Oh-Oh! Who could possibly have seen this coming – besides EVERYONE outside of Ottawa’s political structure and OC Transpo, that is.
NEWS FLASH: St. Laurent Station is no need of a lot of repairs. Wow! The study JUST CAME TO LIGHT.
https://www.cbc.ca/news/canada/ottawa/so...-down-its-lrt-tracks-for-weeks-9.7289477
and
https://www.ctvnews.ca/ottawa/article/o-...r-several-weeks-for-rehabilitation-work/
Of course, we all know that the City is HORRIBLE about maintaining its infrastructure. It should be no surprise to hear that the St. Laurent Station has suffered infiltration of salty water for decades. The evidence (for anyone who cared to look) was everywhere within the station. To anyone who has read the media reports of pieces of concrete falling from the ceiling.
Yup, the switch to LRT encouraged the City to do some water-proofing of the top surface (where the buses still travel), but little was done to remediate the actual structure. They simply hung netting to catch the falling concrete chunks.
Opened November 17, 1987, this structure is about 40 years old, and has survived in a very harsh environment with very little upkeep. It should have gone through a full rehabilitation during the conversion to rail. But that would have added cost, so it was left to further decay.
When pieces of concrete fell on the rails, shutting down LRT service for half a day in January, 2024, and then again for 5 days in May of 2024, the City was shocked into action – but not too much action. Minimal work was done to scale any further, obviously, loose ceiling pieces. Oh, and, of course, a study was initiated.
At the very least, since it had done so little before that, the falling concrete should have triggered a full renewal. As it turns out, the City only got around to issuing a Request for Proposal for the work THIS WEEK. Yes, the middle of 2026!
The estimated timeline is to have design done by the end of 2027, and the work done throughout 2028. That work will of course, cause major disruption to the LRT, both Line 1 and Line 3, since the eastern extension is supposed to open “soon”.
So, with an abundance of PLANNING – NOT- the City has delayed doing the work needed until it will have MAXIMAL DISRUPTION on public transit.
It is not just that the St. Laurent Station will be affected. It is the fact that without any maintenance facilities east of St. Laurent, it is doubtful that any of the east-end trains will be able to keep running while St. Laurent is closed. They will be opening the eastern extension just in time to shut it down for an extended period.
My prediction: The work will start on St. Laurent only to find out that things are worse than expected and the whole thing will need a lot more work – meaning a much longer delay.
This is absolutely inexcusable. St Laurent Station should have been reconditioned BEFORE the eastern extension was to be opened. Period. The level of degradation was no secret to anyone – or, as I said above; to anyone not in the political structure of Ottawa’s City Hall, or at OC Transpo.