Quote:
Originally Posted by chowhou
As far as I understand it, the 41st/49th corridor is doing just fine with bus capacity, and 49th is set to get a major bus lane expansion with the recent motion passed by city council (along with limited 41st bus lane expansion).
I personally find it very hard to believe that 41st/49th would have any priority over the North Shore, Surrey, and the PoCo-Pitt Meadows-Maple Ridge corridor. Hell I think we're more likely to see rail transit to Squamish before a 41st/49th route. (Bear in mind, the 41st/49th corridor is not a convenient right of way! Imagine the cost of tunnelling...)
|
2023 Busiest Bus Routes
Quote:
99 B-Line: 11.31 million
1. 99 B-Line: 11.31 million
2. R4 UBC/Joyce-Collingwood Station RapidBus: 8.84 million
3. 49 Metrotown Station/UBC: 8.45 million
4. 319 Scott Road Station/Newton Exchange: 6.83 million
5. 25 Brentwood Station/UBC: 6.64 million
6. 16 29th Avenue Station/UBC: 5.35 million
7. R1 Surrey Central Station/Newton Exchange: 4.88 million
8. R5 Burrard Station/SFU RapidBus: 4.67 million
9. 5/6 Robson/Downtown: 4.53 million
10. 19 Metrotown Station/Stanley Park: 4.49 million
|
https://dailyhive.com/vancouver/translink-metro-vancouver-public-transit-ridership-statistics-2023
The R4 and 49 are comparable to the 99 B-line, you know, that extremely busy bus route that needed a Skytrain. The 41/49 corridor is beyond any other route in terms of ridership. The only reason BIRT should be considered above it is because it would provide capacity relief for the bridges over the Burrard Inlet.
So evidently, this route is more worthy of Skytrain than the PoCo-Pitt Meadows-Maple Ridge corridor, that already has the R3 that only has a measly 1,000,000 annual riders. I think KGB should get Skytrain, but mostly because it would be better to build it now before the area develops, than later, not because the current ridership actually demands it.
In terms of convenience, I agree, it would be hard to do, but that doesn't mean it shouldn't be done. There is always the option to remove a lane to install an elevated guideway too.