In this video, we take a look at the damage sustained today to the OCS at Blair station, as well as cover the recovery of LRV 1158 from near Lees and Hurdman, all the way back to the Belfast Yard MSF (Maintenance and Storage Facility).

Video Link
__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #102  
Old Posted Mar 14, 2026, 12:13 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,113
Quote:
Originally Posted by lrt's friend View Post
Precautionary LRT service suspension when freezing rain is predicted.

I-N-S-A-N-E

https://www.ctvnews.ca/ottawa/article/oc...ce-ahead-of-future-freezing-rain-events/
The question posed and the answer given were not about preemptively suspending service because of a forecast.

The question was about the operational decision of continuing to run trains, despite signs that ice accumulation was significant enough to cause problems, leading to infrastructure damage, stranded trains, and even longer delays in resuming service.

Regardless of how many mitigations are put into place ("ice cutter" pantograph inserts, glycol, heat traces, etc.) there will always be the possibility that ice can accumulate faster than all of the measures in place can counter. At that point, would you rather they try to force trains through and possibly blow up the line like they have? Or would it make more sense to pause service before any damage is done?

Clearly CTV has done a poor job of reporting those nuances.
Reply With Quote
     
     
  #103  
Old Posted Mar 14, 2026, 12:42 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Quote:
Originally Posted by DarthVader_1961 View Post
dmu?
Diesel multiple units (like Lines 2 & 4)
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #104  
Old Posted Mar 14, 2026, 2:12 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Berlin also suffered a major tram shutdown in January due to an ice storm. Here is the story about the shutdown and how other European cities are managing ice storms better.

https://www.urban-transport-magazine.com...r-freezing-rain-and-its-systemic-causes/
Reply With Quote
     
     
  #105  
Old Posted Mar 15, 2026, 12:07 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,657
Are we supposed to be excited by this announcement? It didn't take them this long to fix the catenary break at Lees.

Quote:
Line 1 now open from Tunney's Pasture to Tremblay, OC Transpo says
R1 replacement bus service continues between Hurdman and Blair stations

CBC News
Posted: Mar 14, 2026 7:58 PM EDT | Last Updated: 6 minutes ago


Riders on Ottawa's LRT can now take Line 1 as far east as Tremblay, as Ottawa's transit service continues work to restore full-length service.

In a Saturday afternoon alert, OC Transpo announced trains are now running in both directions between Tunney's Pasture and Tremblay stations, while R1 replacement bus service continues between Hurdman and Blair stations.

The partial closure stems from two separate incidents, on Wednesday and Friday, involving "arcing," or sparks flying from the wires of the system's overhead power system.

The issue began during the freezing rain on Wednesday.

"Service may be adjusted as work is completed between Tremblay and St-Laurent stations," said interim OC Transpo general manager Troy Charter. "Additional updates on the status of repairs and service will be provided as they become available."

https://www.cbc.ca/news/canada/ottawa/line-1-open-tunney-s-to-tremblay-9.7129238
Reply With Quote
     
     
  #106  
Old Posted Mar 15, 2026, 1:49 AM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 317
Service is now from Tunney's Pasture to St-Laurent (Westbound Platform). Work continues overnight from St-Laurent to Blair and they anticipate full line service to be restored for start of Sunday morning service at 8am.
__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #107  
Old Posted Mar 15, 2026, 1:34 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,657
Service on Line 1 now fully restored, OC Transpo says
Service between uOttawa to Blair station was suspended due to ongoing issues with overhead power system

CBC News
Posted: Mar 14, 2026 7:58 PM EDT | Last Updated: 11 minutes ago


Full-length service has now been fully restored after "arcing" on the overhead power system forced parts of the line to close for several days.

OC Transpo confirmed the service restoration in a Sunday morning update on social media.

Interim OC Transpo general manager Troy Charter said in a Saturday night memo that riders on Ottawa's LRT could take Line 1 as far east as St-Laurent Station, with work still being done to restore service to Blair Station.

Charter said repairs would be finalized overnight at Blair Station with service fully back up on Sunday morning.

The partial closure stems from two separate incidents, on Wednesday and Friday, involving "arcing," or sparks flying from the wires of the system's overhead power system.

