Quote:
Originally Posted by officedweller
The best way would be from the greenway across the loop to an underpass curving to the middle of Granville and emerging from a portal in the centre lanes where the road is still on dirt.
|
Slightly out of date; the current plan is to run the tram straight down 6th itself
(page 10), and the loop redesign is very much one-way
(page 45), so 5th seems to be off the table.
And there's no preexisting ROW, so you're talking about cutting across at least two traffic lanes, the crosswalk and possibly the "bus" lane. I'm not saying it
can't work, I'm saying it's probably more trouble than it's worth.