Quote:
Originally Posted by lrt's friend
As I have said in the past, if Line 2 reaches capacity, we will need even longer trains or we need to build the Bank Street subway. When the city reaches 2M, we will need the latter.
|
We really ought to be engaging in, at minimum, some future-proofing about this (and a few other transit-connected transportation issues), if it's too early to do any actual planning.