Old Posted May 8, 2025, 10:49 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
I don't think there will be an underground connection through to Emily Carr?


https://rezoning.vancouver.ca/applicatio...1850-thornton-st/application-booklet.pdf
Reply With Quote
     
     
  #3062  
Old Posted May 9, 2025, 1:52 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,813
Quote:
Originally Posted by officedweller View Post
I don't think there will be an underground connection through to Emily Carr?
I don't think so. PCI/Low Tide's development doesn't seem to provide a secondary entrance? There's some kind of P1 pavilion space surrounding the new station.

https://rezoning.vancouver.ca/applicatio...1850-thornton-st/application-booklet.pdf
Reply With Quote
     
     
  #3063  
Old Posted May 22, 2025, 7:22 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is online now
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,395
does anyone know when CAMBIE street will go back to full lanes at Broadway?

I see here in Nov 2021 they started work on the "sewerline on cambie" >>

As part of the Broadway Subway project’s extension of the Millennium Line with a new station at Broadway-City Hall, the sewer lines running beneath Cambie Street are being relocated. During this work, traffic will be reduced to four lanes and shifted to the east side of Cambie Street between W 7th and W 12th avenues.

and as per the article >> A major Vancouver street will be missing several lanes for the next few months.

here we are 4.5 years later here and Cambie is still a mess ...... WHY? anyone know whats up?


https://www.vancouverisawesome.com/local...ncouver-street-until-spring-2022-4780672
Reply With Quote
     
     
  #3064  
Old Posted May 22, 2025, 7:43 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,813
Quote:
Originally Posted by hollywoodnorth View Post
does anyone know when CAMBIE street will go back to full lanes at Broadway?

I see here in Nov 2021 they started work on the "sewerline on cambie" >>

As part of the Broadway Subway project’s extension of the Millennium Line with a new station at Broadway-City Hall, the sewer lines running beneath Cambie Street are being relocated. During this work, traffic will be reduced to four lanes and shifted to the east side of Cambie Street between W 7th and W 12th avenues.

and as per the article >> A major Vancouver street will be missing several lanes for the next few months.

here we are 4.5 years later here and Cambie is still a mess ...... WHY? anyone know whats up?


https://www.vancouverisawesome.com/local...ncouver-street-until-spring-2022-4780672
I think it's because of the connection passageway between the Canada and subway platforms? I assume there was zero point of re-opening the lanes after they moved the utilities if they had to close them again later for the passageway. Throw in all the delays in the station construction which probably needed to complete before they could start work on the passageway.
Reply With Quote
     
     
  #3065  
Old Posted May 22, 2025, 8:03 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,216
^
Cambie restored 2026 looks more likely than late this year.




Images from City of Vancouver
Reply With Quote
     
     
  #3066  
Old Posted May 22, 2025, 8:13 PM
AlessioSBT AlessioSBT is online now
Registered User
 
Join Date: May 2024
Posts: 116
If we are talking about lanes, what's the plan for Broadway?

I remember, but maybe i'm wrong, that someone here said that the blocks of the new stations will have the new sidewalks layout (that makes sense because i don't see the point in making everything from scratch now and then re-doing it in the future).
But the plan for Broadway is to have less lanes, so how is that gonna work? After the Skytrain is done we will have the street becoming narrower and expanding again every 4-5 blocks?
Reply With Quote
     
     
  #3067  
Old Posted May 22, 2025, 8:46 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 956
Yes. Basically no parking along newly built station blocks (parking taken up by new widened sidewalks), then parking in the existing bus lane along non-station blocks.
Reply With Quote
     
     
  #3068  
Old Posted May 22, 2025, 8:48 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,216
Quote:
Originally Posted by AlessioSBT View Post
After the Skytrain is done we will have the street becoming narrower and expanding again every 4-5 blocks?
Yup, current plan is for the rest of Broadway to be converted as properties along the blocks are redeveloped.
Reply With Quote
     
     
  #3069  
Old Posted May 22, 2025, 9:04 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,731
The continued closure of Cambie lanes on the north side of Broadway is annoying. Traffic would be improved if they opened those up for at least a right turn lane.
Reply With Quote
     
     
  #3070  
Old Posted May 22, 2025, 9:52 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,813
Quote:
Originally Posted by WarrenC12 View Post
The continued closure of Cambie lanes on the north side of Broadway is annoying. Traffic would be improved if they opened those up for at least a right turn lane.
Where are the construction workers going to park?!?!?!?

