The railing has been installed for long stretches, I think we can assume it will be installed along the entire length of the guideway.
Reply With Quote
     
     
  #342  
Old Posted Mar 1, 2026, 10:26 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 769
The guideway will have the standard walkway in the middle with handrail running the full length, for emergency passenger evacuation and for staff to access stalled trains. Beyond that, staff are not allowed to step off of that walkway into the actual track unless there is fall protection in place or walkways on both sides (such as at track switches).

The existing Expo and Millennium guideways have these fall protection railings installed around areas like electrical substation connections and sensor equipment, but for anywhere else that staff need track-level access they need to bring and install those temporary fall protection clips. My guess is that it's easy and cheap enough to just install it permanently at construction time here to save hassle in the future. (Although interestingly we have not seen this installed for the elevated portion of the Broadway extension.)

Visually, it shouldn't impact the view from the train. It's not especially noticeable in the spots where it already exists on the system, and it's not much higher than the noise dampening panels used along the Expo Line.
Reply With Quote
     
     
  #343  
Old Posted Mar 1, 2026, 10:50 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,215
Quote:
Originally Posted by dpogue View Post
Although interestingly we have not seen this installed for the elevated portion of the Broadway extension.
FWIW noise dampening panels are being installed along the south side of the guideway for what looks to be the entire length. I don't recall seeing anything installed on the north side so far.
Reply With Quote
     
     
  #344  
Old Posted Mar 2, 2026, 1:33 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,115
Quote:
Originally Posted by madog222 View Post
The railing has been installed for long stretches, I think we can assume it will be installed along the entire length of the guideway.
God DAMN that's gonna be ugly.
Reply With Quote
     
     
  #345  
Old Posted Mar 2, 2026, 1:46 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,026
It’s funny what bothers some people, but doesn’t bother me.

These railings are on that list. Looks like they are low enough not to obstruct the view from the train itself.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #346  
Old Posted Mar 2, 2026, 6:22 AM
Stainer Stainer is offline
Registered User
 
Join Date: Jan 2024
Posts: 57
To be fair it could also just be there to provide an extra layer of safety during construction. There's going to be a lot of workers up there over the next few years and having those railings probably removes the requirement to be tied in.
Reply With Quote
     
     
  #347  
Old Posted Mar 2, 2026, 8:26 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,115
Quote:
It’s funny what bothers some people, but doesn’t bother me
It's the creeping What-if Boogeyman. The fear is that someone (an employee, a tagger, an urbexer or someone leaning out a train with a frozen door) falls off the edge and then sues BCRTC for "well, if there was a handrail I might of not done that" regardless of the obvious "what the hell were you even doing??" Odds are low, but WorkSafe exists purely to make a paycheck finding ways to say something might happen otherwise, no matter how stupid the scenario.
Expo started off with no handrails, then had them welded in at key locations (normally in the stations). This was followed by the Millennium Line with handrails in key locations such as switches and separated middle handrails on the guideway. The Evergreen Extension made that a near-continuous handrail the entire length of the guideway, now it's (at the least) handrails on the sides (presumably) the entire length.

Aesthetically it spoils the view. Yes, I'm dying on that hill. That's not priority when you just want to build a rail extension but when you are building an above-grade metro, the more it sticks out, the uglier it looks. Likewise unless people got stupider in the last 40 years (they didn't. People just got more paranoid) I don't see the need.


[ramble]
I also see it as a cash grab. The NDP will throw money at you if in exchange you can make them show all these (union) jobs they created as part of the construction because they will never shut up about all these jobs. Look at the jobs! We're building a better BC! Look at all the work that needs to be done! Look at all this money you can make!* [/ramble]


*I'm pointing out my bias here as someone who never went into the trades 20 years ago and thus without a Red Seal has never been eligible for any of the major provincial projects and employment opportunities because a piece of paper says I'm not a pipefitter, welder, general mechanic, electrician, general contractor, HVAC technician, foreman, framer or general laborer. This province 🞵🞵🞵🞵🞵.[/ramble]

Last edited by MIPS; Mar 2, 2026 at 9:00 PM.
Reply With Quote
     
     
  #348  
Old Posted Mar 2, 2026, 8:46 PM
Instakat Instakat is online now
Registered User
 
Join Date: Jan 2026
Posts: 4
Might be a silly question, but will the LCC terminus be designed for future extension? In the same way the track at KG Station will allow for connection to the SLS extension without interrupting operations.

I'm not aware of any plans to build out the expo line further east than Langley, but they'll need to have some track for switching anyway...
Reply With Quote
     
     
  #349  
Old Posted Mar 2, 2026, 9:03 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,329
Quote:
Originally Posted by MIPS View Post
.

Asthetically it spoils the view. Yes, that's not priority when you just want to build a rail extension but when you are building an above-grade metro, the more it sticks out, the uglier it looks.
I also see it as a cash grab. The NDP will throw money at you if in exchange you can make them show all these (union) jobs they created as part of the construction. They can shrug off the budget issues later.
It's a huge concrete bridge. With railings, it's a huge concrete bridge with railings. Those people who don't like huge concrete bridges probably won't like it any more or less with railings. I'd be surprised if many people who find the guideway aesthetically acceptable will care that it will have railings.

