HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Oct 28, 2024, 3:04 PM
Uhuniau Uhuniau is offline
 
Join Date: Jan 2010
Posts: 9,104
Quote:
Originally Posted by lrt's friend View Post
As I have said in the past, if Line 2 reaches capacity, we will need even longer trains or we need to build the Bank Street subway. When the city reaches 2M, we will need the latter.
We really ought to be engaging in, at minimum, some future-proofing about this (and a few other transit-connected transportation issues), if it's too early to do any actual planning.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.