HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #31  
Old Posted Mar 20, 2026, 9:20 PM
snopas snopas is offline
Registered User
 
Join Date: Dec 2024
Posts: 3
Quote:
Originally Posted by mhays View Post
Actually I'm confused. Is the idea to build the full bridge width in the initial phase (two bridges apparently), and just not do anything in the rest of the corridor?
Yes, the plan is to in the near-term build the two bridges over the Columbia River, link them up at either end, build light rail to Vancouver Waterfront, and remove the existing bridges. The rest of the 5 mile corridor is to be phased in afterward. They have also planned for a possible "Step 1" approach should they be unable to close a 2.2 B funding gap, where the bridges are constructed with room for light rail but the tracks and stations are left yet to be built.






Link to full presentation: https://www.interstatebridge.org/media/vtfdtrwx/20260317_esg_meeting_presentation_remediated.pdf

Last edited by snopas; Mar 20, 2026 at 9:42 PM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:39 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.