Quote:
Originally Posted by Bdawe
They've been doing some work all up and down the line lately. They replaced the switch at Slocan Street where it goes from one track through the cut to two. They've replaced rails all up and down the BI Line, and they are building the new siding between Piper and Willingdon in Burnaby. It *seems* like they might be clearing the right of way for double tracking on the BI Line, but not sure when the second track will go in
|
If they double track this line are there plans for any new overpasses?
I don't think ALL the streets need them, but Venables will likely benefit from one as well as incorporating a bike overpass from Union (perhaps a horseshoe design for the bike overpass)?
This would put La Casa Gelato in its shadow, but I think they almost would need to purchase that property to double track the line around there.
If you pull up a Google maps image right now there's a train passing, which kind of tell you how busy that section of track is if it got caught on the satellite pass.
It looks like Apple Maps digitally strips most of the trains from the maps, nice.
The Transition from 2 to 1 track around Union (Apple and Google Maps):
https://www.screencast.com/t/KziPPKR6Qz
https://www.screencast.com/t/kD9Bio90
Tracks including yard and Hastings Overpass (Apple and Google Maps):
https://www.screencast.com/t/0Mb7ojJwe
https://www.screencast.com/t/8sgMejmDO