Quote:
Originally Posted by WarrenC12 View Post
That's up from the Lougheed side and would terminate at a M-Line station though.
The Hastings Line would be sometime near 2040-2050; sounds to me like enough time would've passed to consider a second gondola.

Alternatively, the line could turn south to Brentwood and River District and SFU riders could transfer to the Millennium. There are options that don't include rail up the mountain, is all I'm saying.
Reply With Quote
     
     
  #2362  
Old Posted Nov 13, 2019, 11:02 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Cascadia HSR

Quote:
Originally Posted by VancouverOfTheFuture View Post
even less likely to happen now. i still don't see where all this money will come from. California is the population of Canada, and look what happened. sure it would be cool, and i am sure it would change things. but $50 billion doesn't grow on trees.
Yes! at $ 50 billion, that's an expensive project by any standard.
Call me old-fashioned or as you will, but perhaps, starting incrementally, upgrading portions of the existing railway to accomodate HrSR would be a start.
Even if at only 90 m/ph, that's faster than a car or bus, and is the same speed as AMTRAK's Southwest Chief.
A more modest capital investment would suffice for that. Then, seeing if it successful or not, go whole-hog to true HSR, "TGV" or "Shinkansen" style of thing.
I'm sure that even at 90 mph, using more modern, lightweight rolling stock, it would still be an attractive option to the bus, or driving, if the ticket $ costs are
cheaper than the plane.
Then again, maybe not. (most people will reject this option as "not enough", though the other options, at $50 billion, are just too over-the-top)
Reply With Quote
     
     
  #2363  
Old Posted Nov 13, 2019, 11:53 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by WarrenC12 View Post
Is there anything rail that can climb to SFU? I'd argue anything we consider down Hastings should be able to get there.
Skytrain is limited to 6% grade and I think someone said on here that the Canada Line (conventional rail) is limited to 4.5% grade. I really doubt LRT would be any higher than that. This has come up on here before and the grade of Burnaby Mountain is more than 6% - that's why they're planning a gondola instead of rail.
Reply With Quote
     
     
  #2364  
Old Posted Nov 14, 2019, 2:00 AM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,667
Quote:
Originally Posted by Sheba View Post
Skytrain is limited to 6% grade and I think someone said on here that the Canada Line (conventional rail) is limited to 4.5% grade. I really doubt LRT would be any higher than that. This has come up on here before and the grade of Burnaby Mountain is more than 6% - that's why they're planning a gondola instead of rail.
Why not a funicular-like rail transit system?
Reply With Quote
     
     
  #2365  
Old Posted Nov 14, 2019, 2:22 AM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,729
Quote:
Originally Posted by cganuelas1995 View Post
Why not a funicular-like rail transit system?
Because a gondola is probably cheaper and easier to install.
Reply With Quote
     
     
  #2366  
Old Posted Nov 14, 2019, 4:19 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,114
with the Seattle-Vancouver high speed rail link how much is Canada expected to contribute?

people in Chilliwack seem kinda pissed about it based on comments I've been reading.
__________________
belowitall
Reply With Quote
     
     
  #2367  
Old Posted Nov 14, 2019, 5:08 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by SpongeG View Post
with the Seattle-Vancouver high speed rail link how much is Canada expected to contribute?

people in Chilliwack seem kinda pissed about it based on comments I've been reading.
I haven't seen any specific numbers - but we're only paying for the portion in BC, so not much of the total budget.
Reply With Quote
     
     
  #2368  
Old Posted Nov 14, 2019, 5:54 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by Sheba View Post
I haven't seen any specific numbers - but we're only paying for the portion in BC, so not much of the total budget.
but a lot more than the Broadway Subway all the way to UBC which we balk at... and that subway benefits way more than the HSR will.
Reply With Quote
     
     
  #2369  
Old Posted Nov 14, 2019, 9:50 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Quote:
Originally Posted by SpongeG View Post
with the Seattle-Vancouver high speed rail link how much is Canada expected to contribute?

people in Chilliwack seem kinda pissed about it based on comments I've been reading.
Why the people in Chilliwack in particular? And what are they disppointed or angry with, please?
Reply With Quote
     
     
  #2370  
Old Posted Nov 14, 2019, 7:14 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,729
Quote:
Originally Posted by trofirhen View Post
Why the people in Chilliwack in particular? And what are they disppointed or angry with, please?
I'm guessing that they think it should somehow go out to Chilliwack, even though the geography is completely against doing that. Or do they think the HSR is going to make a 50 kilometer loop out just to service them?
Reply With Quote
     
     
  #2371  
Old Posted Nov 14, 2019, 7:15 PM
lokyin lokyin is offline
Registered User
 
Join Date: Jul 2003
Posts: 61
Quote:
Originally Posted by VancouverOfTheFuture View Post
but a lot more than the Broadway Subway all the way to UBC which we balk at... and that subway benefits way more than the HSR will.
Not necessarily.... depends what you mean by 'benefits'.
Reply With Quote
     
     
  #2372  
Old Posted Nov 14, 2019, 7:33 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,178
Quote:
Originally Posted by lokyin View Post
Not necessarily.... depends what you mean by 'benefits'.
Future's right on at least that part. $6-7 billion for 70+ million boardings a year is already like pulling teeth; $5-17 billion (even split, or per distance) for 1-2 million boardings a year is going to be a much harder sell.
Reply With Quote
     
     
  #2373  
Old Posted Nov 14, 2019, 7:56 PM
lokyin lokyin is offline
Registered User
 
Join Date: Jul 2003
Posts: 61
Quote:
Originally Posted by BCPhil View Post
I think Hastings and Broadway are vastly different.