The issue began during the freezing rain on Wednesday.

https://www.cbc.ca/news/canada/ottawa/service-on-line-1-fully-restored-sunday-9.7129238
Reply With Quote
     
     
  #108  
Old Posted Mar 16, 2026, 1:34 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,657
Why do electric flashes keep breaking Ottawa's LRT?
Electric 'arcing' has shut down the LRT before, but OC Transpo thought it had a fix — until last week

Arthur White-Crummey · CBC News
Posted: Mar 16, 2026 4:00 AM EDT | Last Updated: 6 hours ago


Ottawa’s LRT is again falling victim to blazing hot electric flashes that are snapping wires and sparking flashbacks to years of train shutdowns.

OC Transpo has blamed freezing rain. But it's left transit officials wondering why fixes that worked for years, through storm after storm, suddenly failed three times last week.

Here’s what we know about the problem and what OC Transpo is planning to do about it.
What's breaking the wires?

The LRT’s overhead catenary system (OCS) uses hanging wires to feed electric current that powers the trains, and those wires are breaking.

On Wednesday, just before spotting the first break, OC Transpo staff noticed “arcing” on trains between Hurdman and Lees stations — a phenomenon that a bystander captured on camera.

The video shows sparks flying from the area around a train’s pantograph, the arm mounted on its roof that’s supposed to connect to the wire.

<more>

https://www.cbc.ca/news/canada/ottawa/electric-flashes-keep-breaking-ottawa-lrt-9.7128491
Reply With Quote
     
     
  #109  
Old Posted Mar 17, 2026, 3:55 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Apparently, another shutdown in the east end this morning due to an immobile train. Why are our trains breaking down so often while in service?

A video on someone evaluating ION in Kitchener-Waterloo. He talks about the better speed and acceleration of the trains compared to Finch West (which uses the same trains as Ottawa) and I noted that he mentions the speed of the trains on curves, which seems so relevant considering the awful speeds achieved between Lees and St. Laurent.

If you are interested, here is the video. He jerks the camera around a lot which is annoying but the overall message and how this line is leveraging development and anchoring transit is important, compared to the overall failure of the Confederation Line to deliver on its promise. How could Ottawa fail so badly on delivering both reliable and fast service when our investment was so much larger?

Video Link


I know we have major budget problems, but if we want transit back on track, we need to improve reliability big time, and speed up the trains.

Our plan to funnel as many passengers onto trains has backfired. The train-bus connections are generally awful, and we have created an overall transit network that makes passengers transfer too many times. It is almost impossible to recover transfer wait times. Too many trips are 25%, 50% or even 100% slower than before the Confederation Line. Unacceptable.

We need some express services that cross the city to speed up overall trips, reduce the number of transfers and create some redundancy so that we reduce the negative affects when Line 1 goes down. There need to be more efficient parallel services, that are lacking east of downtown, particularly between Lees and Hurdman. There used to be cross-town services that no longer exist because there is no efficient way to move a bus between Lees and Hurdman or anywhere nearby. This was a major loss for the overall network. Bus-train-bus over such a short distance is so inefficient for the rider. This could have been fixed if we had built the planned bridge between Nicholas and Lees to the Hospital Link, but nope. That would have been a game changer for parallel bus routes and potentially for R1 service.
Reply With Quote
     
     
  #110  
Old Posted Mar 18, 2026, 4:45 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,657
3 LRT cars are sitting idle in the west end. Why can't they be redeployed?
Line 1 still isn't operating with full fleet weeks after bearing issue emerged

Guy Quenneville · CBC News
Posted: Mar 17, 2026 2:31 PM EDT | Last Updated: 4 minutes ago




The head of Ottawa's transit committee is asking whether light rail cars currently devoted to OC Transpo's yet-to-open western extension could be redeployed to help bolster service that's been depleted elsewhere.

But officials say doing that would be more complicated than it sounds.

At last Thursday's transit committee meeting, Stittsville Coun. Glen Gower said several people have asked him about three train cars parked west of Moodie station, the last stop on the Line 1 western extension that will also include a spur to Algonquin College.

At last report, the contractor for that extension is expected to hand it over to the city by the end of June 2027.

