60. I would like to go, but not for 60 bones. I'd like a summary of what he said.
     
     
  #2889  
Old Posted Mar 10, 2008, 10:23 PM
joelpiecowye's Avatar
joelpiecowye joelpiecowye is offline
Registered User
 
Join Date: Mar 2007
Location: Saskatoon_Cambridge_Den Haag
Posts: 426
me too but the price is high, i am sure a summery will be in the newspaper on thursday
__________________
Its out time to Shine
     
     
  #2890  
Old Posted Mar 11, 2008, 4:42 AM
A4Regina's Avatar
A4Regina A4Regina is offline
Registered User
 
Join Date: Apr 2007
Posts: 465
Quote:
Originally Posted by molasses View Post
what an attractive parking lot....
gawd, when will developers learn!
The fact that there is only about 3 cars will probably encourage retailers not to be in this development.
     
     
  #2891  
Old Posted Mar 11, 2008, 10:01 PM
joelpiecowye's Avatar
joelpiecowye joelpiecowye is offline
Registered User
 
Join Date: Mar 2007
Location: Saskatoon_Cambridge_Den Haag
Posts: 426
Calgarian looks back to change Saskatoon skyline
David Parker, Calgary Herald
Published: Tuesday, March 11, 2008
When the premier and mayors of Saskatchewan came calling on Alberta to try to persuade former Saskatchewan residents to participate in its growth, they struck a chord with Michael Lobsinger. The Calgary-based developer re-introduced himself to the mayor of Saskatoon with the result that his company, Lake Placid Group, is building the largest privately funded project in the province spread over a whole block of land in his hometown.

After graduating from its university, Lobsinger worked for many years in the commercial real estate sector in Saskatoon. His business expanded throughout Western Canada, but after moving to Calgary he switched to oil and gas and then formed a high-tech company.

Its expansion into international business meant opening offices in the U.S., Europe, Asia and South America. Wherever he travelled, Lobsinger began acquiring land in a family trust.

His vision was to launch a family-run development company and Lake Placid was born as soon as his sons graduated in business -- Michael from the University of Saskatoon and Richard from St. Mary's in Halifax.

The first project was Centuria Urban Village in Kelowna on land in a run-down area that had been vacant for five years. Lobsinger says it was a tough job but today people are moving into the 151 condo units -- only eight are left to be sold -- in a stunning terraced brick building by BKDI Architects with 1.2 hectares of underground parking.

Centuria on the Park is his first large Calgary development. Designed by IBI Group, it is 14 storeys of high-end condominiums cascading down to a four-storey podium of city homes and town homes to its desirable beltline location across from Central Memorial Park on the corner of 13th Avenue and 2nd Street S.W. The design allows for huge patios ranging from 400 to 1,000 square feet.

The Saskatoon River Landing project is being welcomed by that city as a new downtown meeting place that will convert three acres of prime land along the river bank that have been vacant for far too long into a mixed-use development of three distinct buildings connected through public amenities and architectural features into a landmark urban village concept.

Calgary's S2 Architecture's design of River Landing was inspired by the South Saskatchewan River, incorporating the curvature and movement of the water through the river valley, while accenting its erosion and terracing through the shape and structure of its buildings.

It has a central plaza area around a pool that will become an ice rink in winter with a podium for a huge Christmas tree. The elevated feature is visually tied to the river valley by a waterfall over huge blocks of river rock.

With all approvals expected to be in place within 60 days, work will begin this fall on the 700-stall parking levels that cover the site. Four distinct buildings that all follow the curvature of the central pond will provide a hotel, residential tower and two office towers.

Only two blocks away from Saskatoon's famed Bessborough, the new hotel will be eight storeys high and contain between 120 and 150 rooms, along with banquet and meeting facilities. All vehicle access/egress will be through the underground parkade eliminating significant street traffic, but there will be a hotel drop-off loop along Second Avenue.

Two hundred and thirty units will be available in the 20-storey residential tower, which includes two levels of townhouses while the 130,000-square-foot office component will feature two five-storey towers with retail/restaurant spaces on the main floors.

River Landing will provide a wide variety of amenities unifying downtown Saskatoon with the South Saskatchewan riverfront as well as producing an economic value to the city of around $500 million.

But Lobsinger is not forgetting Calgary while undertaking this massive project.

We are awaiting news of how he will use the King Edward School, which Lake Placid recently purchased and it has also bought the two-storey building on the southeast corner of 4th Street and 13th Avenue -- a great location shared by First Baptist Church, Central Memorial Park and the Sheldon Shumir Centre -- which is going to be renovated for its own head office use.

