HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 24, 2025, 6:39 PM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 932
https://www.flickr.com/photos/reginaconstruction/ https://www.youtube.com/@gecho194/videos

Building assembly line started at the Rosewood Avana project. After passing it numerous times I finally stopped to get a shot of the condo project in Harbour Landing building 2 more of the buildings already in that location. It has ground floor indoor parking. Roundabout construction started for the Grand Coulee exit, traffic detoured to the new ramp on the east side.





Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 11:08 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.