Originally Posted by jollyburger
They were excavating/putting up cranes in May 2023. In 2024 Tower 3 was at level 3. A year later I think they were close to topped out in 2025 but then that was around the time when all the cladding work stopped and work slowed.
I mean some of the towers are shorter and the floorplates seem more straight forward than the Phase 1 towers.
https://dailyhive.com/vancouver/senakw-s...-vancouver-towers-construction-july-2024
PS. It seems like the remaining trigons facing the north side were installed.
|
My bad, I thought phase 2 was the (much larger) towers that ran directly alongside the bridge on the east side. In that case, phase 2 timing seems reasonable.