HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #13  
Old Posted Jan 10, 2026, 6:46 AM
truebaru truebaru is offline
Registered User
 
Join Date: May 2022
Posts: 27
Quote:
Originally Posted by PhillyPDX View Post
Makes me wonder, what is the cost to seismically upgrade the current bridge? I haven't followed closely enough to know, how feasible that is.
Looking through project documents, there is shockingly little about this. If they formally studied the costs of a seismic retrofit, it's not readily accessible on IBR program website.

Some of the documents briefly mention that retrofitting is "cost prohibitive" but without more details it feels like they dismissed that from the beginning without studying it thoroughly.

Ultimately the big issue in my opinion is that the IBR's purpose and need statement does not include reducing costs. In other words, cost was not considered in the "purpose" and "need". Even though these costs may give us yet another "no build".
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.