  #3261  
Old Posted Nov 17, 2025, 11:42 PM
osirisboy's Avatar
osirisboy osirisboy is online now
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
Quote:
Originally Posted by Changing City View Post
It's the most obvious explanation. With a few well-known exceptions Downtown, most long-term vacant sites are former gas station locations. There was an article about it over a decade ago, and nothing much has changed (and some of the sites are still vacant!)

Patrick Johnson wrote a detailed explanation in 2013 of why some sites can be developed relatively quickly, and other take years, or decades. The era that the station was built partly explains the differences. If it was originally a single walled tank, there will almost certainly be deep deposits of hydrocarbons, even if the tank was replaced. Sometimes developers discover there had been a much earlier gas tank that had been decommissioned, and a different use had replaced it. Qualex Landmark sought compensation for a site in Dunbar that had seen the gas station removed years earlier.

Some former stations don’t even start remediation for many years after closing, like the one on Broadway. I don’t think anything has happened in 5 years

Also, I thought that you could truck the contaminated soil to a place in Alberta and the cost is around 100,000 for a typical site. So seems crazy to let a site sit for decades. Too bad the province doesn’t have something to help expedite it

Last edited by osirisboy; Nov 17, 2025 at 11:58 PM.
Reply With Quote
     
     
  #3262  
Old Posted Nov 18, 2025, 1:25 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,617
Quote:
Originally Posted by osirisboy View Post
Also, I thought that you could truck the contaminated soil to a place in Alberta and the cost is around 100,000 for a typical site. So seems crazy to let a site sit for decades. Too bad the province doesn’t have something to help expedite it
Yeah, Swan Hills Treatment Centre (SHTC).
https://www.shtc.ca/

But may be slated to close in early 2026:

https://hazmatmag.com/2024/02/09/swan-hills-treatment-center-closure/
Reply With Quote
     
     
  #3263  
Old Posted Nov 18, 2025, 2:19 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,640
2023 article on increased testing/requirements for waste soils in BC

Quote:
Recent revisions to the British Columbia's Contaminated Sites Regulation are creating headaches for developers, and could end up proving costly for both homebuyers and the environment.

Stage 14 amendments to the regulation change how the province expects developers to handle soils from Schedule 2 sites, which include a range of activity from snow dumping and leather tanning to petrochemical processing and storage. Properties actually or likely affected by the migration of contaminants from adjacent properties are also included.

But consultants say the reach is even broader than that, affecting land assemblies where a portion of the site may have been subject to a Schedule 2 use but other portions – especially those uphill from the affected portion and typically unaffected by the migration of contaminants – were not.
https://www.biv.com/news/economy-law-pol...ke-costs-waste-soils-critics-say-8271375
Reply With Quote
     
     
  #3264  
Old Posted Nov 18, 2025, 2:34 AM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,182
Quote:
Originally Posted by osirisboy View Post
Some former stations don’t even start remediation for many years after closing, like the one on Broadway. I don’t think anything has happened in 5 years

Also, I thought that you could truck the contaminated soil to a place in Alberta and the cost is around 100,000 for a typical site. So seems crazy to let a site sit for decades. Too bad the province doesn’t have something to help expedite it
It's not clear exactly when 1398 W Broadway was sold, but it was one of five Esso gas stations sold by 7-11 by 2018. They sold off four more in 2018, including 1795 W Broadway, the Esso station that's still open (for now) at Burrard.

It was closed in 2021. It's possible there's remediation taking place, because some of the methods are less obvious than others. It's equally possible that there's no significant contamination, but it wasn't worth carrying on running the operation, with another offering the same brand of gasoline in the same ownership only 4 blocks away. Gasoline sales volumes in BC fell from a peak in 2017 to significantly less in 2020, (due to covid, no doubt), so some gas stations were reported to be losing money on gas sales).

The owner of both Broadway gas stations has deep pockets, and often leaves development sites inactive for many years. Concord Pacific own both 1368-98 W Broadway and 1795 W Broadway, and unlike their various False Creek sites, the Molson's Brewery, St Paul's Hospital and the Westin Bayshore they have indicated they are actively pursuing rezonings on the West Broadway gas station sites. (They were rumoured to have bought the last gas station Downtown, at Davie and Burrard, as well).

(Trucking contaminated soil to Alberta for disposal cost over $1,000 per cubic metre from BC in 2015, so there would have to be very little material to only cost $100,000).
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/

Last edited by Changing City; Nov 18, 2025 at 2:50 AM.
Reply With Quote
     
     
  #3265  
Old Posted Nov 20, 2025, 12:51 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,159
Reply With Quote
     
     
  #3266  
Old Posted Nov 20, 2025, 9:18 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,159
Quote:
Here’s a track tracker update!

In the westbound tunnel, rail has now been installed all the way to Arbutus Station.

