HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 2, 2026, 8:46 PM
Instakat Instakat is online now
Registered User
 
Join Date: Jan 2026
Posts: 4
Might be a silly question, but will the LCC terminus be designed for future extension? In the same way the track at KG Station will allow for connection to the SLS extension without interrupting operations.

I'm not aware of any plans to build out the expo line further east than Langley, but they'll need to have some track for switching anyway...
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:15 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.