Originally Posted by Jebby View Post
I don't see how that's the fault of the 3P process, though. It was built to the spec required by the government, wasn't it?
The private partners did the design. There wasn't really specs set out by the government at the time other than build a train from Richmond/Airport to downtown.

Straight from wikipedia:

Quote:
The P3 process did not allow precise plans to be developed with public consultation, but limited discussion to certain abstract parameters, while leaving actual design details to the private partner.
This is a better project that was developed with the future in mind.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:37 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.