Quote:
Originally Posted by Feathered Friend
If memory serves, back when it was planned as a two phase development, the peak of construction envisioned 17 tower cranes on site. I wonder if that will go up now that it's being done all at once.
|
Wasn't it originally 6 phases?
https://council.vancouver.ca/20140218/documents/p6appendixJ.pdf
The two phase plan seems like it was 2024 & 2026 so you assume that 17 is fairly close to the max number of cranes. Maybe an extra one for a total demo of the office tower.