  #361  
Old Posted Apr 1, 2026, 4:03 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,847
Quote:
Originally Posted by dharper View Post
Has the Clayton Clipper restarted yet?
Yes, it's on it's 6th segment from the station.
Reply With Quote
     
     
  #362  
Old Posted Apr 1, 2026, 5:04 PM
surrey surrey is offline
Registered User
 
Join Date: Jan 2025
Posts: 50
Quote:
Originally Posted by Lexus View Post
We are approaching 2 milestones:

1: Langley Luncher lunched from the Hillcrest-184 St. is about to connect to Clayton Station - making it the first two stations connected with a guideway. Only 5 spans left.

2: Fleetwood Flyer that lunched at Bakerview 166St. Station soon to connect to 152 St. Station. Only 6 spans left.

Surrey Sprinter is now at 148 St. Right and the border of Green Timbers.

https://youtu.be/icc8nTbSXNs?si=sOOKrqsGWqXDJlLC

• Video Link
I think you meant fleetwood flyer will soon connect to 160th station....once it gets to 152 it will have completed its job.
Reply With Quote
     
     
  #363  
Old Posted Apr 1, 2026, 7:35 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,778
Quote:
Traffic Update: Overnight closures of Highway 15 at Fraser Highway

March 30, 2026

Surrey Langley SkyTrain construction is underway. To support guideway work over Highway 15, a section of Highway 15 south of Fraser Highway will be closed for four consecutive nights, from 12 a.m. to 4 a.m., April 14–17, 2026. The first closure begins at 12:00 a.m. on April 14.

A full road closure is required to safely lift and install steel beams (box girders) above the road. This work will take place overnight to minimize impacts on traffic during peak periods.
https://surreylangleyskytrain.gov.bc.ca/...ht-Closures-Highway15-Fraser-Highway.pdf

Is that near the OMC5 site?
If so, the steel girders could be for a branch track off the mainline.
Reply With Quote
     
     
  #364  
Old Posted Apr 1, 2026, 8:39 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,208
Quote:
Originally Posted by officedweller View Post
https://surreylangleyskytrain.gov.bc.ca/...ht-Closures-Highway15-Fraser-Highway.pdf

Is that near the OMC5 site?
If so, the steel girders could be for a branch track off the mainline.
Should be for the mainline over Hwy 15.

Live view here: https://www.drivebc.ca/cameras/94?pan=-122.734876%2C49.13825400000002&zoom=13.948819466868986
Reply With Quote
     
     
  #365  
Old Posted Apr 1, 2026, 8:47 PM
Stainer Stainer is offline
Registered User
 
Join Date: Jan 2024
Posts: 57
Quote:
Originally Posted by madog222 View Post
I'm going to try and get out there the night they lift that, I think it would look pretty neat!
Reply With Quote
     
     
  #366  
Old Posted Apr 1, 2026, 8:57 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,208
Quote:
Originally Posted by Stainer View Post
I'm going to try and get out there the night they lift that, I think it would look pretty neat!
I went down for the first girder lift on the Broadway line, it was neat. Mind you I live a 10min walk away so I sort of had to.

Be prepared for a lot of waiting around!
Reply With Quote
     
     
  #367  
Old Posted Apr 1, 2026, 9:53 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,784
How many beams are getting installed? I see two on the highway cam.



https://www.drivebc.ca/cameras/86?pan=-122.734876%2C49.13825400000002&zoom=13.948819466868986
Reply With Quote
     
     
  #368  
Old Posted Apr 1, 2026, 10:17 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by officedweller View Post
https://surreylangleyskytrain.gov.bc.ca/...ht-Closures-Highway15-Fraser-Highway.pdf

Is that near the OMC5 site?
If so, the steel girders could be for a branch track off the mainline.
Yes, OMC5 is the south east corner of Fraser Hwy and Hwy 15. From a Daily Hive article (that has probably been quoted on here before)


Site of SkyTrain’s future OMC5 at 17916 Fraser Highway, Surrey. (Google Maps/Daily Hive)
Reply With Quote
     
     
  #369  
Old Posted Apr 1, 2026, 11:17 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,778
Thanks - the traffic cam shows straight segments, so presumably just over Hwy 15, allowing for highway widening in future?
The OMC4 guideway link are large curved steel box girders, so I was think similar here. Hope they build the branch switches, etc. now to mjnimize future disruption..
Reply With Quote
     
     
  #370  
Old Posted Apr 1, 2026, 11:23 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 955
I guess Clayton Clipper will just "hop" over these segments as it carries through the Serpentine Valley?
Reply With Quote
     
     
  #371  
Old Posted Apr 1, 2026, 11:38 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,784
Only graphic related to OMC5 that I could find

Quote:
The City plans to extend 72 Ave from Hwy 15 to Fraser Hwy as illustrated in image.

The Province plans to build a SkyTrain Operations and Maintenance Centre 5 (OMC5) at 17916 Fraser Highway. This will be the fifth OMC location for SkyTrain’s main network of the Expo and Millennium lines operated by TransLink subsidiary BC Rapid Transit Company (BCRTC).

