Old Posted Oct 28, 2024, 10:21 PM
lrt's friend lrt's friend is offline
 
Join Date: Dec 2006
Posts: 12,815
Quote:
Originally Posted by DTcrawler View Post
The botched Line 2 <-> Line 4 transfer situation still has me absolutely enraged. The original plan would’ve made the extra transfer basically a non-factor. The pocket track plan was supposed to be the saving grace of the whole decision to run airport service as a spur line.

As I said before, this better be a temporary measure simply to finally get the delayed project open, because I’m not going to let them get away with trying to let us forget what the original plan was.
I have been waiting for 18 years, and overall, there will be more transfers, longer walks and slower travel times. I have long ago given up.

Sorry to say this, but you are much more likely to get a lump of coal than the fix you are hoping for. Their plans didn't work out. Too bad to the public. Most won't notice or care.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.