Speaking of updates, would anyone be able to check the status of the following buildings, to see if they're completed yet? If you're in the area it would be great if you'd just take a look... if all visible construction work is done and the building is occupied, then we could call it finished.
In parentheses after each building I've written what needed to be done last time I saw the building.
- Marquee Michigan Avenue (windows on top 2 floors should be fully installed)
- 600 North Lake Shore Drive, North (needs to be open and occupied)
- MoMo (upper northeast corner should be fully clad)
- The Fairbanks at Cityfront Center (east facade should be fully clad with all panels in place)
- CBS 2 Broadcast Center (base needs to be finished and building occupied)
- Dwight Building (needs to be occupied)
- Emerald, North Tower (some cladding details, needs to be occupied)
Thanks very much in advance! It would be very nice to be able to keep up month-by-month coverage of which high-rises are finished in Chicago.
|