Quote:
Originally Posted by Jebby
I don't see how that's the fault of the 3P process, though. It was built to the spec required by the government, wasn't it?
|
The private partners did the design. There wasn't really specs set out by the government at the time other than build a train from Richmond/Airport to downtown.
Straight from wikipedia:
Quote:
|
The P3 process did not allow precise plans to be developed with public consultation, but limited discussion to certain abstract parameters, while leaving actual design details to the private partner.
|
This is a better project that was developed with the future in mind.