- - -

United States Ambassador to Canada David Wilkins will be in Calgary on April 1 at the invitation of the American Chamber of Commerce in Canada -- Western Chapter.

Elected to the South Carolina House of Representatives in 1980 where he served for 25 years, he became the 21st U.S. Ambassador to Canada in June 2005.

The event will take place at the Westin Hotel and tickets go on sale March 21. E-mail [email protected].

- - -

I guess people in positions that require continually moving have to get used to severing ties. It's more difficult for us who remain in one place to accept that we may lose touch with some fine people.

This city will surely miss Soemu Horie, Consul General of Japan, when he leaves Calgary at the end of this month after completing his tenure here.

A true gentleman, in the 27 months he has served his government here, he has worked hard to establish the relocated consulate in Calgary and to strengthen the ties between Japan and Canada. We wish him well.

- - -

David Parker appears Tuesday, Thursday and Friday. He can be reached at 830-4622 or e-mail [email protected]
__________________
Its out time to Shine
     
     
  #2892  
Old Posted Mar 11, 2008, 10:02 PM
joelpiecowye's Avatar
joelpiecowye joelpiecowye is offline
Registered User
 
Join Date: Mar 2007
Location: Saskatoon_Cambridge_Den Haag
Posts: 426
Canada's house price growth accelerates in January
Saskatoon, Regina, Halifax top the country
Last Updated: Tuesday, March 11, 2008 | 1:36 PM CT Comments0Recommend12CBC News
Housing price growth accelerated in January for the second straight month, Statistics Canada said Tuesday.

The agency said stronger housing markets in Atlantic Canada and the Prairies pushed contractors' selling prices up by 6.5 per cent between January 2007 and January this year, a faster pace than the 12-month increase of 6.2 per cent seen in December.

Statistics Canada said the December and January accelerations followed 16 months of slowing increases in house prices.

Saskatoon led the nation with an annual price increase of 51.7 per cent, year over year, with higher costs for labour and materials, strong market conditions and higher land demand all cited for the rise.

The year-over-year increase in Regina was 25.9 per cent, unchanged from December.

In Halifax, prices rose 11.4 per cent between January 2007 and January this year, while homebuyers in St. John's saw a 12-month gain of 9.1 per cent.

Windsor, Ont., recorded year-over-year deflation for the 16th month straight, as prices fell 0.9 per cent from January 2007.

Prices posted a 12-month increase of 4.2 per cent in Toronto, and two per cent in Ottawa-Gatineau.
__________________
Its out time to Shine
     
     
  #2893  
Old Posted Mar 11, 2008, 10:03 PM
joelpiecowye's Avatar
joelpiecowye joelpiecowye is offline
Registered User
 
Join Date: Mar 2007
Location: Saskatoon_Cambridge_Den Haag
Posts: 426
Housing Industry Not Surprised By Growth
Written by Jim Mattern - 600 Action News-Local First
Tuesday, 11 March 2008
The Executive Vice President of the Canadian Home Builders Association foresees at least five more years of sustained growth in the housing industry in saskatchewan.

Allan Thomarat says he's not surprised by Stats Can figure which show Saskatchewan leading the country in year over year growth. Figures show housing starts grew by an average 250 per cent over the past five years, with 534 total starts in February alone in Saskatoon and Regina.

Thomarat says with the children of baby boomers now seeking homes, opportunities in the aboriginal community and by creating strong immigration and labour development programs, the growth should be sustained over the next few years. He says the industry is doing its part by providing housing options that provide quality, affordability and choice for new homeowners, students and those on fixed incomes.
__________________
Its out time to Shine
     
     
  #2894  
Old Posted Mar 11, 2008, 10:41 PM
circle33's Avatar
circle33 circle33 is offline
Has been
 
Join Date: Mar 2003
Location: Saskatoon
Posts: 4,937
Quote:
Originally Posted by joelpiecowye's link
... while the 130,000-square-foot office component will feature two five-storey towers
Two five storey towers ?
__________________
signature
     
     
  #2895  
Old Posted Mar 11, 2008, 11:35 PM
Chaps Chaps is offline
Registered User
 
Join Date: Dec 2006
Posts: 825
Quote:
Originally Posted by circle33 View Post
Two five storey towers ?
It looks like a cool development, and the 20 story section will impact the skyline...but calling 5 story's a tower is a bit of a stretch hey?
     
