Originally Posted by HighwayStar View Post
Can we please ask the very basic question of, “how many people outside of the 9-5 PS commuters will actually use a train to get from Kanata to downtown?”. Sure.. easier to get to Algonquin, Bayshore, etc, but the 2 Billion $ question is…. do we *really* need all that capacity from 5am to 1am?
The "2 Billion $" is for the entire Moodie to Hazeldean Rd extension. As mentioned in post #1222, the segment from Moodie to Terry Fox was estimated to cost $710 million, which is good value for money as I indicated in the following post:
Quote:
Originally Posted by roger1818 View Post
If you consider it is about 6.4 km from Moodie to Terry Fox and about 3 km from Terry Fox station to Palladium and 1.9 km from Palladium to Hazeldean, we end up with the cost per km as follows:
  1. Moodie station to Terry Fox station: $110.94 million / km
  2. Terry Fox station to Palladium station: $213.33 million / km
  3. Palladium station to Hazeldean station: $263.16 million / km

From that, we should only do Moodie station to Terry Fox station.
Having fast frequent service to downtown from a central location with ample parking will make it easier to use during evenings and weekends (when the connecting bus service isn't as good).
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:26 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.