The difference is that Hastings isn't a huge employment center and has fewer residents.

The 009 travels 10km and has a catchment of 204K residents and employees. The 095 has a 17km length and passes 201K residents and employees. And that counts passing through the core of downtown and SFU for the 095. There are a lot more jobs on the 095 than the 009, but again, the 095 passes through the CBD.

If we count just residents, then the Broadway Corridor has 118,000 riders vs Hastings at 78,000, and Hastings is 7km longer.

There is already a Skytrain option just south of most of Hastings, and another line just south of that. It seems a little over redundant.

And unlike other LRT situations, where losing lanes greatly impacts congestion, I don't think anyone considers Hastings to be the best route to drive through the city as it is. If the curb lanes transformed into 24 hour dedicated LRT tracks, really no vehicle lanes would be lost.

I'm not saying it's ridiculous to put Skytrain down Hastings, but in it's current state, it seems prime for LRT. It could also serve as an LRT trunk line and have branches off it on streets like Main, Commercial, and Renfrew. Those lines could be used to increase distribution capacity around the east side to and from existing Skytrain lines.
Thanks for the numbers! Certainly gives a lot of context to substantiate the discussion.

Based on those numbers, Hastings certainly doesn't compare to Broadway, but I'm curious what the development/density potential is for the Hastings if it had a Skytrain line, compared to the UBC extension. Would we have a better ability to densify the Hastings corridor to create "town centres" at say Hastings & Commercial, Kootenay, Willingdon, Kensington (like how they're hub-ifying with tall towers at Brentwood, Lougheed, Coquitlam? Burnaby seems to be good at doing that (compared to CoV...)

And then if we compare that to the potential of, say, Broadway/Alma and Broadway/Macdonald's potential for higher density residential/employment. I mean, besides the current ridership numbers, perhaps the Skytrain deserves a shot at Hastings as a tool to create more viable density for the region.

And another idea... perhaps a Hastings Skytrain line can go to Kootenay Loop then turn north to tunnel through Burrard to north shore to Phibbs? Seems like an easier crossing there.

Wondering if an eastward Hastings line would actually get more "mayor's council" votes as it benefits more of the mayors / districts.
Reply With Quote
     
     
  #2374  
Old Posted Nov 14, 2019, 8:01 PM
lokyin lokyin is offline
Registered User
 
Join Date: Jul 2003
Posts: 61
Quote:
Originally Posted by Migrant_Coconut View Post
Future's right on at least that part. $6-7 billion for 70+ million boardings a year is already like pulling teeth; $5-17 billion (even split, or per distance) for 1-2 million boardings a year is going to be a much harder sell.
For sure on ridership per cost, but I mean in terms of value of attracting more businesses and economic growth to the region as a result of that UHSR (which I don't have #s for haha...)
Reply With Quote
     
     
  #2375  
Old Posted Nov 14, 2019, 8:07 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,178
Well, the Broadway extension is sure to bring plenty of business & economic growth to the Corridor; it's local rather than regional, but significant regardless.
Reply With Quote
     
     
  #2376  
Old Posted Nov 15, 2019, 1:06 AM
Anorak Anorak is offline
Registered User
 
Join Date: Mar 2016
Posts: 115
Quote:
Originally Posted by VancouverOfTheFuture View Post
but a lot more than the Broadway Subway all the way to UBC which we balk at... and that subway benefits way more than the HSR will.
I mean the two aren't mutually exclusive, also high speed rail can be profitable, in contrast to Subways which generally aren't.
Reply With Quote
     
     
  #2377  
Old Posted Nov 15, 2019, 1:23 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,180
Quote:
Originally Posted by VancouverOfTheFuture View Post
but a lot more than the Broadway Subway all the way to UBC which we balk at... and that subway benefits way more than the HSR will.
HSR could also function as a commuter service between Surrey and Vancouver. A 6 minute service would be a major addition to the regional network, maybe just as valuable as the Broadway Line.
Reply With Quote
     
     
  #2378  
Old Posted Nov 19, 2019, 5:39 AM
ssiguy ssiguy is online now
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,983
Ottawa will NEVER, EVER contribute one dime towards this project before it gives billions to a similar line in the Windsor-Quebec City Corridor. Any HSR funding in Canada is going straight to The Corridor and anyone who thinks that's not the case is, forgive my bluntness, dilusional.
Reply With Quote
     
     
  #2379  
Old Posted Nov 19, 2019, 9:13 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Quote:
Originally Posted by ssiguy View Post
Ottawa will NEVER, EVER contribute one dime towards this project before it gives billions to a similar line in the Windsor-Quebec City Corridor. Any HSR funding in Canada is going straight to The Corridor and anyone who thinks that's not the case is, forgive my bluntness, dilusional.
You are 100% correct, IMO. Why? The Windsor-QC corridor is where the majority of Canadians live, and where the greatest number of federal ridings are, and where the votes are. Voilà.
And speaking of HSR in that corridor, although a true HSR is planned and may be in the works, the current fastest train in Canada is about as fast as some Paris commuter railways.
https://www.youtube.com/watch?v=XMRS_qi4s0Q
Reply With Quote
     
     
  #2380  
Old Posted Nov 19, 2019, 2:08 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by ssiguy View Post
Ottawa will NEVER, EVER contribute one dime towards this project before it gives billions to a similar line in the Windsor-Quebec City Corridor. Any HSR funding in Canada is going straight to The Corridor and anyone who thinks that's not the case is, forgive my bluntness, dilusional.
Western Alienation is a worry of this government. If they were asked by the US government to pay $1B for the section in Canada, they would. Then it would be a great way to show they care about anything west of the 89th Meridian.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:33 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.