     
  #2896  
Old Posted Mar 12, 2008, 4:22 AM
Ruckus's Avatar
Ruckus Ruckus is offline
working stiff
 
Join Date: Aug 2006
Location: Woodlawn Cemetery
Posts: 2,583
Quote:
Originally Posted by joelpiecowye View Post
Calgarian looks back to change Saskatoon skyline
David Parker, Calgary Herald
Published: Tuesday, March 11, 2008
When the premier and mayors of Saskatchewan came calling on Alberta to try to persuade former Saskatchewan residents to participate in its growth, they struck a chord with Michael Lobsinger. The Calgary-based developer re-introduced himself to the mayor of Saskatoon with the result that his company, Lake Placid Group, is building the largest privately funded project in the province spread over a whole block of land in his hometown.

After graduating from its university, Lobsinger worked for many years in the commercial real estate sector in Saskatoon. His business expanded throughout Western Canada, but after moving to Calgary he switched to oil and gas and then formed a high-tech company.

Its expansion into international business meant opening offices in the U.S., Europe, Asia and South America. Wherever he travelled, Lobsinger began acquiring land in a family trust.

His vision was to launch a family-run development company and Lake Placid was born as soon as his sons graduated in business -- Michael from the University of Saskatoon and Richard from St. Mary's in Halifax.
Those Calgarians
     
     
  #2897  
Old Posted Mar 12, 2008, 4:28 AM
Ruckus's Avatar
Ruckus Ruckus is offline
working stiff
 
Join Date: Aug 2006
Location: Woodlawn Cemetery
Posts: 2,583
Quote:
Originally Posted by circle33 View Post
Two five storey towers ?
Perhaps they decided to break the office component into two separate structures to improve sight lines? There must be some other reasons too.

Hmmmmmm...."130,000-square-foot office component will feature two five-storey towers", I am sure the office component was restricted to like 45,000 sq feet, nothing near 130,000...I bet they are using the site they purchased from Remai to build a 5 storey office building.

So the question now is, are these the two towers realtor's were referring to early in February? C'mon, what a terrible tease!
     
     
  #2898  
Old Posted Mar 12, 2008, 6:01 AM
Ruckus's Avatar
Ruckus Ruckus is offline
working stiff
 
Join Date: Aug 2006
Location: Woodlawn Cemetery
Posts: 2,583
City Aims For 5000 Housing Units Over Ten Years
Written by Jim Mattern - 600 Action News-Local First
Tuesday, 11 March 2008

Mayor Don Atchison says despite a hearing on the Milroy Apartments, city council will continue to hear applications for the conversion of apartments to condominiums.

A group of residents has asked the court to quash the approval by council that allowed Viking Developments to convert Milroy units into condos, last month. The Mayor says council will hear 23 applications for condo conversions at its regular meeting on Monday.

Meanwhile the Mayor says the city wants to continue to build new housing in the city. He says the Planning and Operations Committee discussed an up dated housing business plan at its meeting Tuesday. He says the goal is to build 500 units over the next ten years which works out to about one billion dollars worth of construction. Mayor Atchison says the challenge is to find the money to achieve the goal.

He says that's why the city is pursuing faith based groups, non-profit organizations, NGO's and for-profit groups for funding. The Mayor says the city is leaning toward entry level housing as opposed to affordable housing which tends to be social housing and is the responsibility of federal and provincial governments.

Source
     
     
  #2899  
Old Posted Mar 12, 2008, 6:23 AM
Ruckus's Avatar
Ruckus Ruckus is offline
working stiff
 
Join Date: Aug 2006
Location: Woodlawn Cemetery
Posts: 2,583
Proposed realignment of roads - Holiday Park industrial

Source
     
     
  #2900  
Old Posted Mar 12, 2008, 7:28 PM
midnightrambler's Avatar
midnightrambler midnightrambler is offline
Registered User
 
Join Date: Apr 2007
Location: Saskatoon
Posts: 264
So I guess the method of thinking here is:

2 - Five storey office 'towers' is better than a parking lot.
1 - Ten storey office 'tower' is better than two 5 storey office towers

I can remember when they had input suggestions for River Landing. One of my comments was that I didn't like the office 'tower' component. I am sure the area will be plenty busy enough with a hotel and a large residential complex. Not to mention Midtown less than a block away, and that it is essentially in an area where 3 bridges meet.

I'd prefer to see, likewise with the sentiment of this forum, commercial developments (ie office towers) take place on their own. But I am not going to complain if it is going to have to be 2 five storey office 'towers.'
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.