Reply With Quote
     
     
  #3071  
Old Posted May 23, 2025, 12:43 AM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,679
Quote:
Originally Posted by jollyburger View Post
Where are the construction workers going to park?!?!?!?

Side streets
Reply With Quote
     
     
  #3072  
Old Posted May 23, 2025, 11:42 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,216
Quote:
Originally Posted by WarrenC12 View Post
Traffic would be improved if they opened those up for at least a right turn lane.
There is a right turn lane…

It sure sounds like the two of you doing the complaining about this haven’t even been there.
Reply With Quote
     
     
  #3073  
Old Posted May 23, 2025, 4:04 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,519
Quote:
Originally Posted by madog222 View Post
There is a right turn lane…

It sure sounds like the two of you doing the complaining about this haven’t even been there.
There's a two-lane pinch point on Cambie SB at 8th. It reduces to two lanes there for about 2/3 of the block, ever since construction started.

That closed portion contains nothing but worker parking now. They could leave that lane open to facilitate right-turning traffic SB --> WB.
Reply With Quote
     
     
  #3074  
Old Posted May 23, 2025, 4:41 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,731
Quote:
Originally Posted by madog222 View Post
There is a right turn lane…

It sure sounds like the two of you doing the complaining about this haven’t even been there.
I walk by this intersection every day. It's been a ******* shitshow for years.

The whole thing is painfully visible from google maps sat view.
Reply With Quote
     
     
  #3075  
Old Posted May 23, 2025, 10:48 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,338
Quote:
Originally Posted by WarrenC12 View Post
I walk by this intersection every day. It's been a ******* shitshow for years.

The whole thing is painfully visible from google maps sat view.
That Google map view shows why the west side of Cambie north of Broadway remain closed off. Traffic is funneled into two lanes, and then a third, short, right turn lane opens up to allow about four cars to make the right turn.

There's no left turn allowed headed south from Cambie on the constrained lanes. On the south side of the intersection there's still a deep hole, with a crane parked in the street, with continuing construction. There are only two southbound traffic lanes past it, so having more capacity on the north side would just lead to vehicles needing to merge. By limiting the street to two lanes north of Broadway, (but with an allowance for the few right turning vehicles), when the light turns green, the majority of the vehicles - those that are heading straight on up Cambie - can proceed easily without any need for lane changing or merging.
Reply With Quote
     
     
  #3076  
Old Posted May 23, 2025, 10:58 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,731
Quote:
Originally Posted by Changing City View Post
That Google map view shows why the west side of Cambie north of Broadway remain closed off. Traffic is funneled into two lanes, and then a third, short, right turn lane opens up to allow about four cars to make the right turn.

There's no left turn allowed headed south from Cambie on the constrained lanes. On the south side of the intersection there's still a deep hole, with a crane parked in the street, with continuing construction. There are only two southbound traffic lanes past it, so having more capacity on the north side would just lead to vehicles needing to merge. By limiting the street to two lanes north of Broadway, (but with an allowance for the few right turning vehicles), when the light turns green, the majority of the vehicles - those that are heading straight on up Cambie - can proceed easily without any need for lane changing or merging.
Thanks for your written description for those who can't load google maps and look for themselves.
Reply With Quote
     
     
  #3077  
Old Posted May 23, 2025, 11:03 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,805
Quote:
Originally Posted by WarrenC12 View Post
Thanks for your written description for those who can't load google maps and look for themselves.
I was going to say this: "What he's trying to say is that the closed northbound lanes don't really reduce capacity as much as you might think since even in the past there was effectively only two through lanes anyway. When the rightmost lane was open it wasn't a through lane because it always held cars waiting for pedestrians to clear the crosswalk before turning right."

And then I went at looked at the historical Google Earth view for June 2019 and by golly there actually were three through lanes PLUS a dedicated right turn lane.

So yeah, capacity is now roughly 2/3 of what it used to be, which is pretty significant at peak times.
Reply With Quote
     
     
  #3078  
Old Posted May 27, 2025, 9:43 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,216
Reply With Quote
     
     
  #3080  
Old Posted May 28, 2025, 4:40 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,813
Quote:
Traffic Alert – E. Broadway lane reductions between Main and
Quebec streets starting May 26
• E. Broadway will be reduced to one lane in each direction between Main and Quebec streets starting at 10 a.m. Monday, May 26 and continuing approximately seven weeks to support utility works.
Credit: Broadway Subway
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:07 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.