Your take on the NDP claiming more construction jobs because they added railings seems weird - the project website listing of benefits doesn't mention construction jobs, only improving transit access to anticipated new permanent jobs that will be developed as part of the TOD policies. Even the business case concentrated on the long term benefits to travel reliability and didn't mention construction employment.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #350  
Old Posted Mar 2, 2026, 9:14 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,807
Quote:
Originally Posted by Instakat View Post
Might be a silly question, but will the LCC terminus be designed for future extension? In the same way the track at KG Station will allow for connection to the SLS extension without interrupting operations.

I'm not aware of any plans to build out the expo line further east than Langley, but they'll need to have some track for switching anyway...
I mean there's one section of guideway past the station so I guess the option is always there.

https://engage.gov.bc.ca/app/uploads/sit...ntre-Station-Boards-November2024-WEB.pdf
Reply With Quote
     
     
  #351  
Old Posted Mar 2, 2026, 11:25 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,795
My understanding is that it'll be designed more like LaFarge Lake - Douglas, with the switches before the station with less than a full train length of tail track - but not like LaFarge Lake - Douglas which seems to come really low to the ground.
As the terminus is a centre platform, a train can be stored at the platform.

LaFarge Lake -Douglas:

https://www.google.com/maps/search/lafar..._ep=EgoyMDI2MDIyNS4wIKXMDSoASAFQAw%3D%3D

Last edited by officedweller; Mar 3, 2026 at 1:35 AM.
Reply With Quote
     
     
  #352  
Old Posted Mar 3, 2026, 1:14 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,115
-snip-

[bitter grumbling]

Last edited by MIPS; Mar 3, 2026 at 1:33 AM.
Reply With Quote
     
     
  #353  
Old Posted Mar 7, 2026, 5:32 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,807
Quote:
Steel guideway spans across Highway 15 on Fraser Highway and over the Pacific Highway PPS are expected to be installed in spring 2026
Quote:
Track installation near 68 Avenue will start in spring 2026. This will include deliveries of rail, lifting rail
onto the elevated guideway, rail installation, welding, grinding, and concrete pouring activities. Expect
increased worker activity and equipment use on the elevated guideway, and intermittent, temporary lane
closures in the area during rail delivery and concrete pours.
Quote:
More than 1,500 of 4,400 concrete segments have
been produced.
https://surreylangleyskytrain.gov.bc.ca/...-Construction-Advisory-Winter-2026-1.pdf
Reply With Quote
     
     
  #354  
Old Posted Mar 12, 2026, 9:39 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,807
New videos

• Video Link


• Video Link
Reply With Quote
     
     
  #355  
Old Posted Mar 25, 2026, 12:39 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,807
Drone footage of 96th Avenue to 84th Avenue from very far up

• Video Link
Reply With Quote
     
     
  #356  
Old Posted Mar 26, 2026, 1:27 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,795
From the project twitter:

March 18, 2026


Here is an aerial view of Bakerview-166 Street Station.
The Fleetwood Flyer has finished building the elevated guideway in this area and is moving west towards 152 Street Station

https://x.com/SLSkyTrain/status/2034298944805625957

March 20, 2026


https://x.com/SLSkyTrain/status/2035056338078687563
You may have noticed wildlife in some unusual places along the Project alignment.
Decoy wildlife have been placed throughout the Project area as part of our environmental measures.
These fake animals prevent bird nesting on structures during construction!



https://x.com/SLSkyTrain/status/2035056338078687563



March 24, 2026


https://x.com/SLSkyTrain/status/2036488362027053094
Reply With Quote
     
     
  #357  
Old Posted Mar 26, 2026, 2:02 AM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,257
I hope they keep those wildlife decoys somewhere after construction, those are fun.
Reply With Quote
     
     
  #358  
Old Posted Mar 26, 2026, 3:48 AM
dharper dharper is offline
Registered User
 
Join Date: Jun 2010
Location: North Surrey
Posts: 294
Last week where the Willowbrook Station is going, I saw 3 or 4 hawk kites flying above the station. At a glace they appeared quite realistic.
Reply With Quote
     
     
  #359  
Old Posted Apr 1, 2026, 1:39 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,852
We are approaching 2 milestones:

1: Langley Luncher lunched from the Hillcrest-184 St. is about to connect to Clayton Station - making it the first two stations connected with a guideway. Only 5 spans left.

2: Fleetwood Flyer that lunched at Bakerview 166St. Station soon to connect to 152 St. Station. Only 6 spans left.

Surrey Sprinter is now at 148 St. Right and the border of Green Timbers.

https://youtu.be/icc8nTbSXNs?si=sOOKrqsGWqXDJlLC

• Video Link

Last edited by Lexus; Apr 1, 2026 at 3:22 PM.
Reply With Quote
     
     
  #360  
Old Posted Apr 1, 2026, 3:32 PM
dharper dharper is offline
Registered User
 
Join Date: Jun 2010
Location: North Surrey
Posts: 294
Has the Clayton Clipper restarted yet?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.