Gower asked whether the three cars couldn't be put to work on Line 1 from Tunney's Pasture to Blair, which continues to operate with less than a full fleet of train cars due to a wheel assembly issue detected at the start of 2026.

Line 1 needs 26 cars to provide regular double-car service. For weeks, though, only 21 cars have been available as a stubborn bearing issue keeps most of them out of commission.

"It is frustrating to look at the number of trains week to week and not see that number change," Gower said.

But the shortage has not had entirely negative effects. It's forced Line 1 to run single-car trains and resulted in crowding at some stations during peak periods, but it has also meant trains are running at a slightly increased frequency.

Troy Charter, the interim general manager for OC Transpo, said he knows people are seeing the trains near Moodie. They're currently in a storage facility located west of the station.

As Charter went on to explain at the meeting, those trains had to be taken apart to be delivered there, and disassembling and reassembling them again would be "a considerable undertaking."

"It's not just as simple as loading [them] on a flatbed and dropping [them] on the track," he said.

Besides, those trains are needed where they are, Charter added.

While they haven't been heavily used, "you're going to start to see movements in the west and on those [cars]" in the coming days and weeks.

At a news conference following the meeting, CBC asked for more details on why the three trains are needed in the west end.

Charter said they're required for testing, and to verify that the track is set up properly.

Adding the three trains to Line 1 now could provide "temporary relief" but could also cause "other impacts" to the western extension, Charter said.

Gower said the Moodie trains are a good example of the difficult trade-offs OC Transpo has to wrestle with every day.

"If there was a viable way to get them to the east end, if they'd make a meaningful difference to our day-to-day service for customers, I'm sure it's something that council would support and OC Transpo would recommend to us," Gower said.

"But at this time, those trains ... aren't going to have a significant impact, and the downside to potentially delaying the timeline for getting the western leg up and running next year outweighs the small benefit that they might have in the east."

With files from Liam Baker, Félix Desroches, Jayden Dill and Arthur White-Crummey

https://www.cbc.ca/news/canada/ottawa/lrt-cars-idle-single-car-service-9.7131390
Reply With Quote
     
     
  #111  
Old Posted Mar 18, 2026, 5:18 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,023
And 3 out of 56 train cars isn't going to make a difference.
Reply With Quote
     
     
  #112  
Old Posted Mar 18, 2026, 5:40 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,690
With all the tracks in place it shouldn't be much of an issue towing the trains from west to east.
Reply With Quote
     
     
  #113  
Old Posted Mar 18, 2026, 5:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,023
Quote:
Originally Posted by Kitchissippi View Post
With all the tracks in place it shouldn't be much of an issue towing the trains from west to east.
Right, with Big Red now part of the team, maybe not!

Video Link


Seriously though, I assume there would be some major legal negotiations with EW Connectors to allow Big Red on the tracks before the handover.
Reply With Quote
     
     
  #114  
Old Posted Mar 19, 2026, 12:23 PM
Catenary Catenary is online now
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by J.OT13 View Post
And 3 out of 56 train cars isn't going to make a difference.
Exactly - there's no shortage of LRVs at Belfast Yard already. Why would adding 3 more that likely have the same issue make a difference?
Reply With Quote
     
     
  #115  
Old Posted Mar 27, 2026, 12:04 AM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 317


Over the past two months, O-Train Line 1 has generally met its target of 15 trains in service during peak periods.

However, over the past week, service levels have declined, with between 12 and 14 trains operating during AM and PM peaks. This reduction may impact frequency and overall capacity for riders.

We understand there are ongoing technical concerns related to wheel bearings and axle components. While no official announcement has been made, these issues are being closely monitored and could influence near-term service decisions.

We will continue to follow developments and provide updates as more information becomes available... ...

...

https://tracker.railfans.ca
https://bsky.app/profile/railfans.ca/post/3mhypi3nx3s2e
__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #116  
Old Posted Mar 30, 2026, 6:32 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,598
This quote from the Mayor definitely doesn't inspire confidence:

“We know we’ve had some challenges with the spalling issues on Line 1, and of course, we have to have contingency plans in place,” Sutcliffe told reporters during a media conference to introduce new OC Transpo general manager Rick Leary.

