Quote:
Originally Posted by WarrenC12
That's up from the Lougheed side and would terminate at a M-Line station though.
|
The Hastings Line would be sometime near 2040-2050; sounds to me like enough time would've passed to consider a second gondola.
Alternatively, the line could turn south to Brentwood and River District and SFU riders could transfer to the Millennium. There
are options that don't include rail up the mountain, is all I'm saying.