HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 20, 2026, 11:21 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,061
Quote:
Originally Posted by Biff View Post
A rail overpass would likely run $40 to $60m...in Manitoba.
No idea how they got their numbers but here it is from the design study:

CEMR Carman Subdivision Rail Grade Separation: Three alternatives were investigated for this location: (1) grade-separation on existing alignment; (2) realignment to CN Rivers Subdivision (west of PTH 100); (3) and realignment to Four Mile Road / Wyper Road Interchange (west of PTH 100). The grade-separation on the existing alignment was selected as the preferred alternative, as the relocation alternatives were deemed not feasible in terms of the ease of being able to purchase and obtain additional right-of-way for rail relocation. For the Initial Stage, twin two-lane east-west structures are
proposed. For the Ultimate Stage, the twin east-west structures are proposed to be widened to three lanes.

Page 13
https://www.gov.mb.ca/mti/hpd/pth100/pdf/south_perimeter_design_study_final_report.pdf
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:45 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.