The City is in discussions with the Province regarding the integration and timing of delivering 72 Avenue corridor between Hwy 15 and Fraser Highway.


https://www.surrey.ca/about-surrey/capital-projects/72-avenue-improvements-extensions
Reply With Quote
     
     
  #372  
Old Posted Apr 1, 2026, 11:45 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,208
The steel isn’t required based on the length of the span, it’s a shorter span than the arched concrete spans on the Millennium Line over Hwy 1 and Brunnette Ave.
I’m guessing the choice to use steel was made to reduce the weight of the guideway to help deal with the challenging ground condition.
Based on the column design further west of Hwy 15 it looks like the a length of the guideway through the Serpentine Valley will be steel box girders, not just the span over Hwy 15. It’s back to tulip columns for the concrete box girder guideway beside the golf course.


Quote:
Originally Posted by officedweller View Post
Thanks - the traffic cam shows straight segments, so presumably just over Hwy 15, allowing for highway widening in future?
The OMC4 guideway link are large curved steel box girders, so I was think similar here. Hope they build the branch switches, etc. now to mjnimize future disruption..
OMC4 has a rail yard and significant elevation between it and the guideway, the tie in for OMC5 here will be much less substantial. They may even be able to drop straight down to grade like at the Canada Line yard.

Last edited by madog222; Apr 2, 2026 at 12:05 AM.
Reply With Quote
     
     
  #373  
Old Posted Apr 2, 2026, 1:47 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,784
Around the 10 minute mark you can see the two sections of the girder before they were joined

• Video Link
Reply With Quote
     
     
  #374  
Old Posted Apr 6, 2026, 4:45 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,847
2026, Apr 5

Untitled by Lexus LX 700, on Flickr

Untitled by Lexus LX 700, on Flickr

Untitled by Lexus LX 700, on Flickr

Surrey Sprinter @ 148St entering Greentimbers

Untitled by Lexus LX 700, on Flickr

Fleetwood Flyer, only 5 spans away from Fleetwood Station

Untitled by Lexus LX 700, on Flickr

Going EB down the hill towards HWY 15 they put that 🞵🞵🞵🞵🞵🞵🞵 coyote on the ground, and I didn't realize it was a fake one - for a brief moment it looked like a real one and I almost 🞵🞵🞵🞵 my pants, and I almost swerved into traffic—it was actually pretty dangerous.

Untitled by Lexus LX 700, on Flickr

There are now 5 or 6 steel girders, in this photo they connected 3 of them to make one very long girder. That would be quite an operation to lift it in place.

Untitled by Lexus LX 700, on Flickr

Future OMC 5

Untitled by Lexus LX 700, on Flickr

Most of the columns between East oh HWY 15 and Hillcrest-184 St Station are completed.

Untitled by Lexus LX 700, on Flickr

Only 4 spans left to install for Langley Launcher to connect to Clayton Station

Untitled by Lexus LX 700, on Flickr
Reply With Quote
     
     
  #375  
Old Posted Apr 6, 2026, 5:02 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,847
I went back a few pages to compare the progress, and I estimate that by the end of August the Surrey Sprinter will be west of Green Timbers Station. The Fleetwood Flyer will likely complete its journey at 152 Street Station, and the Langley Launcher will be somewhere east of Willowbrook Station.

The hardest to predict is the Clayton Clipper, since it had issues in the past and still seems to be moving quite slowly. It also has to cross Highway 15 over those steel girders, which may speed up the process somewhat, but I hope it will at least cross Highway 15 by that time.
Reply With Quote
     
     
  #376  
Old Posted Apr 7, 2026, 2:04 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,778
Quote:
Originally Posted by Lexus View Post
2026, Apr 5
Most of the columns between East oh HWY 15 and Hillcrest-184 St Station are completed.

Untitled by Lexus LX 700, on Flickr
Great shots, thanks!
What's happening in the distance in this shot?
Are those bents to cross to the other side of the street or are they bents for a station (or both)?
It looks like there is a huge elevation difference between the top of the last column and the height of the bent.
Reply With Quote
     
     
  #377  
Old Posted Apr 7, 2026, 2:14 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,784
^^ I think in the video above it's around the 9:50 mark so I guess it's the sidetrack near the OMC?

Maybe they are moving something which might explain the weird placement of the forms.
Reply With Quote
     
     
  #378  
Old Posted Apr 7, 2026, 2:40 AM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,847
Quote:
Originally Posted by officedweller View Post
Great shots, thanks!
What's happening in the distance in this shot?
Are those bents to cross to the other side of the street or are they bents for a station (or both)?
It looks like there is a huge elevation difference between the top of the last column and the height of the bent.
Guideway is shifting from centre to the south, it will also connect to OMC5.
Reply With Quote
     
     
  #379  
Old Posted Apr 7, 2026, 2:48 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,208
Also refer to the diagram in jolly's post at the top of this page.
Reply With Quote
     
     
  #380  
Old Posted Apr 7, 2026, 5:11 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,778
Quote:
Originally Posted by Lexus View Post
Guideway is shifting from centre to the south, it will also connect to OMC5.
Thanks!
Could be that the form was being lifted into place.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:07 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.