“There’s a limit of 100,000 km on every vehicle, so, if we reach a point sometime in the future where it’s no longer possible to have enough vehicles in order to provide the service, we may have to look, for a period of time, at using R1. We have to have those contingency plans in place; we plan for all kinds of different eventualities, many of them never come to pass.”

It doesn't look like the shutdown would be for the purpose of implementing a fix the issues. It would be due to a lack of trains. It's unbelievable that after all of this time we are still at that point - limping along with substandard service and no long-term fix for the issue.
Reply With Quote
     
     
  #117  
Old Posted Mar 30, 2026, 6:40 PM
OttawaSkyriseLover OttawaSkyriseLover is offline
Registered User
 
Join Date: Mar 2026
Posts: 22
Quote:
Originally Posted by phil235 View Post
This quote from the Mayor definitely doesn't inspire confidence:

“We know we’ve had some challenges with the spalling issues on Line 1, and of course, we have to have contingency plans in place,” Sutcliffe told reporters during a media conference to introduce new OC Transpo general manager Rick Leary.

“There’s a limit of 100,000 km on every vehicle, so, if we reach a point sometime in the future where it’s no longer possible to have enough vehicles in order to provide the service, we may have to look, for a period of time, at using R1. We have to have those contingency plans in place; we plan for all kinds of different eventualities, many of them never come to pass.”

It doesn't look like the shutdown would be for the purpose of implementing a fix the issues. It would be due to a lack of trains. It's unbelievable that after all of this time we are still at that point - limping along with substandard service and no long-term fix for the issue.

We had a chance to elect a transit-oriented mayor but Ottawa got caught up in identity politics. Shameful. Let's see how the next election goes.
Reply With Quote
     
     
  #118  
Old Posted Mar 30, 2026, 7:41 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,598
Quote:
Originally Posted by OttawaSkyriseLover View Post
We had a chance to elect a transit-oriented mayor but Ottawa got caught up in identity politics. Shameful. Let's see how the next election goes.
Not sure I follow. I get that he is not transit oriented (and seemed to enjoy using a number of car-centric dog whistles), but what do you mean about identity politics?
Reply With Quote
     
     
  #119  
Old Posted Mar 30, 2026, 7:43 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
This P3 project has been an absolute disaster.

Because of legalities, there is little transparency on what is happening and there is no transparency on how to fix the situation.

Public transit in Ottawa has been degrading ever since Line 1 opened in September 2019 and taxpayers have lost confidence.

We have so little real information, it is impossible to even conceive of a solution. Is there one? Even if there is one, does anybody want to spend the money to implement the solution?

I suspect that all those involved in the P3 are taking blood bath on this project. Every fix just increases the losses.

Clearly, this is impacting the city budget. If everything had worked properly, ridership would be bounding upward, even after a temporary dip from Covid. We have failure after failure, followed by a calm spell, but then more failures.

The big losers are Ottawa transit riders. There is so little hope on the horizon. Each news story paints a bleaker picture for the future.
Reply With Quote
     
     
  #120  
Old Posted Mar 30, 2026, 8:07 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,598
Quote:
Originally Posted by lrt's friend View Post
This P3 project has been an absolute disaster.

Because of legalities, there is little transparency on what is happening and there is no transparency on how to fix the situation.

Public transit in Ottawa has been degrading ever since Line 1 opened in September 2019 and taxpayers have lost confidence.

We have so little real information, it is impossible to even conceive of a solution. Is there one? Even if there is one, does anybody want to spend the money to implement the solution?

I suspect that all those involved in the P3 are taking blood bath on this project. Every fix just increases the losses.

Clearly, this is impacting the city budget. If everything had worked properly, ridership would be bounding upward, even after a temporary dip from Covid. We have failure after failure, followed by a calm spell, but then more failures.

The big losers are Ottawa transit riders. There is so little hope on the horizon. Each news story paints a bleaker picture for the future.
I'm not a fan of P3s, but there is no reason that they have to be so opaque. That is a choice that the City is making. They could easily be sharing more information about the status of the system.

As for there being no hope, not sure I agree. The path for a mayoral candidate who has a plan for transit and is willing to implement a specific transit levy is wide open. It would be crazy if that isn't the number one issue in the next election.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:37 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.