In the eastbound tunnel, crews continue to pull rail into place. Once in place, crews carefully align the rails for installation.

https://x.com/broadwaysubway_/status/1991606280432050360
Reply With Quote
     
     
  #3267  
Old Posted Nov 23, 2025, 4:42 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,159
Traffic deck girders are down to a partial span next to the headhouse at Main.


https://trafficcams.vancouver.ca/mainBroadway.htm

Last edited by madog222; Nov 23, 2025 at 8:11 PM.
Reply With Quote
     
     
  #3268  
Old Posted Nov 24, 2025, 6:00 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,640
Station entrance roof/columns from last week

Video Link
Reply With Quote
     
     
  #3269  
Old Posted Nov 24, 2025, 6:54 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,607
Quote:
Originally Posted by madog222 View Post
Traffic deck girders are down to a partial span next to the headhouse at Main.


https://trafficcams.vancouver.ca/mainBroadway.htm
4 month total shutdown to re-do this still seems insane.
Reply With Quote
     
     
  #3270  
Old Posted Nov 24, 2025, 7:09 PM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,186
Quote:
Originally Posted by WarrenC12 View Post
4 month total shutdown to re-do this still seems insane.
And that's just Mount Pleasant station, is every station going to be a 4-month shut down? That'll be 20 months of shutdowns if they're all back-to-back.
Reply With Quote
     
     
  #3271  
Old Posted Nov 24, 2025, 7:36 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,795
Quote:
Originally Posted by mcj View Post
And that's just Mount Pleasant station, is every station going to be a 4-month shut down? That'll be 20 months of shutdowns if they're all back-to-back.
Meanwhile Japan……

https://www.theguardian.com/world/video/...ad-48-hours-after-sinkhole-appears-video
Reply With Quote
     
     
  #3272  
Old Posted Nov 24, 2025, 7:49 PM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,157
So close, yet so far. Tracks installed all the way to Arbutus, but still a bit under 2 years to go. I'm betting it will be ready to go by Labour Day (first day of classes) 2027, then the government can pat itself on the back for opening early.

And at least the buses can get through the Mt. Pleasant intersection through the detour, but 12th Ave/West 2nd is going to be insane.
Reply With Quote
     
     
  #3273  
Old Posted Nov 24, 2025, 8:39 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,640
Quote:
Originally Posted by mcj View Post
And that's just Mount Pleasant station, is every station going to be a 4-month shut down? That'll be 20 months of shutdowns if they're all back-to-back.
Well it's four months of total closure + 4 months of single lane traffic so there will be some overlap in the rebuilding of the roads.
Reply With Quote
     
     
  #3274  
Old Posted Nov 27, 2025, 4:29 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,795
2025, Nov 26

@ Broadway City Hall, west of Cambie St.

Untitled by Lexus LX 700, on Flickr

Untitled by Lexus LX 700, on Flickr

Untitled by Lexus LX 700, on Flickr
Reply With Quote
     
     
  #3275  
Old Posted Nov 28, 2025, 3:31 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,617
In reference to traffic decks - here's a pic of the traffic deck over Seymour St. for construction of Granville Station
which has a ticketing hall directly under Seymour St.. I remember that the deck itself was made of heavy wood timbers.

on Page 24 of the Transit Museum Society SkyTrain Gallery.
https://transitmuseumsociety.org/wp/photo-albums-skytrain/


https://transitmuseumsociety.org/wp/photo-albums-skytrain/
Reply With Quote
     
     
  #3276  
Old Posted Nov 28, 2025, 3:46 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,640
Quote:
Originally Posted by officedweller View Post
In reference to traffic decks - here's a pic of the traffic deck over Seymour St. for construction of Granville Station
which has a ticketing hall directly under Seymour St.. I remember that the deck itself was made of heavy wood timbers.

on Page 24 of the Transit Museum Society SkyTrain Gallery.
https://transitmuseumsociety.org/wp/photo-albums-skytrain/

https://transitmuseumsociety.org/wp/photo-albums-skytrain/
20:29 of this video has a quick glimpse of the deck/Seymour. I think the thing shown is some kind of utilities support but who knows.

Video Link
Reply With Quote
     
     
  #3277  
Old Posted Nov 28, 2025, 4:14 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,617
Quote:
Originally Posted by jollyburger View Post
20:29 of this video has a quick glimpse of the deck/Seymour. I think the thing shown is some kind of utilities support but who knows.
The bridge deck was on a Bailey Bridge. - the superstructure is a typical Bailey Bridge design.


https://www.ibeehivesteelstructures.com/...-between-bailey-bridge-and-truss-bridge/
Reply With Quote
     
     
  #3278  
Old Posted Dec 4, 2025, 12:26 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,159
Reply With Quote
     
     
  #3279  
Old Posted Dec 4, 2025, 11:01 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,640
Looks like a mobile crane is removing some temporary stairs from the west side of Cambie I assume to start backfilling.



https://trafficcams.vancouver.ca/
Reply With Quote
     
     
  #3280  
Old Posted Dec 14, 2025, 5:04 AM
gaviscon gaviscon is offline
Registered User
 
Join Date: Nov 2021
Posts: 768
Emily Carr Stn entrance

Dec 11

20251211_162208 by globalbusinesscentre105 H, on Flickr
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:05 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.